| 1 | L1₹2.2 LAdmitted-Finance | ₹2.2 L | L1 | Admitted-Finance |
| 2 | L2₹3.1 LAdmitted-Finance | ₹3.1 L | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Meena Elect & Engg. Works L1 | Gupta Elect and Engg Works L2 |
|---|---|---|---|---|---|
| 1.00Following works are required to be carried out for internal inspection of 40 MVA Transformer at 220 KV S/S charla under ETD-II Meerut. The Detail of work to be executed is as given below :- | |||||
| 2.00 | Drain out of complete Transformer oil in empty oil tanker for internal inspection of Transformer including transportation of oil tanker from Mawana Sub-station to Charla Sub-station.
(Centrifuging machine with operator shall be provided by the contractor) | 1 | Job | 19,500 ₹19,500 | 24,500 ₹24,500 |
| 3.00 | Opening of inspection plate, Dismantling of HV/LV side bushing and opeing of HV/LV side Jumpers & Other associated works. | 1 | Job | 9,950 ₹9,950 | 15,000 ₹15,000 |
| 4.00 | Internal inspection of 40 MVA Transformer, checking of HV/LV side winding lead of Transformer, LV phase leads, LV Neutral/Star point inspection, LV turret/Bushing base pressboard support insulation (LV end), LV winding end, tightening of joints, Neutral lead/LV lead sleeve insulation connections and all other components inside the main tank of Transformer. Report with close up photographs of damaged area, marked fault location with written inspection observations. | 1 | Job | 69,800 ₹69,800 | 80,000 ₹80,000 |
| 5.00If 40 MVA Transformer found healthy or repair at Sub-station then following work is to be carried out. | |||||
| 6.00 | Cleaning of slugs and flushing of Transformer core winding in main tank with hot Transformer oil through centrifuging machine. | 1 | Job | 7,500 ₹7,500 | 14,800 ₹14,800 |
| 7.00 | Closing of inspection plate, HV LV Bushing and jumpering of HV/LV side jumpers and other associated works. | 1 | Job | 14,500 ₹14,500 | 25,000 ₹25,000 |
| 8.00 | Complete evacuation of 40 MVA Transformer, main tank and filling of Dry Air/Dry Nitrogen of dew point- 50° C or better in vacuum up to pressure of 0.25/Kg.Cm2 and the again evacuating the Transformer tank after required time interval (approx 12/24 Hrs.) using centrifuging machine the work shall be including connecting pipe of machine as required Dew Point values of N2 after every cycle till the required value is achieved. | 1 | Job | 39,500 ₹39,500 | 50,000 ₹50,000 |
| 10.00 | Create the vacuum inside th 40 MVA Transformer, before filling the Transformer oil including vacuum standing test. Note: Vacuum shall be maintaiined for 24 Hrs. minimum at 01 torr. | 1 | Job | 9,990 ₹9,990 | 19,500 ₹19,500 |
| 11.00 | Centrifuging of Transformer oil iin 20 KL oil tanker by ultra heigh Vacuum oil filtration plant after connecting the centrifuging the pipe with oil tanker to filtration plant including taking the BDV value of oil periodically till the required value is achieved. (Centrifuging machine with operator shall be provide by the contractor). | 17.58 | KL | 2,000 ₹35,160 | 3,500 ₹61,530 |
Tender Value
₹2.6 L
EMD Value
₹2,500
Closing Date
6 Mar 2026, 5:00 pmClosed
SE ETC MEERUT
130 D PAARESHAN BHAWAN VICTORIA PARK MEERUT
WORK OF INTERNAL INSPECTION OF 40 MVA TRANSFORMER AT 220 KV CHARLA UNDER ETD-II MEERUT
2026_UPTCL_1120658_1
T-26/25-26/ETC/MT
Open Tender
Electrical Works
30 days
MEERUT
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
SE ETC MEERUT
₹2,500
18 Mar 2026
27 Feb 2026
7 Mar 2026
27 Feb 2026
6 Mar 2026
27 Feb 2026
Following works are required to be carried out for internal inspection of 40 MVA Transformer at 220 KV S/S charla under ETD-II Meerut. The Detail of work to be executed is as given below :-
Drain out of complete Transformer oil in empty oil tanker for internal inspection of Transformer including transportation of oil tanker from Mawana Sub-station to Charla Sub-station. (Centrifuging machine with operator shall be provided by the contractor)
Opening of inspection plate, Dismantling of HV/LV side bushing and opeing of HV/LV side Jumpers & Other associated works.
Internal inspection of 40 MVA Transformer, checking of HV/LV side winding lead of Transformer, LV phase leads, LV Neutral/Star point inspection, LV turret/Bushing base pressboard support insulation (LV end), LV winding end, tightening of joints, Neutral lead/LV lead sleeve insulation connections and all other components inside the main tank of Transformer. Report with close up photographs of damaged area, marked fault location with written inspection observations.
If 40 MVA Transformer found healthy or repair at Sub-station then following work is to be carried out.
Cleaning of slugs and flushing of Transformer core winding in main tank with hot Transformer oil through centrifuging machine.
Closing of inspection plate, HV LV Bushing and jumpering of HV/LV side jumpers and other associated works.
Complete evacuation of 40 MVA Transformer, main tank and filling of Dry Air/Dry Nitrogen of dew point- 50° C or better in vacuum up to pressure of 0.25/Kg.Cm2 and the again evacuating the Transformer tank after required time interval (approx 12/24 Hrs.) using centrifuging machine the work shall be including connecting pipe of machine as required Dew Point values of N2 after every cycle till the required value is achieved.
Create the vacuum inside th 40 MVA Transformer, before filling the Transformer oil including vacuum standing test. Note: Vacuum shall be maintaiined for 24 Hrs. minimum at 01 torr.
Centrifuging of Transformer oil iin 20 KL oil tanker by ultra heigh Vacuum oil filtration plant after connecting the centrifuging the pipe with oil tanker to filtration plant including taking the BDV value of oil periodically till the required value is achieved. (Centrifuging machine with operator shall be provide by the contractor).
Filling of centrifuged Transformer oil from oil tanker to Transformer main tank and top up in conservator tank up to required level.
Testing of Transformer oil of main & OLTC tank oil sample collected in stasndard sample bottles at CPRI/Any Certified testing lab including cost of transportation. (After centrifuging of oil of 40 MVA T/F-I) ABB Make. i. Breakdown Voltage Test ii. Moisture Content Test iii. DGA
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
BOQ_2084697.xls
BOQ • 0.32 MB
Tenderdoc26.pdf
Tender Documents • 0.65 MB
Download all tender documents and submit your bid