Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹20.0 CrAccepted-AOC | ₹20.0 Cr | 1 | Accepted-AOC First lowest qualified bidder |
| 2 | 2₹22.8 CrRejected-AOC | ₹22.8 Cr | 2 | Rejected-AOC Second lowest bidder |
| 3 | 3₹24.7 CrRejected-AOC | ₹24.7 Cr | 3 | Rejected-AOC Third lowest bidder |
| 4 | 4₹24.9 CrRejected-AOC | ₹24.9 Cr | 4 | Rejected-AOC Fourth Lowest bidder |
| 5 | 5₹24.9 CrRejected-AOC 3RD FLOOR ROOM NO 3004 A LAXMIPRIYA 752101 KHORDHA ODISHA INDIA | KHORDHA | ODISHA | 752101 | ₹24.9 Cr | 5 | Rejected-AOC Fifth lowest bidder |
Tender Value
Refer Docs
Closing Date
13 Dec 2021, 5:00 pmClosed
Chief Engineer and Basin Manager, RBVN Basin, Berh
Office of the Chief Engineer and Basin Manager, RBVN Basin, Berhampur, Courtpeta PIN-760004
In stream storage structure across River Dhanei near village Sanabaragam in Polasara Block of District Ganjam Odisha
2021_CEBMB_72533_1
CE and BM RBVN -06/2021-22
National Competitive Bid
Civil Works - Others
540 days
Polosara
Please refer Tender documents.
5 documents required · 5 mandatory
₹10,000
Exempted
Office of the Chief Engineer and Basin Manager, RB
5 May 2022
12 Nov 2021
14 Dec 2021
12 Nov 2021
13 Dec 2021
12 Nov 2021
12 Nov 2021 - 26 Nov 2021
26 Nov 2021
Amount
Construction of In-stream storage structures across river Dhanei near village Sanabaragam in Polasara block of Ganjam District including hydro-mechanical works, Power connectivity works, road connectivity, staff quarters,construction of afflux bund/guide bund/protection works of main river & all upstream tributaries with specific flood protection works comprising of RCC Retaining Wall of 300m length near village Sanabaragam, construction of launching appron with back filling upto TBL near village Sanabaragam & Madhupalli for a length of 500m each including survey, investigation, Planning, design and estimate of all components as per Technical Specification, relevant IS codes, IRC codes, MoRTH specification, CWC manuals & CBIP manuals etc. complete in all respect.
Operation & maintenance of all components of the work for 5(five) years or five flood seasons whichever is more, after commissioning as per relevant clauses of the agreement, Technical Specification, relevant IS codes, IRC codes, MoRTH specification, CWC & CBIP manuals etc. complete in all respect.
Gurumaharaj Engicon Private Limited
UNICORN INDIA PRIVATE LIMITED
M/S Radheshyam Agrawal
SHIVAJYOTI CONPRO PVT. LTD.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid