| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 CrAccepted-AOC 65 MODEL TOWN 136026 | KAITHAL | HARYANA | 136026 | ₹4.3 Cr | L1 | Accepted-AOC Work Allotted to Agency |
| 2 | L2₹4.3 Cr+₹1.6 L (0.37%)Rejected-Finance | ₹4.3 Cr+₹1.6 L (0.37%) | L2 | Rejected-Finance L2 |
| 3 | L3₹4.3 Cr+₹7.4 L (1.73%)Rejected-Finance 1006 SECTOR 5 THANESAR 1006 SECTOR 5 THANESAR 136118 | KURUKSHETRA | HARYANA | 136118 | ₹4.3 Cr+₹7.4 L (1.73%) | L3 | Rejected-Finance L3 |
| 4 | L4₹5.0 Cr+₹69.2 L (16.2%)Rejected-Finance | ₹5.0 Cr+₹69.2 L (16.2%) | L4 | Rejected-Finance L4 |
| 5 | Not Admitted-PreQual/Technical | - | - | Not Admitted-PreQual/Technical Not Complied with technical specification |
Tender Value
Refer Docs
EMD Value
₹8.5 L
Closing Date
28 Dec 2020, 5:00 pmClosed
Executice EngineerProvincial Division No 1 Karnal
Executice Engineer Provincial Division No 1 Karnal
DNIT for Periodical Renewal by way 30mm thick Bituminous Concrete and 5 years paid maintenance cost under PMGSY II
2020_HRY_152560_1
DNIT for Periodical Renewal by way 30mm thick Bitu
Open Tender
Civil Works
Works
180 days
DNIT for Periodical Renewal by way 30mm thick Bitu
Please refer Tender documents.
3 documents required · 3 mandatory
₹15,000
Yes
₹8.5 L
Yes
25 Mar 2021
7 Dec 2020
29 Dec 2020
7 Dec 2020
28 Dec 2020
7 Dec 2020
Amount
Providing and laying tack coat with bitumen VG-10 grade pressure distributor at the rate of 0.30 kg. per sqm. On the prepared bituminous surface cleaned with mechanical broom including cost of bitumen as per clause No.503 as per MoRT&H specification (5th edition) 2013. Instrution issued from time to time by MORT&H regarding bitumen VG-10 will be followed strictly. Package - I
Package - II
Package - III
Providing & Laying 30 mm thick compacted Bituminous Concrete (BC) in one layer with 100-120 TPH batch type hot mix plant and with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with appropriate vibratory rollers to achieve the desired compaction as per clause No. 507 of MoRT&H specification (5th Revision) 2013 for road and bridge works (5th Revision)2013 using minimum 5.4% bitumen grade VG-30 and processed waste plastic @ 7% of bitumen content as per IRC SP -98 -2013 as binder content by weight of total mix, complete in all respects including cost of bitumen instruction issued from time to time by MoRT&H regarding machinery & bitumen will be followed strictly. The use of self propelled mechanical paver fitted with electronic sensor device conforming to MoRT&H specification in mandatory. If bitumen required more than 5.4% as per job mix formula no extra payment will be made, extra bitumen required will be considered as incidental to work. Note :-1. Before carrying out bituminous work, coating & Stripping of bitumen aggregate mix is to be performed in accordance with IS-6241. If coating and stripping of bitumen aggregate mix is less than 95%, anti-stripping agent will be used by contractor. The anti-stripping agent should conform to the requirement as stipulated in IS 14982:2017. The cost so incurred will be considered as incidental to work and noting extra shall be payable. The type and brand of anti-stripping agent along with procedure shall be approved by SE-in-Charge in writing before start of work. A proper record of results be maintained and same shall be submitted along with bills by the contractor. Instruction issued from time to time regarding bitumen from MORD will be followed strictly. Note:- Where there is only BC on existing black top, cracks shall be sealed as MoRT&H specification 5th revision clause No. 3004.3, which may consists of (i) Fog seal /or (ii) crack filling and or (iii) patch woek repair as required at site in accordance with clause No.3004.3.3 and 3004.2 of MoRT&H specification . Proper measurement and consumption shall be entered in MB for cracks sealed but no payment on this account shall be made as crack filling is incidental to work. and nothing extra shall be payable. Package - I
Package - II
Package - III
Providing & Marking center line / side line 2.5mm thick (minimum) with hot applied thermo-plastic road marking paint 10 cms wide/ 15cm wide complete in all respect such as furnishing all labour, materials, tolls equipments including all incidental costs necessary for carrying out in work at site confirming to the technical specification as clause No. 803 of MORT&H specification for road and bridge works (5th revision) of 2013/ Latest edition. Each container of the thermoplastic material shall have the name trademark or other means of identification of manufacturer, batch number, date of manufacture color maximum application temperature and maximum heating temperature. The thermoplastic paint material shall be of Asian Paint-Apcomark/Berger-Sigmarc/Prismo. The glass beads shall be of Potters/Sovitec/Fleolite. The thermoplastic material shall be sampled and tested in accordance with appropriate ASTM/BS method. The contractor shall furnish to the Engineer-in-Charge a copy of certified test reports from the manufacturer of the thermoplastic material meet all requirement of the specifications. The reflector zing glass beads shall meet the requirement of clause 803.4.2 and test methods mentioned in clause 803.4.2.4 shall be meticulously followed. The minimum thickness specified is exclusive of surface of glass beads the method of thickness measurement shall be in accordance with appendix B and C of BS:3262 (part-3). Note: - Before start of work the contractor shall give brand, batch number, manufacturing date of the material to be used along with a photocopy of bill duly signed by the contractor and get approved the same from Engineer-In-Charge before use. Package - I
Package - II
Package - III
Preparation and formation of berms and slopes as per X-sections including filling of Earth work, excavation and cutting of earth in all kind of soils including dressing the bank, side slope to given levels and templates after breaking of clouds, including the cost of rolling and watering all allowances for labour hardness wetness irrespective of all lead and lift, but including Compensation for earth taken from private land, fields etc. and compacted to meet requirement of table 300-2 of MoRT&H specification clause No. 305and to the entire satisfaction of the Engineer of the work conforming to PWD specification No. 6.2 and 6.3 and 3.2 and the other specification 1990 Ist edition. As per X-section attached at DNIT at Section -9. This item also includes E/W if required in sub grade for Widening and Shoulder. Earth used for sub grade, shoulder and berms should have minimum CBR of 8%. Note:-No earth work will be allowed to be taken from PWD B&R/ ROW except for surplus earth after approval from Engineer. Package - I
Package - II
Package - III
Pavement Marker (Cat Eyes) Moulded shank raised pavement markers made of polycarbonate and ABS moulded body and reflective panels with micro prismatic lens capable of providing internal reflection of the light entering the lens face and shall support a load of 16000 KG tested in accordance to ASTM D 4280 Type H and complying to specifications of Category A of MORTH Circular No. W/NH/33023/10-97-DO III dt. 11.06.1997. The height width and length shall not be exceed 50mm, 100mm and 100 mm and with minimum reflective area of 13 Sqcm. On each side and the slope to the base shall be 35+/- degree. The strength of detachment of the integrated cylindrical shanks, (of diameter not less than 19+/-2 mm and height not less than 30+/- mm) from the body is to be a minimum value of 500 Kg. Fixing will be by drilling holes on the road for the shanks to go inside, without nails and using epoxy resin based adhesive as per manufacturer’s recommendation and complete as directed by the engineer (of reputed make such as Avery Dennison/3M) Package - I
Package - II
Package - III
Providing & fixing public information board consisting of 75 mm GI Pipe of size 2.45 m x 1.15 m with 900 mm x 900 mm GI sheet 16 gauge connected/ welded with 5 mm thick steel plate of 50 mm duly painted as per column mentioned in the Drawing and fixing at site in 60 x 60 x 75 cm cement concrete 1:2:4 block complete in all respect. Package - I
Package - II
Package - III
Providing & fixing retro reflective hazard marker confirming to IRC79: 1981 of size 900 x 300 mm with back support of M. S. angle 25 x 25 x 3 mm and post of 50 x 50 x 5 mm, 1500 mm high embedded into 0.3 x 0.3 x 0.3 m M20 grade concrete as per site requirements, using non-metallic micro-prismatic retro reflective sheet confirming to IRC: 67-2012 type IV specification fixed on 3 mm thick aluminium composite. Material sheet as base board with pressure sensitive adhesive having 0.5 mm thick Aluminium on both sides. (of reputed make such as Array Dennison/3M) Package - III
Routine Maintenance Routine Maintenance Cost after completion of Construction for Ist Year. Package - I
Package - II
Package - III
Routine Maintenance Cost after completion of Construction for IInd Year. Package - I
Package - II
Package - III
Routine Maintenance Cost after completion of Construction for IIIrd Year. Package - I
Package - II
Package - III
Routine Maintenance Cost after completion of Construction for IVth Year. Package - I
Package - II
Package - III
Routine Maintenance Cost after completion of Construction for Vth Year. Package - I
Package - II
Package - III Item no- 8 to 12 Note- The bidder is required to quote his rate for routine maintenance as defined in DNIT. The rates of routine maintenance as indicated in DNIT will be considered for financial evaluation and determining L-1 contractor irrespective of rates quoted by the contractor. If the rates quoted by contractor differ from fixed rates, then it will not be considered and base rates as fixed in the DNITwill be considered. However, the total amount of L-1 will not be increased from the total amount quoted by the contractor and rebate to that extent shall have to be given by the contractor. Note:- If any discrepancy found in the unit/ Nomenclature in the items of BOQ. The Nomenculature of HSR/ MoRT&H shall be applicable
Ms Budha Group of Constructions and Properties
krishan lal contractor
rameher contractor
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .