| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Satisfied |
| 2 | Accepted-Technical 4 132 M OLAIPATTY MANATHAL PO SALEM TAMIL NADU 636503 | SALEM | SALEM | TAMIL NADU | 636503 | Accepted-Technical Satisfied |
| 3 | Accepted-Technical 6 31 B THOOKANAMPATTY METTUR DAM 636401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | Accepted-Technical Satisfied |
Tender Value
Refer Docs
EMD Value
₹9,200
Closing Date
5 Aug 2026, 2:00 pmClosed
SE/EGC
SUPERINTENDING ENGINEER ERODE GENERATION CIRCLE URATCHIKOTTAI K.N.PALAYAM (PO) BHAVANI- 638302
Provision of protective coating works to the Parapet wall over the bridge, Providing weld mesh arrangement for windows and replacement of broken window glasses to the Power House building and Precast slab for cable duct at 110KV yard at Bhavani Katta
2026_EB_687203_1
SE/EGC/C/ 9/26-27/dt.8.7.26.
Open Tender
Civil Works
Works
90 days
Solasiramani
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹9,200
Yes
24 Aug 2026
20 Jul 2026
6 Aug 2026
20 Jul 2026
5 Aug 2026
20 Jul 2026
20 Jul 2026 - 5 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Painting two coats with approved weather proof Exterior Emulsion paint over one primer coat on cement plastered wall surface including thorugh scrapping of old plastered surface etc., complete and as directed by the Departmental officers. | 1,300 | Sqm | - | - |
| 2 | Supplying and fixing of 6mm thick wire glass of required size for windows including cost of all materials, putty for fixing labour, lead, lift, transporting including cutting charges and fixing at the required height and as instructed by the department engineer at site etc., complete. | 27 | Sqm | - | - |
| 3 | Supplying & fixing of weld mesh of 2.50cm x 7.50cm of 3.15mm wire 10 gauge grill by welding including cost of materials, labours, fabrication, fixing charges, welding charges, etc., complete as per standard specification. | 270 | Sqm | - | - |
| 4 | Painting the steel work with two coats of approved quality & colour enamel paint over a coat of primer of red oxide as directed be the engineer in charge including cost of all materials, brushes, lead, etc., complete. | 270 | Sqm | - | - |
| 5 | Supplying and erecting Safety arrangement using Cup-lock system, having a standard width of 1.20m, provided for working platform in the peripheral area of the high rise building. The Safety Scaffolding arrangement shall be formed by using vertical hot rolled steel pipe of 40mm diameter with a thickness of 2.90mm. The vertical pipe shall have a steel cup arrangement of 80mm diameter to hold the horizontal ledger pipe with top movable lock arrangement made up of Cast Iron. The above cup arrangement to hold the ledger pipe shall be welded to the vertical pipe shall be welded to the vertical pipe at a distance of every 0.50m c/c. The horizontal ledger pipe with various lengths ranging from 0.90m to 2.0m may be used with a diameter of 40mm and with a thickness of 2.90mm made up of Hot rolled steel. The horizontal ledger pipe shall be provided at a vertical height of every 1m. Both the ends of the horizontal ledger pipe shall be welded with a steel plate of 100mm length and a width of 60mm at the center and 35mm at both the edges. The Whole arrangement shall be placed above the bottom base arrangement having fixed/ adjustable mechanism made with a base plate of size150mm x150mm with a suitable thickness as required. The working platform jally of suitable require size shall be fabricated using MS square pipes of size 25mm x 25mm. Necessary Clamps/ Clips with blot and nut arrangement shall be provided to the working platform jally to hold it with the above said scaffolding system. Necessary stay arrangement for the above scaffolding system shall be made at Ground level and at every floor level using Hot rolled steel pipes of diameter 40mm with clamps. The above stay arrangements shall be provided at every 6m in horizontal direction and at every 3.6m/floor level in vertical direction. The cost includes material and fabrication charges of all materials, transportation, labor charges for erection & dismantling of scaffolding, etc as per standard specification and as directed by the departmental officers. | 270 | Sqm | - | - |
| 6 | Supplying and fixing Precast Reinforced Cement Concrete slabs of 75mm thickness in RCC 1:1.5:3 (one cement, one and half sand and three aggregates), using 12mm -20mm HBGS jelly excluding cost of reinforcement steel in position but including cost of moulding charges, casting of slab, finishing, curing and fixing in position in all floors etc., complete complying with standard specification and as engineer incharge. | 5 | Cum | - | - |
| 7 | Providing steel reinforcement MS/RTS rods up to 10 mm dia for reinforced concrete works, including cost of steel MS/RTS rods, binding wire, labour charges for cutting, straightening bending as per type design drawing, placing aligning, and tying properly with all leads and lift as per standard specification, etc., complete. | 760 | Kg | - | - |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.19 MB
BOQ_826011.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .