SE/MEDC/TANGEDO/MADURAI
SE/MEDC/TANGEDO/K.PUDHUR,MADURAI
E-tender for Erection of new HT Lines and DP Structure in Vadipatti Panchayat in Vadipatti section in Samayanallur Division of Madurai Electricity Distribution Circle, Madurai under IPDS Scheme.
2018_EB_90068_1
SE/MEDC/ET/ WC (IPDS)/ 117 /17-18 Dt 20.03.2018
Open Tender
Electrical Works
Works
90 days
Vadipatti
As per BQR Condition in the tender document
2 documents required · 2 mandatory
₹0
₹5,520
Yes
18 Mar 2021
20 Mar 2018
28 Mar 2018
20 Mar 2018
28 Mar 2018
20 Mar 2018
Amount
Labour charge for transporting of 9 M PSC (400 KG-Wind pressure) Pole from road side to work spot, including loading and unloading ,T&P ,Machineries , Complete etc., upto 500 M (PART A)
Labour charge for Earth work excavation to 9 M PSC (400 KG-Wind pressure) in all kinds of soil to depth of 1/5th of Pole height, including labour charges, lead and lift complete etc. Pit Size 1.32 M3(PART A)
Labour charge for Erection of 9 M PSC (400 KG-Wind pressure) Pole with base plate in the excavated bit, labour charges, tools and plants etc, complete. (PART A)
Labour charge for earthing of 9 M PSC (400 KG-Wind pressure) Pole with GI wire including Cutting, hooking , binding etc in complete (PART A)
Labour charge for transporting of 8 M PSC (200 KG-Wind pressure) Pole from road side to work spot, including labour charges, T&P etc, Complete upto 500 M (PART A)
Labour charge for Earth work excavation to 8 M PSC (200 KG-Wind pressure) in all kinds of soil to depth of 1/5th of Pole height, including Tools and plant, lead and lift complete etc. Pit Size 1.13 M3 (PART A)
Labour charge for Erection of 8 M PSC (200 KG-Wind pressure) Pole with base plate in the excavated bit, labour charges, tools and plants etc, complete. (PART A)
Labour charge for earthing of 8 M PSC (200 KG-Wind pressure) Pole with GI wire including Cutting, hooking , binding etc in complete (PART A)
Providing PCC sleeve concrete and plastering of concrete for 42' RSJ / 36' RSJ /9M PSC pole (400 KG-Wind pressure) / 8 M PSC (200 KG-Wind pressure) Pole for the size of - 0.12 M3 (0.6 X 0.45 X 1.2) Concrete mix Ratio :- 1:2:4 , including sand, jully, cement , Tools and Plants, Curing complete etc.(PART A)
Labour charge for Earth work stay pit excavation for a Pit Size 0.86 M3 , including Tools and plant, lead and lift complete etc(PART A)
Labour charge for Erection of stay set complete with stay plate incuding of refilling of excavated earth, Fixing of clamp, providng of stay rod, , Guy set, binding of etc, including tools and plants etc, complete.(PART A)
Labour charge for providing of sleeve concrete and plastering of concrete for stay with the size of - 0.53 M3 (0.35 M dia, ), Concrete mix Ratio :- 1:2:4 , including sand, jully, cement , Tools and Plants, Curing complete etc.(PART A)
Labour charge for paving , stringing, binding, and jumpering of ACSR 7/4.09mm conductor complete, etc.,(PART A)
Labour charge for paving , stringing, binding, and jumpering of ACSR 7/3.35 mm conductor complete, etc., (PART A)
Labour charges for erection of Single phase cross arm with pin insulators / LT shackles etc., including tools and plant complete etc. depend upon location (PART A)
Labour charges for erection of Three Phase cross arm with pin insulators / LT shackles etc including tools and plant complete etc. depend upon location (PART A)
Labour charge for Erection HT 4'-6" ' V cross arm , Top insulator Fitting with pin insulator complete etc in Pin point location. (PART A)
Labour charge for Erection HT 3'- 6" V cross arm , Top insulator Fitting with pin insulator complete etc in Pin point location. (PART A)
Labour charge for Erection HT 3'- 6" V cross arm , Top insulator Fitting with pin insulator and Disc complete etc in Cut Point location (PART A)
Labour charge for Erection HT Tapping channel Cross arm ,Guarding cross arm , Top insulator Fitting with pin insulator and Disc complete etc (PART A)
Labour charge for erection of guarding arrangment (Cradle guarding), Including fixing of Guarding cross arm, lacing Complete etc., as per the norms of TANGEDCO standards as mentioned by the field engineer.(PART A)
Transporting charge for Conductor/ Line Materials from sub-store to work spot including loading, unloading with vehicle, Tools and plant , Machinery, complete etc.(PART A)
Labour charge for breaking the concreting of damaged PSC/ RCC pole and transporting the grill to the road side and hand over to section officer for all Size of poles including loading and unloading including hire vehicle and tools charges complete etc. (PART A)
Labour charge for releasing of ACSR 7/2.59 mm conductor and hand over to the section officer including tools and plant machinery complete etc. (PART A)
Labour charge for transporting of 9 M PSC (400 KG-WP) Pole for erection of Transformer structure as per the TANGEDCO standard from road side to work spot, including labour charges, T&P etc, Complete upto 500 M (PART B)
Labour charge for Earth work excavation of 9 M PSC (400 KG-WP) for erection of Transformer structure as per the TANGEDCO standard in all kinds of soil to depth of 1/5th of Pole height, including labour charges, lead and lift complete etc. Pit Size 1.32 M3 (PART B)
Labour charge for Erection of 9 M PSC (400 KG-WP) Pole with base plate in the excavated bit for erection of 11 KV Double pole structure as per the TANGEDCO standard,including tools and plants, Machineries complete etc., (PART B)
Labour charge for earth work excavation for 3 Nos of Earth pit and erection of Earth pipe with salt,coal and earth refilling complete etc (including cost of coal and salt) (PART B)
Labour charge for Transformer structure grounding and earthing of complete structure ( 3 pit ) with GI wire including Cutting, hooking , binding etc in complete (PART B)
Provision of Mass concrete and plastering for Transformer structure concrete for 9 M PSC (400 KG-WP) -(2 Poles) for the size of - 0.72 M3 ; Base -(0.6 X 0.6 X 1.65)M ; On the earth (0.6x0.6x.35 Cu)M; Concrete mix Ratio :- 1:2:4 , including sand, jully, cement , Tools and Plants, Curing complete etc. (PART B)
Labour charge for Earth work stay pit excavation for a Pit Size 0.86 M3 , including Tools and plant, lead and lift complete etc (PART B)
Labour charge for Erection of stay set complete incuding of refilling of excavated earth, Fixing of clamp, providng of stay rod, , Guy set, binding of etc, including tools and plants etc, complete. (PART B)
Labour charge for providing of sleeve concrete and plastering of concrete for stay with the size of - 0.53 M3 (0.35 M dia, ), Concrete mix Ratio :- 1:2:4 , including sand, jully, cement , Tools and Plants, Curing complete etc. (PART B)
Labour charge for erection of structure materials complete, including tools and plant, machinery complete etc (PART B)
Labour charges for erection of 11 KV AB switch in Transformer structure per location including Tools and plant, Machinery complete etc., (PART B)
Labour charges for erection of HT jumpering for Transformer structure per location including Tools and plant, Machinery complete etc., (PART B)
Labour charges for erection of Distribution type HT LAS (1 set) on Transformer structure including Tools and plant, Machinery complete etc., (PART B)
Labour charge for Masonary work/ earth tub for earth pit for 3 Nos Earth tub set including tools and plants , Machinery, complete, etc., (PART B)
Transporting charges for Double pole structure materials, including AB switch,HG Fuse set, Cables,complete etc., (except Pole) (PART B)
Labour charges for painting by one coat with red oxide paint in DT structure complete including Tools, plant and machinery complete etc., (Except cost of paint) (PART B)
Labour charges for painting two coats with approved quality of aluminium paint for transformer structure and iron materials complete including Tools, plant and machinery complete etc., (Except cost of paint) (PART B)
Labour charge for levelling the DP structure yard and providing cut stone or brick on edge spreading 1 layer of 40mm blue metal,complete etc ( PART B)
Labour charge for erection of D.P. structure, such as AB Switch, top channel bracing and earthing complete etc., (PART B)
Labour charges for Loading and Unloading of DP structure Materials including, T&P, Machineries, Complete, Etc., (PART B)
Applicable SGST has to be quoted as numbers
Applicable CGST has to be quoted as numbers
Inter-state GST is applicable only for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .