| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.7 LAdmitted-Finance | ₹12.7 L | L1 | Admitted-Finance |
| 2 | L2₹13.9 LAdmitted-Finance | ₹13.9 L | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not Qualified |
| 4 | Rejected-Technical | - | - | Rejected-Technical Not qualified |
| Sl No | Description | Qty | Unit | M/S ALOK ENTERPRISES L2 | MASSIVE CONSTRUCTION CO L1 |
|---|---|---|---|---|---|
| 1.00 | Replacement of burnt/damaged motor by another working B.F.P. Motor (6.6KV,3500KW) | 1 | Nos | 15,971 ₹15,971 | 14,545 ₹14,545 |
| 2.00 | Replacement of burnt/damaged motor by another working I.D. Fan Motor (6.6KV,1700KW) | 1 | Nos | 53,159 ₹53,159 | 48,412 ₹48,412 |
| 3.00 | Replacement of burnt/damaged motor by another working P.A. Fan Motor (6.6KV, 1250KW) | 1 | Nos | 40,267 ₹40,267 | 36,672 ₹36,672 |
| 4.00 | Replacement of burnt/damaged motor by another working F.D. Fan Motor (6.6KV,630KW) | 1 | Nos | 45,506 ₹45,506 | 41,442 ₹41,442 |
| 5.00 | Replacement of burnt/damaged motor by another working Bowl Mill Motor (6.6KV,320/340KW) | 2 | Nos | 24,566 ₹49,132 | 22,372 ₹44,744 |
| 6.00 | Removing & remounting of CEP/CWP/EFP/HP Fire Pump/ SOP Motor(6.6KV, 220KW/ 450KW/ 168KW/ 200KW) | 8 | Nos | 3,322 ₹26,576 | 3,025 ₹24,200 |
| 7.00 | Shifting of HP Ash Water Pump Motors (6.6KV, 262KW) from foundation to ground & vice versa or one foundation to another foundation in same unit | 10 | Nos | 2,892 ₹28,920 | 2,633 ₹26,330 |
| 8.00 | Shifting of HP Ash Water Pump Motors (6.6KV, 262KW) from one unit to another unit | 2 | Nos | 5,099 ₹10,198 | 4,644 ₹9,288 |
| 9.00 | Air-gap adjustment of BFP Motor (6.6KV,3500KW) | 5 | Nos | 5,425 ₹27,125 | 4,940 ₹24,700 |
| 10.00 | Air-gap adjustment of I.D. Fan Motor (6.6KV,1700KW) | 10 | Nos | 7,887 ₹78,870 | 7,182 ₹71,820 |
Updated dates
Tender Value
Refer Docs
EMD Value
₹25,500
Closing Date
8 Dec 2025, 4:00 pmClosed
Superintending Engineer OMC IV BTPS Obra
Office of Superintending Engineer OMC IV BTPS Obra
Maintenance of HT Motors 5X200MW, Obra TPS For Six Months
2025_RVUNL_1091160_1
OBR/B/OMC4/EMD3/6000010084_00
Open Tender
Electrical Works
180 days
OBRA THERMAL POWER PLANT
AS PER PQC
3 documents required · 3 mandatory
₹1,180
Dy. CAO CFA and BO BTPS OBRA
₹25,500
3 Jan 2026
17 Nov 2025
9 Dec 2025
17 Nov 2025
8 Dec 2025
17 Nov 2025
Select, Excess (+), Less (-) Less (-)
Tender Inviting Authority: S.E., O&MC-IV, BTPS, OBRA-SONEBHADRA
Name of Work: Maintenance of HT Motors 5X200MW, Obra TPS for Six Months
Contract No: OBR/B/OMC4/EMD3/6000010084
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Item Description Item Code / Make Quantity Units Estimated Rate Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words
1 Replacement of burnt/damaged motor by another working B.F.P. Motor (6.6KV,3500KW) 1 1 Nos 1.25 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
2 Replacement of burnt/damaged motor by another working I.D. Fan Motor (6.6KV,1700KW) 2 1 Nos 1.25 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
3 Replacement of burnt/damaged motor by another working P.A. Fan Motor (6.6KV, 1250KW) 3 1 Nos 1.25 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
4 Replacement of burnt/damaged motor by another working F.D. Fan Motor (6.6KV,630KW) 4 1 Nos 1.25 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
5 Replacement of burnt/damaged motor by another working Bowl Mill Motor (6.6KV,320/340KW) 5 2 Nos 1.25 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
6 Removing & remounting of CEP/CWP/EFP/HP Fire Pump/ SOP Motor(6.6KV, 220KW/ 450KW/ 168KW/ 200KW) 6 8 Nos 1.25 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
7 Shifting of HP Ash Water Pump Motors (6.6KV, 262KW) from foundation to ground & vice versa or one foundation to another foundation in same unit 7 10 Nos 1.25 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
8 Shifting of HP Ash Water Pump Motors (6.6KV, 262KW) from one unit to another unit 8 2 Nos 1.25 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
9 Air-gap adjustment of BFP Motor (6.6KV,3500KW) 9 5 Nos 1.25 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
10 Air-gap adjustment of I.D. Fan Motor (6.6KV,1700KW) 10 10 Nos 1.25 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
11 Air-gap adjustment of F.D. Fan/P.A. Fan Motor (6.6KV,630KW/1250KW) 11 8 Nos 1.25 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
12 Checking/Replacement of damaged bearing of BM/CEP/CW Pump /SOP Motor 12 10 Nos 1.25 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
13 Checking/Replacement of damaged bearing of HP Ash Pump/Electric Fire Pump/HP Pump Motor 13 5 Nos 1.25 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
14 Dismantling or boxed up of CW Pump/CEP/SOP/BM Motors. 14 4 Nos 1.25 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
15 Dismantling or boxed up of HP Ash Water Pump Motor/HPF/EFP Motor 15 6 Nos 1.25 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
16 Dismantling mono rail chain block from ID/FD/PA Fan Motors, its servicing & remounting from same foundation or other foundation in same unit or other unit of BTPS 16 6 Nos 1.25 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
17 Checking of connection tightness, taking of IR value & K/PI ratio, cleaning of motor winding overhang portion, motor foundation pit, body and floor of BFP Motor (6.6KV,3500KW). 17 8 Nos 1.25 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
18 Checking of connection tightness, taking of IR value & K/PI ratio, cleaning of motor winding overhang portion, motor foundation pit, body and floor of P.A. Fan Motors (6.6KV,1250KW) 18 8 Nos 0 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
19 Checking of connection tightness, taking of IR value & K/PI ratio, cleaning of motor winding overhang portion, motor foundation pit, body and floor of F.D. fan Motors (6.6KV,630KW) 19 8 Nos 100 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
20 Checking of connection tightness, taking of IR value & K/PI ratio, cleaning of motor winding overhang portion, motor foundation pit, body and floor of Bowl Mill Motors(6.6KV,320/340KW) 20 8 Nos 53 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
21 Checking of connection tightness, taking IR value & K/ PI ratio, cleaning of air filters, motor body, foundation pit & floor of B.F.P. Motors (6.6KV,3500KW).. 21 8 Nos 10 Excess(+) Full Conversion INR 3 Supplying, Conveying and fixing spls. Including ea item4 10 Nos
22 Checking of connection tightness, taking IR value & K/PI ratio, cleaning motor body & foundation floor of I.D. Fan Motor(6.6KV,1700KW) 22 8 Nos 11 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
23 Checking of connection tightness, taking IR value & K/PI ratio, cleaning motor body & foundation floor of P.A. Fan Motor(6.6KV,1250KW) 23 8 Nos 10 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
24 Checking of connection tightness, taking IR value & K/PI ratio, cleaning motor body & foundation floor of F.D. Fan Motor(6.6KV,630KW) 24 5 Nos 22 Excess(+) Full Conversion INR 1.02 Construction of chamber for 100mm sluice plates item2 213 Nos
25 Checking of connection tightness, taking IR value & K/PI ratio, cleaning motor body & foundation floor of Bowl Mill Motors(6.6KV,320/340KW) 25 5 Nos 0 Excess(+) Full Conversion INR 2 Construction of chamber for 100mm sluices valve item3 10 Nos
26 Checking of connection tightness, taking of IR value & K/PI ratio and cleaning of motor body of CW Pump, HP Ash Water Pump, CEP, SOP, EFP & HPF motors: 26 15 Nos 0 Excess(+) 1 Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
27 Fabrication & fitting of Sleeve in top/bottom side bearing housing of HP Ash Water Pump Motor(6.6KV, 262KW) CEP Motor(6.6KV, 220KW) 27 4 Nos 0 Excess(+) 1 Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
28 Fabrication & fitting of Sleeve in top/bottom side bearing housing of Bowl Mill Motor(6.6KV,320/340KW) 28 4 Nos 0 Excess(+) 1 Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
29 Reconditioning and partial repair of stators of BFP/ID/PA/FD/Fan Motors at foundation. 29 1 Nos 1.25 Excess(+) 1 Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
30 Reconditioning and partial repair of stators of Condensate Pump/SOP/CW Pump/HP Ash/ HP Pump Motor. The work include as sl.no.29 above. 30 1 Nos 1.25 Excess(+) 1 Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
31 Partial re-insulation and rewinding of stators of following motors: FD Fan/PA Fan/ID Fan & BFP motor (stator upper coil) 31 1 Nos 1.25 Excess(+) 1 Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
32 Partial re-insulation and rewinding of stators of following motors: FD Fan/PA Fan/ID Fan & BFP motor (stator bottom coil) 32 1 Nos 1.25 Excess(+) 1 Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
33 Partial re-insulation and rewinding of stators of following motors: HP Ash Water Pump Motor/Condensate Pump Motor/Bowl Mill/SOP/EFP/HP Fire Pump Motor (Stator upper coil) 33 1 Nos 1.25 Excess(+) 1 Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
34 Partial re-insulation and rewinding of stators of following motors: HP Ash Water Pump Motor/Condensate Pump Motor/Bowl Mill/SOP/EFP/HP Fire Pump Motor (Stator bottom coil) 34 1 Nos 1.25 Excess(+) 1 Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
35 Only checking after opening covers etc. on foundation of BFP/ID/FD/PA Fan motor at site/foundation. 35 1 Nos 1.25 Excess(+) 1 Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
36 Dismantling, removing, complete cleaning, HT of coolers, Box up with proper gasketing and commissioning of BFP Motor Water Coolers. 36 10 Nos 1.25 Excess(+) 1 Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
37 Dismantling, removing, complete cleaning (internal/ external), HT of coolers, Box up, commissioning with proper gasketing, cleaning of cooler chamber & its box up of I.D. Motor Water Coolers. 37 10 Nos 1.25 Excess(+) 1 Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
38 Dismantling, Removing, Complete Cleaning (Internal/External)HT of Coolers, Box up, Commissioning with proper gasketting, cleaning of Cooler Chambers & Pits, Box Up of CW Water Pump Motor Water Cooler. 38 25 Nos 1.25 Excess(+) 1 Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
39 Removing Overhead Shed, Opening of Side cover, Dismantling & removing cooler from Motor, Complete Cleaning (Internal/External) & mounting of air cooler of PA Fan & FD Fan Motors & mounting of overhead shed. 39 10 Nos 1.25 Excess(+) 1 Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
40 Cleaning of Winding overhang portion, Foundation floor of ID Fan Motor & Complete Box up of ID Fan Motor with proper Gasketting. 40 13 Nos 1.25 Excess(+) 1 Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
Total in Figures 4 Construction of chamber for 100mm sluice plates item5 10 Nos
Quoted Rate in Figures Select
Quoted Rate in Words
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.02 MB
BOQ_2004071.xls
BOQ • 0.38 MB
TSD.pdf
Tender Documents • 0.17 MB
Download all tender documents and submit your bid