Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹16.6 LAdmitted-Finance | -35.70% | ₹16.6 L | L1 | Admitted-Finance |
| 2 | L2₹18.8 L+₹2.1 L (12.8%)Admitted-Finance | -27.50% | ₹18.8 L+₹2.1 L (12.8%) | L2 | Admitted-Finance |
| 3 | L3₹19.7 L+₹3.0 L (18.2%)Admitted-Finance | -24.00% | ₹19.7 L+₹3.0 L (18.2%) | L3 | Admitted-Finance |
| 4 | L4₹23.3 L+₹6.7 L (40.0%)Admitted-Finance | -10.00% | ₹23.3 L+₹6.7 L (40.0%) | L4 | Admitted-Finance |
| 5 | L5₹24.6 L+₹7.9 L (47.6%)Admitted-Finance | -5.10% | ₹24.6 L+₹7.9 L (47.6%) | L5 | Admitted-Finance |
Tender Value
₹25.9 L
EMD Value
₹51,780
Closing Date
18 May 2026, 4:00 pmClosed
Executive Engineer PWD Rnb division Leh
Office of the Executive Engineer Rnb division Leh
Construction of footpath and sewerage system from Leh palace road to Chutay Rantak by way of F/Path near Guru Lakhang Leh
2026_PWD_18840_2
E Tender 13 of R and B Division Leh
Open Tender
Civil Works - Others
Percentage
65 days
Leh
Please refer Tender documents.
9 documents required · 9 mandatory
₹1,000
Office of the Executive Engineer Rnb division Leh
₹51,780
21 May 2026
25 Apr 2026
20 May 2026
25 Apr 2026
18 May 2026
25 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means over areas (exceeding 30 cm in depth,
1.5 m in width as well as 10 sqm on plan) including getting out and disposal of
excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-incharge.Hard rock (blasting prohibited) Manual Means | 204 | cum | 2,054.49 | ₹4,19,115.96 |
| - | Random rubble masonry with hard stone in foundation and plinth including
levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded
stone aggregate 20 mm nominal size) upto plinth level with :
Cement mortar 1:6 (1 cement : 6 coarse sand) | 90 | cum | 5,730.38 | ₹5,15,734.2 |
| - | Providing and laying in position cement concrete of specified grade excluding the
cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded
stone aggregate 20 mm nominal size derived from natural sources) | 170 | cum | 7,993.55 | ₹13,58,903.5 |
| - | Centering and shuttering including strutting, propping etc. and removal of form
work for :
Foundations, footings, bases for columns | 156.5 | Sqm | 306.15 | ₹47,912.48 |
| - | Carriage of material by Mechanical Cement lead …......................... 10 km | 54.4 | MT | 241.38 | ₹13,131.07 |
| - | Sand lead …....................20 km | 76.5 | cum | 384.74 | ₹29,432.61 |
| - | Aggregate lead …................ 20 km | 144.5 | cum | 384.74 | ₹55,594.93 |
| - | Stone lead …......... 20 km | 90 | cum | 452.67 | ₹40,740.3 |
| - | Carriage of material by Maual Labour Cement lead …......................... 200m | 54.4 | MT | 162.27 | ₹8,827.49 |
| - | Sand lead …....................200 m | - | CUM | 312.97 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.63 MB
BOQ_44992.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .