Loading…
Loading…
Tender Value
₹2.9 L
EMD Value
₹5,840
Closing Date
29 Sept 2026, 6:00 pm2d left
XEN OFFICE REW JAMMU
XEN OFFICE REW JAMMU
Construction of Bathing Ghat near talab , Upper Kore Jagir , Panchayat Nadore under scheme Community Development Jammu (UT Capex) for the Year 2026-27
2026_RDPR_324835_3
e-NIT No. 580 REWJ of 2026-27 dated 16-09-2026
Open Tender
Civil Works
Percentage
XEN OFFICE REW JAMMU
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
MH0515
₹5,840
16 Sept 2026
16 Sept 2026
30 Sept 2026
16 Sept 2026
29 Sept 2026
16 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in
trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5
m in width) and for shafts, wells, cesspits and the like not exceeding 10
sqm on plan, including dressing of sides and ramming of bottoms lift
upto 1.5 m, including getting out excavated earth and disposal of
surplus excavated earth as directed, within a lead of 50 metres: All
kinds of soil : | 8.95 | cum | 256.85 | ₹2,298.81 |
| 2 | P/Laying of cement conct.1:5:10 Of specified grade excluding the cost
of form work, cement using 40mm N/ size of agg. | 1.5 | cum | 4,826.5 | ₹7,239.75 |
| 3 | P/Laying of cement conc. 1:3:6 Of specified grade with 30% bolder
excluding the cost of form work, cement using 20mm N/ size of agg | 7.69 | cum | 5,733.6 | ₹44,091.38 |
| 4 | Boulder @ 30% | 3.3 | cum | 937 | ₹3,092.1 |
| 5 | Brick work with brick of class designation 75 above plinth level upto
floor V level in cement mortar 1:6 incling super structure | 7.89 | cum | 7,571.55 | ₹59,739.53 |
| 6 | Extra for brickwork | 7.89 | cum | 1,455.65 | ₹11,485.08 |
| 7 | P/Laying reinforced cement conc. 1:1.5:3 Of specified grade in RCC
work excluding the cost of form work, cement using 20mm N/ size of
agg. | 1.65 | cum | 9,821.85 | ₹16,206.05 |
| 8 | Reinforcement for RCC work including straightening , cutting, bending,
placing in position and binding all complete | 132.19 | kgs | 123.2 | ₹16,285.81 |
| 9 | Centering and shuttering including strutting propping etc and removal of form
for foundation footings, bases of columns etc for mass concret. | 36.85 | sqm | 286.35 | ₹10,552 |
| 10 | Sofit | 9.85 | sqm | 718.2 | ₹7,074.27 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.44 MB
BOQ_1096140.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .