Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.2 LAdmitted-Finance | -6.20% | ₹3.2 L | L1 | Admitted-Finance |
| 2 | L2₹3.2 L+₹683.42 (0.21%)Admitted-Finance 222 HSIDC BARWALA PANCHKULA | -6.00% | ₹3.2 L+₹683.42 (0.21%) | L2 | Admitted-Finance |
| 3 | L3₹3.2 L+₹3,895.51 (1.22%)Admitted-Finance | -5.06% | ₹3.2 L+₹3,895.51 (1.22%) | L3 | Admitted-Finance |
| 4 | L4₹3.3 L+₹9,431.23 (2.94%)Admitted-Finance | -3.44% | ₹3.3 L+₹9,431.23 (2.94%) | L4 | Admitted-Finance |
| 5 | L5₹3.3 L+₹10,080.48 (3.14%)Admitted-Finance | -3.25% | ₹3.3 L+₹10,080.48 (3.14%) | L5 | Admitted-Finance |
Tender Value
₹3.4 L
EMD Value
₹7,000
Closing Date
26 May 2026, 4:00 pmClosed
Executive Eng. II
Construction office,P.U. Campus
Shifting of Sewer line Near Chemistry Department at P.U. campus Sec-14 Chandigarh.
2026_PU_92246_1
6844/EE/Mtc.
Open Tender
Civil Works
Percentage
120 days
P.U. campus Sec-14 Chandigarh.
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹7,000
29 May 2026
8 May 2026
28 May 2026
8 May 2026
26 May 2026
8 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed. | |||||
| 1.01 | All kinds of soil (Ref:- 2.6.1) | 9.06 | cum | 182 | ₹1,648.92 |
| 2Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth upto 1.5 m including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as directed, within a lead of 50 m | |||||
| 2.01 | All kinds of soil | - | - | - | - |
| 2.02 | Pipes, cables etc. exceeding 300 mm dia but not exceeding 600 mm. (Ref:- 2.10.1.3) | 25.93 | mts | 301 | ₹7,803.43 |
| 3Providing, Fixing and jointing glazed stoneware pipes grade of ‘A’ with stiff mixture of cement mortar in the proportion of 1:1 including testing of joints etc. complete : | |||||
| 3.01 | 150 mm diameter (Ref:- 19.1.5) | 25.93 | mts | 1,607 | ₹41,661.48 |
| 4Providing and laying cement concrete 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) all-round S.W. pipes including bed concrete as per standard design: | |||||
| 4.01 | 300 mm diameter S.W. pipe (Ref:- 19.3.5) | 25.93 | mts | - | - |
| 5Making connection of drain or sewer line with existing manhole including breaking into and making good the walls, floors with cement concrete 1:2:4 mix (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) cement plastered on both sides with cement mortar 1:3 (1 cement : 3 coarse sand) finished with a floating coat of neat cement and making necessary channels for the drain etc. complete : | |||||
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.62 MB
BOQ_112886.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .