Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹99.1 LAdmitted-Finance H NO 2128 BH SATOSKAR BUILDING DESSAI NAGAR SANQUELIM BICHOLIM GOA | NORTH GOA | GOA | 403001 | ₹99.1 L | L1 | Admitted-Finance |
| 2 | L2₹1.1 Cr+₹8.8 L (8.90%)Admitted-Finance 20 2434 GFB3A VASANT NAGAR SANKALI GOA | SOUTH GOA | GOA | 403103 | ₹1.1 Cr+₹8.8 L (8.90%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S SAMARTH CONSTRUCTIONS L1 | PRASHANT NAIK L2 |
|---|---|---|---|---|---|
| 1.00 | Clearing grass and removal of rubbish upto a distance of 50 m outside the periphery of the area | 5,300 | 100 sqm | 4.98 ₹26,394 Lowest | 5.42 ₹28,726 |
| 2.00 | Dismantling the tile work in floors and roofs laid in cement including stacking of materials within 50 meters lead for thickness of tiles 10mm to 25mm. | 250 | Sq.m | 330 ₹82,500 Lowest | 359 ₹89,750 |
| 3.00 | Removing dry or oil bound distemper by scrapping sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. | 1,093.05 | Sq.m | 22 ₹24,047.1 Lowest | 23 ₹25,140.15 |
| 4.00 | Removing old paint of polish with paint remover of approved brand & manufacture & preparing surface | 103.6 | Sq.m | 11 ₹1,139.6 Lowest | 12 ₹1,243.2 |
| 5.00 | Demolishing laterite stone masonry in cement mortar including stacking of serviceable material & disposal of unserviceable material within 50 mts. lead. | 15 | Cu.m | 1,136 ₹17,040 Lowest | 1,238 ₹18,570 |
| 6.00 | Demolishing cement concrete 1:3:6 or richer mix including disposal of material within 50 m lead. | 20 | Cu.m | 8 ₹160 Lowest | 9 ₹180 |
| 7.00 | Dewatering the trenches and bailing out water including removal of slush, mud etc. for any depth and disposal of pumped mud, water, slush to suitable point not forming circuit of return of pumped water to the very trench, by employing diesel generated pump | 30.48 | Cu.m | 498 ₹15,179.04 Lowest | 542 ₹16,520.16 |
| 8.00 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 17 | Cu.m | 2,211 ₹37,587 Lowest | 2,409 ₹40,953 |
| 9.00 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 12.16 | Cu.m | 2,211 ₹26,885.76 Lowest | 2,409 ₹29,293.44 |
| 10.00 | Laterite masonry in neatly dressed stones for 23 cms thick masonry walls in c.m. 1 : 4 (1 cement : 4 coarse sand in foundation upto plinth level | 19.44 | Cu.m | 6,075 ₹1,18,098 Lowest | 6,621 ₹1,28,712.24 |
Tender Value
₹99.4 L
EMD Value
₹2.0 L
Closing Date
20 Aug 2026, 5:00 pmClosed
Member Scretary
GSUDA
Refurbishment of footpath from Forest department to our lady of Lourds High School and refurbishment of existing fish market at Valpoi
2026_GSUDA_30989_1
43/3/GSUDA/Tender/24/790
Open Tender
Civil Works
Works
Valpoi
Please refer Tender documents.
3 documents required · 3 mandatory
₹8,000
₹2.0 L
28 Aug 2026
11 Aug 2026
21 Aug 2026
11 Aug 2026
20 Aug 2026
11 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing grass and removal of rubbish upto a distance of 50 m outside the periphery of the area | 5,300 | 100 sqm | 4.98 | ₹26,394 |
| 2 | Dismantling the tile work in floors and roofs laid in cement including stacking of materials within 50 meters lead for thickness of tiles 10mm to 25mm. | 250 | Sq.m | 330 | ₹82,500 |
| 3 | Removing dry or oil bound distemper by scrapping sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. | 1,093.05 | Sq.m | 22 | ₹24,047.1 |
| 4 | Removing old paint of polish with paint remover of approved brand & manufacture & preparing surface | 103.6 | Sq.m | 11 | ₹1,139.6 |
| 5 | Demolishing laterite stone masonry in cement mortar including stacking of serviceable material & disposal of unserviceable material within 50 mts. lead. | 15 | Cu.m | 1,136 | ₹17,040 |
| 6 | Demolishing cement concrete 1:3:6 or richer mix including disposal of material within 50 m lead. | 20 | Cu.m | 1,122 | ₹22,440 |
| 7 | Dewatering the trenches and bailing out water including removal of slush, mud etc. for any depth and disposal of pumped mud, water, slush to suitable point not forming circuit of return of pumped water to the very trench, by employing diesel generated pump | 30.48 | Cu.m | 498 | ₹15,179.04 |
| 8 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 17 | Cu.m | 2,211 | ₹37,587 |
| 9 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 12.16 | Cu.m | 2,211 | ₹26,885.76 |
| 10 | Laterite masonry in neatly dressed stones for 23 cms thick masonry walls in c.m. 1 : 4 (1 cement : 4 coarse sand in foundation upto plinth level | 19.44 | Cu.m | 6,075 | ₹1,18,098 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.23 MB
Tendernotice_2.pdf
PDF • 3.00 MB
BOQ_31387.xls
BOQ • 0.37 MB
Addendum.pdf
PDF • 0.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .