Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.2 LAccepted-Finance M 46 HOUSING BOARD UNIT MATHAYANKUTTAI METTUR DAM 636 452 | METTUR DAM | SALEM | TAMIL NADU | 636452 | 1 | Accepted-Finance satisfied | |
| 2 | 2₹5.3 L+₹1.0 L (24.6%)Accepted-Finance 150 1ST STREET THOTTILPATHY SALEM CAMP PO METTUR DAM 636 456 | METTUR DAM | SALEM | TAMIL NADU | 636456 | 2 | Accepted-Finance satisfied |
Tender Value
Refer Docs
EMD Value
₹5,200
Closing Date
9 Jun 2021, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I Mill Plant Unit II Overhauling of classifier assemblies replacement repairing of eroded inner cones inner cone drum section venturi vanes etc
2021_EB_201983_1
SE / M-I / MTPS-I / MP / OT. 73 / 2021-22
Open Tender
Power/Energy Projects/Products
Works
20 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specification
4 documents required · 4 mandatory
₹0
₹5,200
Yes
14 Jun 2021
3 Jun 2021
10 Jun 2021
3 Jun 2021
9 Jun 2021
3 Jun 2021
Amount
Dismantling of worn out classifier assembly, inspection of deflector blade, cleaning, replacing of worn out deflector blade components renewal and assembling of new classifier assembly with its links. The overhauled classifier assembly was checked from 0 to 10 positions and ensured that the deflector blades, links move correspondingly to its position without any malfunction.
Dismantling the mill top, cutting the centre feed pipe to the required length so as to lift eroded inner cone and brought it to 4.5 Mtr. level and assembling the same as per the direction of Engineer in charge.
Charges for dismantling the inner cone from mill top and assembling the new/ reconditioned inner cone.(Mills 2A to 2C)
Charges for dismantling venturi outlet assembly from mill top with the removal of venturi outlet, venturi vanes ,venturi outlet conical collar assembly, coal feed pipe and devolution of scrap to stores.
Charges for fixing of new venture vane and assembling the venturi outlet assembly, venturi outlet conical collar assembly with coal feed pipe and the mill top.
Cost of M.S. Welding electrodes
Cutting gas
Consumables and T&P’s
SATHISH ENGINEERING
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .