| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.1 LAccepted-AOC | ₹25.1 L | L1 | Accepted-AOC Financial bid accepted at the rate |
| 2 | L2₹25.7 LRejected-Finance | ₹25.7 L | L2 | Rejected-Finance reject being higher rate |
| 3 | L3₹26.3 LRejected-Finance | ₹26.3 L | L3 | Rejected-Finance reject being higher rate |
| 4 | L4₹27.7 LRejected-Finance | ₹27.7 L | L4 | Rejected-Finance reject being higher rate |
| Sl No | Description | Qty | Unit | M/s Maa Shitla Construction L1 | SOM SINGH NIRANJAN L4 | Shrishti Construction L3 | M/S AWADH CONSTRUCTION L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation in trenches for foundations and pipes cables etc in ordinary soil (loan clay or sand) including lift upto 1.5 m, lead upto 50 m and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer- in- charge with in a lead of 50m. | 5.62 | Cum | 50 ₹281 | 90 ₹505.80 | 80 ₹449.60 | 85 ₹477.70 |
| 2.00 | Earth work in foundation of walls, piers, abutments etc. with disposal within 30-m lead and 1.5 m. lift-In Mar, Kabar and Rankar soil. | 184.72 | Cum | 100 ₹18,472 | 250 ₹46,180 | 100 ₹18,472 | 229 ₹42,300.88 |
| 3.00 | Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete.(Mild steel and Medium Tensile steel bars) | 9,383.49 | kg | 62 ₹5.8 L | 85 ₹8.0 L | 85 ₹8.0 L | 71 ₹6.7 L |
| 4.00 | Providing and injecting chemical emulsion for pre-constructional antitermite treatment and creating a chemical barrier under and alround the column pits wall trenches basement excavation top surface. | 180.9 | sqm | 100 ₹18,090 | 180 ₹32,562 | 110 ₹19,899 | 161 ₹29,124.90 |
| 5.00 | Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20mm nominal size derived from natural sources). | 28.36 | Cum | 300 ₹8,508 | 430 ₹12,194.80 | 200 ₹5,672 | 357 ₹10,124.52 |
| 6.00 | Centering & shuttering for R.C.C. slabs, lintels & simple beams including all materials & T&P | 50.51 | sqm | 440 ₹22,224.40 | 500 ₹25,255 | 300 ₹15,153 | 452 ₹22,830.52 |
| 7.00 | Centering & shuttering for R.C.C. work including all materials & T&P | 318.7 | sqm | 450 ₹1.4 L | 750 ₹2.4 L | 435 ₹1.4 L | 741 ₹2.4 L |
| 8.00 | R.C.C. work 1:1.5:3 per Cum i/c mixing laying and curing excluding centering,shuttering and reinforcement. and including cost of material, labour , T&P etc. With proper completion of work . | 51.99 | Cum | 6,000 ₹3.1 L | 5,500 ₹2.9 L | 5,800 ₹3.0 L | 5,124 ₹2.7 L |
| 9.00 | First class brick work in cement morter 1:4 (1cement: 4Sand) using 1st class building bricks i/c all cost of material,labour T&P etc.with proper ccompletion of work. | 96.29 | cum | 5,880 ₹5.7 L | 5,500 ₹5.3 L | 5,300 ₹5.1 L | 4,696 ₹4.5 L |
| 10.00 | 12.5 mm Thick cement Plaster in 1:4 cement mortar on brick masonry including cost of all material, labour & T&P required for completion of work. | 1,237.18 | sqm | 90 ₹1.1 L | 120 ₹1.5 L | 100 ₹1.2 L | 124 ₹1.5 L |
Tender Value
₹33.0 L
EMD Value
₹66,000
Closing Date
17 Nov 2025, 12:00 pmClosed
EE Tubewell Division First Orai Jalaun
Office of EE Tubewell Division First Orai Jalaun
CONSTRUCTION OF ASSISTANT ENGINEER RESIDENCE (TYPE IV) OF 2nd SUB DIVISION AT JALAUN CAMPUS
2025_UPIDM_1089609_1
1534/T.W.D.F.O./EE/25-26 date 01-11-2025
Open Tender
Civil Works
120 days
ORAI
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹66,000
18 Dec 2025
11 Nov 2025
17 Nov 2025
11 Nov 2025
17 Nov 2025
11 Nov 2025
Amount
Earth work in excavation in trenches for foundations and pipes cables etc in ordinary soil (loan clay or sand) including lift upto 1.5 m, lead upto 50 m and dressing of sides and ramming of bottom and disposal of surplus excavated earth as directed by the Engineer- in- charge with in a lead of 50m.
Earth work in foundation of walls, piers, abutments etc. with disposal within 30-m lead and 1.5 m. lift-In Mar, Kabar and Rankar soil.
Steel reinforcement for R.C.C. work including straightening, cutting,bending, placing in position and binding all complete.(Mild steel and Medium Tensile steel bars)
Providing and injecting chemical emulsion for pre-constructional antitermite treatment and creating a chemical barrier under and alround the column pits wall trenches basement excavation top surface.
Providing and laying damp-proof course 50mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20mm nominal size derived from natural sources).
Centering & shuttering for R.C.C. slabs, lintels & simple beams including all materials & T&P
Centering & shuttering for R.C.C. work including all materials & T&P
R.C.C. work 1:1.5:3 per Cum i/c mixing laying and curing excluding centering,shuttering and reinforcement. and including cost of material, labour , T&P etc. With proper completion of work .
First class brick work in cement morter 1:4 (1cement: 4Sand) using 1st class building bricks i/c all cost of material,labour T&P etc.with proper ccompletion of work.
12.5 mm Thick cement Plaster in 1:4 cement mortar on brick masonry including cost of all material, labour & T&P required for completion of work.
Black Ganite( Polished) in big slab 20mm thick.
Providing and fixing ISI marked flush door shutters conforming to IS :2202 (Part I) non-decorative type, core of block board construction with frame of 1st class hard wood and well matched teak 3 ply veneering with vertical grains or cross bands and face veneers on both faces of shutters.(35 mm thick including ISI marked Stainless Steel butt hinges with necessary screws)
Supply & fixing fully glazed Aluminium door with frame window and all accessories & fittings/M2.
Supply of M.S. Angle iron door, windows ventilation frame made of approved M.S. angle iron wroght to required form including drilling hole, welding and recetting where necessary and also including supply of all material, such as steel hinges of required size, nut & bolts etc. and also including all taxes, wastage and one coat of red oxide paint complete in all respect as per direction of Engineer-in-charge for proper completion of work at site of work.
Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete.
Wall painting with premium acrylic emulsion paint of interior/exterior grade, having VOC (Volatile Organic Compound ) content less than 50 grams/ litre of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour.with Two Coats.
Electrification Work
Water supply & sanitary installation work
Construction of Stairs
M/S AWADH CONSTRUCTION (BID ID -5682136)
Shrishti Construction (BID ID -5681630)
SOM SINGH NIRANJAN (BID ID -5682405)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 20.39 MB
tendar2.pdf
Tender Documents • 20.37 MB
BOQ_2000528.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid