Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹3.8 L+₹21,000 (5.83%)Rejected-AOC 16 19 ATTAIAMAL NAGAR 1 KANNAKURICHY SALEM 636008 | SALEM | SALEM | TAMIL NADU | 636008 | L2 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | SRS ENTERPRISES L2 | ROHITH ENGINEERING WORKS L1 |
|---|---|---|---|---|---|
| 1.00 | Charges for dismantling the tunnel by pass line bend (Inlet side) with NB 600 mm Butterfly valve and re-fixing the same after completing the tunnel cleaning work by Civil maintenance including cost of consumables & T&P's. | 3 | Nos | 65,000 ₹1,95,000 | 60,000 ₹1,80,000 Lowest |
| 2.00 | Overhauling of NB 600 mm Butterfly valve actuator (This work involves: - Dismantling, cleaning, servicing and renewal of internal spares in gear box, greasing, assembling and commissioning etc.) including cost of consumables & T&P's. | 3 | Nos | 30,000 ₹90,000 | 29,000 ₹87,000 Lowest |
| 3.00 | Complete removal of existing peel out wrapping coating, cleaning the surface thoroughly and providing wrapping coating on the outer surface of the entire tunnel bypass bend and flanges, (including cost of materials, consumables and T&P’s.) | 3 | Mtrs | 32,000 ₹96,000 | 31,000 ₹93,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹4,300
Closing Date
26 Jul 2025, 2:00 pmClosed
SE MI NCTPS1 CH 120
O/o SE MI NCTPS1 CH 120
NCTPS I SE MI circle AOH 25 26 TM Dn Unit I II III Dismantling the tunnel by pass line bend Inlet side NB 600 MM Butterfly valve and removal of existing peeled out wrapper coating and providing of new wrapper coating in tunnel by pass bend
2025_EB_584508_1
CE SE MI NCTPS I 127 25 26
Open Tender
Power/Energy Projects/Products
Works
120 days
Works
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹4,300
Yes
16 Oct 2025
23 Jul 2025
28 Jul 2025
23 Jul 2025
26 Jul 2025
23 Jul 2025
Amount
Charges for dismantling the tunnel by pass line bend (Inlet side) with NB 600 mm Butterfly valve and re-fixing the same after completing the tunnel cleaning work by Civil maintenance including cost of consumables & T&P's.
Overhauling of NB 600 mm Butterfly valve actuator (This work involves: - Dismantling, cleaning, servicing and renewal of internal spares in gear box, greasing, assembling and commissioning etc.) including cost of consumables & T&P's.
Complete removal of existing peel out wrapping coating, cleaning the surface thoroughly and providing wrapping coating on the outer surface of the entire tunnel bypass bend and flanges, (including cost of materials, consumables and T&P’s.)
SRS ENTERPRISES (BID ID -1412647)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .