Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 CrAdmitted-Finance | ₹3.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹4.0 Cr+₹8.5 L (2.18%)Admitted-Finance | ₹4.0 Cr+₹8.5 L (2.18%) | L2 | Admitted-Finance |
| 3 | L3₹4.5 Cr+₹58.0 L (14.9%)Admitted-Finance BUILDING NO 20 A N A THOOMKUZHIYIL HOUSE WARD 5 VILLAGE TOWN P O VAZHOOR EAST CITY N A KOTTAYAM KERALA 686504 INDIA | KOTTAYAM | KERALA | 686504 | ₹4.5 Cr+₹58.0 L (14.9%) | L3 | Admitted-Finance |
| 4 | L3₹4.5 Cr+₹58.0 L (14.9%)Admitted-Finance | ₹4.5 Cr+₹58.0 L (14.9%) | L3 | Admitted-Finance |
| 5 | L4₹5.2 Cr+₹1.3 Cr (32.9%)Admitted-Finance SRIKONA POTAPOLA CHHAKA CHANDIPUR ROAD BALASORE ODISHA 756025 | BALASORE | BALESHWAR | ODISHA | 756025 | ₹5.2 Cr+₹1.3 Cr (32.9%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | pavan putra enterprises L3 | M/S EAST COAST ENTERPRISES L3 | bholanath bera L4 | M/S DEBAJIT BORTHAKUR L2 | M/s Y S O ENTERPRISES L1 |
|---|---|---|---|---|---|---|---|---|
| 0.00NOTE:- (Applicable for all parts/items/):- The bidders/contractors are advised to read tender document, all drawings & all corrigendum/ amendments and General conditions of contracts before entry/quoting the rates. | ||||||||
| 1.00SCHEDULE A PART (IA) LUMPSUM PRICE TO BE QUOTED BY CONTRACTOR | ||||||||
| 1.10 | Construction of "PLANT ROOM", single storey, in RCC framed structure, water proofing treatment to roof, seismic consideration of Zone "V", with all fittings and fixtures, including ramps, steps, platform, plinth protection, verandah, rolling shutters, complete all as specified and as shown on drawings. | 1 | Lump-sum | 55,00,000 ₹55,00,000 | 55,00,000 ₹55,00,000 | 66,00,000 ₹66,00,000 | 40,00,000 ₹40,00,000 | 34,65,666 ₹34,65,666 Lowest |
| 1.20 | Construction of "BALANCING TANK" for swimming pool (capcity 42,000 Ltrs), RCC framed structured, seismic consideration of Zone 'V', with all fitttings and fixtures, complete all as specified and as shown on drawings. | 1 | Lump-sum | 29,50,000 ₹29,50,000 Lowest | 29,50,000 ₹29,50,000 Lowest | 32,00,000 ₹32,00,000 | 30,00,000 ₹30,00,000 | 32,56,789 ₹32,56,789 |
| 2.00SCHEDULE A PART (I) PREPRICED BUILDING SSR | ||||||||
| 3.00 | Lumpsum price worked out by the tenderer for REPAIR TO SWIMMING POOL as listed in Schedule ‘A’ Part-I(B) | 1 | Lump-sum | 5,71,251.22 ₹5,71,251.22 | 5,71,251.22 ₹5,71,251.22 | 6,40,000 ₹6,40,000 | 3,00,000 ₹3,00,000 | 2,90,000 ₹2,90,000 Lowest |
| 4.00 | Lumpsum price worked out by the tenderer for AREA DRAINAGE as listed in Schedule ‘A’ Part-I(C) | 1 | Lump-sum | 2,91,186 ₹2,91,186 | 2,91,186 ₹2,91,186 | 3,10,000 ₹3,10,000 | 2,00,000 ₹2,00,000 | 1,90,000 ₹1,90,000 Lowest |
| 5.00 | Lumpsum price worked out by the tenderer for SITE CLEARANCE, SITE DEVELOPMENT & EARTHWORK as listed in Schedule ‘A’ Part-II | 1 | Lump-sum | 3,39,320.2 ₹3,39,320.2 | 3,39,320.2 ₹3,39,320.2 | 3,70,000 ₹3,70,000 | 2,00,000 ₹2,00,000 | 1,88,511.22 ₹1,88,511.22 Lowest |
| 6.00 | Lumpsum price worked out by the tenderer for INTERNAL ELECTRIFICATION as listed in Schedule ‘A’ Part-III | 1 | Lump-sum | 7,66,438.38 ₹7,66,438.38 | 7,66,438.38 ₹7,66,438.38 | 7,90,000 ₹7,90,000 | 7,00,000 ₹7,00,000 | 6,80,000 ₹6,80,000 Lowest |
| 7.00 | Lumpsum price worked out by the tenderer for EXTERNAL WATER SUPPLY as listed in Schedule ‘A’ Part-IV | 1 | Lump-sum | 5,36,273.76 ₹5,36,273.76 | 5,36,273.76 ₹5,36,273.76 | 5,90,000 ₹5,90,000 | 4,00,000 ₹4,00,000 Lowest | 4,10,000 ₹4,10,000 |
Tender Value
₹2.5 Cr
EMD Value
₹3.2 L
Closing Date
16 Jul 2026, 6:00 pmClosed
CE SHILLONG ZONE
HQ CE SHILLONG ZONE, SE FALLS SHILLONG MEGHALAYA
ADDITION/ALTERATION AND SPECIAL REPAIRS TO EXISTING SWIMMING POOL AT ARC UNDER GE SHILLONG
2025_MES_724555_4
89820/SHL/E8
Open Tender
Civil Works
Lump-sum
450 days
GE Shillong
As per tender documents and NIT
2 documents required · 2 mandatory
₹2,000
Yes
GE SHILLONG
₹3.2 L
Yes
8 Aug 2026
12 Jun 2026
18 Jul 2026
12 Jun 2026
16 Jul 2026
26 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SCHEDULE A PART (IA) LUMPSUM PRICE TO BE QUOTED BY CONTRACTOR | |||||
| 1.1 | Construction of "PLANT ROOM", single storey, in RCC framed structure, water proofing treatment to roof, seismic consideration of Zone "V", with all fittings and fixtures, including ramps, steps, platform, plinth protection, verandah, rolling shutters, complete all as specified and as shown on drawings. | 1 | Lump-sum | - | - |
| 1.2 | Construction of "BALANCING TANK" for swimming pool (capcity 42,000 Ltrs), RCC framed structured, seismic consideration of Zone 'V', with all fitttings and fixtures, complete all as specified and as shown on drawings. | 1 | Lump-sum | - | - |
| 2SCHEDULE A PART (I) PREPRICED BUILDING SSR | |||||
| 3 | Lumpsum price worked out by the tenderer for REPAIR TO SWIMMING POOL as listed in Schedule ‘A’ Part-I(B) | 1 | Lump-sum | 2,28,500.49 | ₹2,28,500.49 |
| 4 | Lumpsum price worked out by the tenderer for AREA DRAINAGE as listed in Schedule ‘A’ Part-I(C) | 1 | Lump-sum | 1,26,602.61 | ₹1,26,602.61 |
| 5 | Lumpsum price worked out by the tenderer for SITE CLEARANCE, SITE DEVELOPMENT & EARTHWORK as listed in Schedule ‘A’ Part-II | 1 | Lump-sum | 1,88,511.22 | ₹1,88,511.22 |
| 6 | Lumpsum price worked out by the tenderer for INTERNAL ELECTRIFICATION as listed in Schedule ‘A’ Part-III | 1 | Lump-sum | 6,13,150.7 | ₹6,13,150.7 |
| 7 | Lumpsum price worked out by the tenderer for EXTERNAL WATER SUPPLY as listed in Schedule ‘A’ Part-IV | 1 | Lump-sum | 3,25,014.4 | ₹3,25,014.4 |
| 8 | Lumpsum price worked out by the tenderer for EXTERNAL ELECTRIFICATION as listed in Schedule ‘A’ Part-V | 1 | Lump-sum | 15,42,124.38 | ₹15,42,124.38 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.50 MB
TenderMerge89820.pdf
Tender Documents • 23.01 MB
CESZ-STD-6-1-2lintelchajja.pdf
Additional Documents • 0.42 MB
CESZ-STD-6-2-2.pdf
Additional Documents • 0.45 MB
MainDrgVol1.pdf
Additional Documents • 1.44 MB
revDrawingsMergeTDdrawings.pdf
Additional Documents • 32.46 MB
BOQ_864070.xls
BOQ • 0.57 MB
CorrigendumNo189820.pdf
PDF • 0.14 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .