Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹15.2 LAdmitted-Finance | -48.00% | ₹15.2 L | L1 | Admitted-Finance |
| 2 | L2₹15.3 LAdmitted-Finance | -47.83% | ₹15.3 L | L2 | Admitted-Finance |
| 3 | L3₹16.8 LAdmitted-Finance | -42.45% | ₹16.8 L | L3 | Admitted-Finance |
| 4 | L4₹16.9 LAdmitted-Finance | -42.07% | ₹16.9 L | L4 | Admitted-Finance |
| 5 | L5₹17.2 LAdmitted-Finance | -41.22% | ₹17.2 L | L5 | Admitted-Finance |
Tender Value
₹29.2 L
EMD Value
₹58,460
Closing Date
25 May 2026, 4:00 pmClosed
Er ranjit singh
OFFICE OF THE XEN PWD RNB DIVISION RAMBAN
refer to BOQ
2026_PWDJK_309553_1
E-NIT No. 16 of 2026-27 Dated. 08-05-2026
Open Tender
Civil Works
60 days
Dalwas
refer to NIT
2 documents required · 2 mandatory
₹600
Yes
XEN PWD RNB DIVISION RAMBAN
₹58,460
Yes
10 Jun 2026
8 May 2026
26 May 2026
9 May 2026
25 May 2026
9 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil | 239.5 | Cum | 256.85 | ₹61,515.58 |
| 0.0 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil | 257 | Cum | 187.3 | ₹48,136.1 |
| 0.0 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: | - | - | - | - |
| 0.0 | 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size | 15.9 | Cum | 4,826.5 | ₹76,741.35 |
| 0.0 | (ii) 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 158.83 | Cum | 5,733.6 | ₹9,10,667.69 |
| 0.0 | Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand) (Nallah) | 80.25 | Cum | 5,402.9 | ₹4,33,582.73 |
| 0.0 | Hand-packing stones in wire-crates; including cost of stones & crates
( Note:- Wire crates should be used of 4mm dia G.I.Wire of 100mmx100mm mesh mechanically woven diagonally) | 336.96 | Cum | 1,823.46 | ₹6,14,433.08 |
| 0.0 | Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete. Non-pressure NP-4 class (Heavy duty) R.C.C. pipes. 1000 mm dia. R.C.C. pipe (laying by manual/mechanical means) | 15 | Mtr | 7,556.6 | ₹1,13,349 |
| 0.0 | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 285 | Sqm | 286.35 | ₹81,609.75 |
| 0.0 | Providing and laying damp-proof Course 50 mm thick with cement concrete 1:2:4 (1 cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete | 26 | Sqm | 416.5 | ₹10,829 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
BOQ_1002033.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid