| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.4 LAccepted-AOC | ₹7.4 L | L1 | Accepted-AOC accepted |
| 2 | L2₹8.1 LRejected-Finance | ₹8.1 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | R.THANGAVEL L1 | SRI GANAPATHI EARTH MOVERS AND CONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 1.00Name of work: Renewal the BT from Odayagoundenpalayam to Vellimalaiyandavar Kovil Km 0/6-1/2 H/O.Odayagoundenpalayam | |||||
| 2.00 | Clearing the Scrub jungle including all labour charges for burrying and burning etc., | 288 | Sqm | 6 ₹1,728 | 8 ₹2,304 |
| 3.00 | Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting side drain etc, complete. as per SS20 A | 25.2 | Cum | 140 ₹3,528 | 155 ₹3,906 |
| 4.00Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction | |||||
| 5.00 | KM 0/000-1/000 | 54 | Cum | 661 ₹35,694 | 675 ₹36,450 |
| 6.00 | Providing and laying Tack Coat over BM surface using 3.0 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5 | 1,800 | Sqm | 34 ₹61,200 | 39 ₹70,200 |
| 7.00 | Providing and laying Bituminous Concrete to 25/30/40 mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30 kgs of VG30/ VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP using( Vibratory Roller) | 45 | Cum | 11,496 ₹5.2 L | 12,550 ₹5.6 L |
| 8.00 | Provision for Name Board | 1 | no | 4,500 ₹4,500 | 5,000 ₹5,000 |
| 9.00 | Provision for Hectometer Stone | 2 | no | 574 ₹1,148 | 585 ₹1,170 |
| 10.00 | Provision for Kilometer stone | 1 | no | 2,197 ₹2,197 | 2,250 ₹2,250 |
Tender Value
₹7.5 L
EMD Value
₹7,480
Closing Date
10 Feb 2026, 3:00 pmClosed
Block Development Officer BP, T.N.Palayam
Block Development Officer(BP), T.N.Palayam
Maintenance of road from odayagoundenpalayam to Vellimalaiyandavar Temple H/O.Odayagoundenpalayam
2026_RDTN_650390_1
3900/2025/A2 Dt 02.02.2026
Open Tender
Civil Works - Roads
120 days
Block Development Office, T.N.Palayam
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹7,480
Yes
13 May 2026
3 Feb 2026
10 Feb 2026
3 Feb 2026
10 Feb 2026
3 Feb 2026
Clearing the Scrub jungle including all labour charges for burrying and burning etc.,
Earth work excavation and depositing on bank within initial lead and lift in hard gravelly soil for Cutting side drain etc, complete. as per SS20 A
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction
Providing and laying Tack Coat over BM surface using 3.0 Kg of Bitumen Emulsion (RS1) per 10 sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per Clause 503 of MORTH Rev-5
Providing and laying Bituminous Concrete to 25/30/40 mm thick using 0.13 cum of 19.00-9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 50.30 kgs of VG30/ VG40 bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory / Pneumatic Roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher / 9m paver finisher, Vibratory / Pneumatic roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP using( Vibratory Roller)
Provision for Name Board
Provision for Hectometer Stone
Provision for Kilometer stone
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for overall quoted amount (for Construction) above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_779820.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.84 MB
BOQ_779820.xls
BOQ • 0.29 MB
techbid.pdf
Tender Documents • 1.07 MB
Download all tender documents and submit your bid