| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAdmitted-Finance | ₹1.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.0 Cr+₹10.8 L (5.70%)Admitted-Finance | ₹2.0 Cr+₹10.8 L (5.70%) | L2 | Admitted-Finance |
| 3 | L3₹2.4 Cr+₹51.3 L (27.1%)Admitted-Finance | ₹2.4 Cr+₹51.3 L (27.1%) | L3 | Admitted-Finance |
| 4 | L4₹2.6 Cr+₹68.2 L (36.0%)Admitted-Finance JHANSI | ₹2.6 Cr+₹68.2 L (36.0%) | L4 | Admitted-Finance |
| 5 | L5₹2.6 Cr+₹68.5 L (36.2%)Admitted-Finance | ₹2.6 Cr+₹68.5 L (36.2%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SWEETY PEST CONTROL L3 | TRAYAMBAKAM ENTERPRISES L2 | ANUBHAV AND CO L1 | B.K.Associates L5 | KUMAR ENGINEERS L6 | Deepesh Electricals L4 |
|---|---|---|---|---|---|---|---|---|---|
| 1.01 | Taking down existing old tarfelt including taking down existing screed bed/bedding layers of cement mortar thickness up to 25mm, making the surface area clean with wire brush and washing the surface and preparing the surface for laying of new screed bed and removing the same at a distance of 1 KM to 1.5 KM including loading, unloading and stacking at the destination all as directed by EIC. | 37,200 | Sqm | 20 ₹7,44,000 Lowest | 20 ₹7,44,000 Lowest | 20 ₹7,44,000 Lowest | 40 ₹14,88,000 | 100 ₹37,20,000 | 40 ₹14,88,000 |
| 1.02 | M&L for taking down old roof cement plaster and spreading net cement slurry @3 kg/sqm and laying of screed bed (1:4) of avg.20 mm thick over cemented surface and the surface to be finished even & smooth without using extra cement and maintaining proper slope for smooth drainage. Cement Make - Birla Perfect pluse, Ultra-Tech, ACC cement. | 37,200 | Sqm | 260 ₹96,72,000 | 175 ₹65,10,000 | 170 ₹63,24,000 | 200 ₹74,40,000 | 120 ₹44,64,000 Lowest | 225 ₹83,70,000 |
| 1.03 | Supply of Liquid water proofing compound for mixing@200ml per bag of cement. Make: Pidilite, Asian, Mendo Semi Liquid (White Clour). | 1,327 | Litre | 80 ₹1,06,160 | 50 ₹66,350 | 45 ₹59,715 Lowest | 120 ₹1,59,240 | 80 ₹1,06,160 | 100 ₹1,32,700 |
| 1.04 | Supply and apply bitumen primer conforming to IS:3384:1986 @ 0.40 Lit/Sqm for use in waterproofing and damp-proofing treatments make of primer as recommanded by of APP memberane manufacturer and approved by EIC. | 37,200 | Sqm | 45 ₹16,74,000 | 40 ₹14,88,000 | 15 ₹5,58,000 Lowest | 80 ₹29,76,000 | 108 ₹40,17,600 | 35 ₹13,02,000 |
| 1.05 | Supply and apply one coat bonding material shall be of blown type bitumen of grade 85/25 heated to a working temperature of 180 degree C and applied @ 1.20 Kg per square metre of the surface area, all as specified in MES SSR part I & II and as directed by EIC. | 37,200 | Sqm | 50 ₹18,60,000 | 44 ₹16,36,800 | 36 ₹13,39,200 Lowest | 70 ₹26,04,000 | 125 ₹46,50,000 | 75 ₹27,90,000 |
| 1.06 | Supply and apply a layer of 3.0mm thick five layered APP based modified polymeric water proofing membrane of weight not less than 3 kg/ Sqm and reinforced with polyster non wove fabric (wt. not less than 150 gms/sqm) of any one make IWL Chennai Ltd., STP Ltd., Asian, Sika properly sealed the joints/overlappings all as specified in MES SSR part I & II and as directed by EIC. | 37,200 | Sqm | 250 ₹93,00,000 Lowest | 253 ₹94,11,600 | 260 ₹96,72,000 | 280 ₹1,04,16,000 | 305 ₹1,13,46,000 | 300 ₹1,11,60,000 |
| 1.07 | M&L for cement mortar plaster on wall, parapet wall, roof raised vertical wall including (removing grass, small trees with uprooting etc. from vertical wall/roof, if found) raking out joint hacking, scrubbing down with water, applying neat cement slurry with 3.0 kg/sq.m & rendering 12mm thick cement plaster 1:4 on wall & surface to be finished even & fair. Cement Make - Birla Perfect pluse, Ultra-Tech, ACC cement | 500 | Sqm | 200 ₹1,00,000 | 175 ₹87,500 | 150 ₹75,000 Lowest | 183.02 ₹91,510 | 150 ₹75,000 Lowest | 200 ₹1,00,000 |
| 1.08 | Cutting grooves in brick wall, 75 mm wide and 65 mm deep and shaping horizontal face of groove with cement mortor 1:3.(for pinning in tarfelt or sheet) | 7,665 | Rm | 70 ₹5,36,550 | 5 ₹38,325 Lowest | 20 ₹1,53,300 | 50 ₹3,83,250 | 50 ₹3,83,250 | 40 ₹3,06,600 |
| 1.09 | Disconnecting existing tanks capacity exc 250 liter and n exc 500 liter, setting aside (or lowering if required) for roof repairs, etc. and hoisting if required, reconnecting and re-fixing in position complete. | 220 | Each | 400 ₹88,000 | 200 ₹44,000 | 100 ₹22,000 Lowest | 1,100 ₹2,42,000 | 990 ₹2,17,800 | 550 ₹1,21,000 |
Tender Value
₹2.9 Cr
EMD Value
₹3.6 L
Closing Date
19 Aug 2025, 5:00 pmClosed
Chief General Manager
Ordnance Factory Kalpi Road Kanpur-208009
Water Proofing treatment of G-I/01 to 126, 151 to 292 and 354 to 578 at Armapur Estate, Kanpur
2025_AWEIL_243947_1
OFC/EOC/20/CE/2025-26
Open Tender
Civil Works
Item Rate
365 days
Armapur Estate, Kanpur
All bidders including bidders who have registered with OFC have to upload all required documents and download tender documents and upload the same duly signed and stamped.
2 documents required · 2 mandatory
₹0
₹3.6 L
Yes
19 Nov 2025
5 Aug 2025
21 Aug 2025
5 Aug 2025
19 Aug 2025
5 Aug 2025
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .