| 1 | L1₹4.6 CrAccepted-AOC 801802 SAKAR IV OPP MJ LIBERARY ELLISBRIDGE ASHRAM ROAD AHMEDABAD AHMEDABAD GUJARAT 380006 | 801802 | ₹4.6 Cr | L1 | Accepted-AOC Being Lowest Bidder |
| 2 | L2₹4.6 Cr+₹78,274.60 (0.17%)Rejected-Finance | ₹4.6 Cr+₹78,274.60 (0.17%) | L2 | Rejected-Finance Quoted rates are more than L1 |
| 3 | Rejected-Technical NO 144 SEEVARAM 1ST STREET PERUNGUDI CHENNAI TAMIL NADU 600041 | CHENNAI | TAMIL NADU | 600041 | - | - | Rejected-Technical Firm does not meet experience criteria of executed works even for one class below the eligible class |
| 4 | Rejected-Technical 42 608A PULLOMPARAMBIL HOUSE MANDAKARA ROAD KOCHI 682 018 | ERNAKULAM | KERALA | 682018 | - | - | Rejected-Technical Firm is not enlisted for eligible category d(iv) |
Tender Value
Refer Docs
EMD Value
₹5.8 L
Closing Date
17 Jul 2021, 6:00 pmClosed
Chief Engineer Chennai Zone
Island Grounds, Chennai 600 009
AUTOMATION OF SCADA WATER SUPPLY SYSTEM
2020_MES_399311_1
88524/E8
Open Tender
Information Technology
Item Rate
365 days
Bangalore
As per NIT
7 documents required · 7 mandatory
₹2,000
GE South Bangalore
₹5.8 L
Yes
23 Sept 2021
28 Nov 2020
19 Jul 2021
28 Nov 2020
17 Jul 2021
15 May 2021
28 Nov 2020 - 7 Dec 2020
Amount
SCADA WORKS
Taking down old unserviceable sluice valve of size 80mm dia and taken in to sch of credit all as directed.
Taking down old unserviceable sluice valve of size 100mm dia and taken in to sch of credit all as directed.
Taking down old unserviceable sluice valve of size 150mm dia and taken in to sch of credit all as directed.
Taking down old unserviceable sluice valve of size 200mm dia and taken in to sch of credit all as directed.
Supply, installation, testing and commissioning of Indoor type PLC (Programmable Logic Controller) based Slave Monitoring / Annunciating Control Panel made out of 2 mm thick CRCA sheet duly powder coated for control and monitoring of 07 Nos centrifugal pumps ,10 Nos Motorized butterfly valves, 04 nos. magnetic level sensors, 02 Nos Ultra Sonic Level Sensor, 09 Nos valves for priming motorised valves, 07 Nos Pressure transmitters and 07 Nos air release Solenoid valves
(i) The panel shall consist of the following equipments required to be installed at FMCC PH:- (a) Water Level Sensing & Display (b) Pump On/Off (c) Auto priming (d) Operation of Motor Actuated Butterfly Valves (e) Automatic Toggling of Pumps (f) Auto Change Over In Case of Pump Failure (g) Single Phasing Prevention (h) Manual Mode Operation
The PLC based Panel shall consist of the following sub systems:- (i) 07 nos.energy meters three phase alongwith suitable current transformer for three phase pumps (installed at site) with in built mod bus communication port (ii) 01 no.PLC with following specifications:- (a) Digital inputs, outputs and analog inputs and outputs (as per system requirement + 25% spare capacity) (b) 4 serial ports supporting open communication protocol (c) Programming software based on IEC to facilitate building of custom built function blocks (d) Expandable up to 192 DI / DOs (iii) 01 no. HMI - 7" (min) Graphical Touch screen mluticolour having following minimum features:- (a) 02 nos. serial ports and 01 no. USB port (b) Floating point support (c) Built in RTC (d) Bar Graph and image (bmp, jpeg files) (e) Real-time and historical Trending, (f) Real-time and historical alarms,
(iv) 01 no. SMPS of 5 A rating (vi) 01 no. Suitable Surge Protection device suitable for 230V incoming supply (viii) Suitable no. of interposing relays 24V D.C. coil rating and 5 A contact rating (ix)1 KVA UPS / INVERTER with Sealed Maintenance free Batteries for powering the panel for a minimum of 30 minutes in case of supply failure. (x) Transformer of suitable rating (xi) MCB of suitable rating (xii) Single Phase Preventer (xiii) Illuminated Push Buttons, Push Buttons and Indicator Lamps as per requirement
Supply, Installation, Testing and Commissioning of Indoor type PLC (Programmable Logic Controller) based Slave Monitoring / Annunciating Control Panel made out of 2 mm thick CRCA sheet duly powder coated for control and monitoring of 05 Nos centrifugal pumps ,09 Nos Motorized butterfly valves, 04 nos. magnetic level sensors, 04 Nos Ultra Sonic Level Sensor, 07 Nos valves for priming motorised valves, 05 Nos Pressure transmitters and 05 Nos air release Solenoid valves
The panel shall consist of the following equipments required at Harris Barrack Pump House:- (a) Water Level Sensing & Display (b) Pump On/Off (c) Auto priming (d) Operation of Motor Actuated Butterfly Valves (e) Automatic Toggling of Pumps (f) Auto Change Over In Case of Pump Failure (g) Single Phasing Prevention (h) Manual Mode Operation
The PLC based Panel shall consist of the following sub systems (i) 05 nos.energy meters three phase alongwith suitable current transformer for three phase pumps (installed at site) with in built mod bus communication port (ii) 01 no.PLC with following specifications:- (a) Digital inputs, outputs and analog inputs and outputs (as per system requirement + 25% spare capacity) (b) 4 serial ports supporting open communication protocol (c) Programming software based on IEC to facilitate building of custom built function blocks (d) Expandable up to 192 DI / DOs (iii) 01 no. HMI - 7" (min) Graphical Touch screen mluticolour having following minimum features:- (a) 02 nos. serial ports and 01 no. USB port (b) Floating point support (c) Built in RTC (d) Bar Graph and image (bmp, jpeg files) (e) Real-time and historical Trending, (f) Real-time and historical alarms,
(iv) 01 no. SMPS of 5 A rating (v) 01 no. Suitable Surge Protection device suitable for 230V incoming supply (vi) Suitable no. of interposing relays 24V D.C. coil rating and 5 A contact rating (vii)1 KVA UPS / INVERTER with Sealed Maintenance free Batteries for powering the panel for a minimum of 30 minutes in case of supply failure. (viii) Transformer of suitable rating (ix) MCB of suitable rating (x) Single Phase Preventer (xi) Illuminated Push Buttons, Push Buttons and Indicator Lamps as per requirement
Supply, Installation, Testing and Commissioning of Indoor type PLC (Programmable Logic Controller) based Slave Monitoring / Annunciating Control Panel made out of 2 mm thick CRCA sheet duly powder coated for control and monitoring of 01 No under ground Sump , 02 Nos centrifugal pumps, 04 Nos Motorized butterfly valves, 02 Nos Ultra Sonic Level Sensor, 03 Nos priming valves, 02 Nos air release valves, 02 Nos pressure transmitters)
The panel shall consist of the following equipments required at GTE Pump House:- (a) Water Level Sensing & Display (b) Pump On/Off (c) Auto priming (d) Operation of Motor Actuated Butterfly Valves (e) Automatic Toggling of Pumps (f) Auto Change Over In Case of Pump Failure (g) Single Phasing Prevention (h) Manual Mode Operation
The PLC based Panel shall consist of the following sub systems:- (i) 02 no senergy meters three phase alongwith suitable current transformer for three phase pumps (installed at site) with in built mod bus communication port (ii) 01 no.PLC with following specifications:- (a) Digital inputs, outputs and analog inputs and outputs (as per system requirement + 25% spare capacity) (b) 4 serial ports supporting open communication protocol (c) Programming software based on IEC to facilitate building of custom built function blocks (d) Expandable up to 192 DI / DOs (iii) 01 no. HMI - 7" (min) Graphical Touch screen mluticolour having following minimum features:- (a) 02 nos. serial ports and 01 no. USB port (b) Floating point support (c) Built in RTC (d) Bar Graph and image (bmp, jpeg files) (e) Real-time and historical Trending, (f) Real-time and historical alarms,
(iv) 01 no. SMPS of 5 A rating (v) 01 no. Suitable Surge Protection device suitable for 230V incoming supply (vi) Suitable no. of interposing relays 24V D.C. coil rating and 5 A contact rating (vii)1 KVA UPS / INVERTER with Sealed Maintenance free Batteries for powering the panel for a minimum of 30 minutes in case of supply failure. (viii) Transformer of suitable rating (ix) MCB of suitable rating (x) Single Phase Preventer (xi) Illuminated Push Buttons, Push Buttons and Indicator Lamps as per requirement
Supply, Installation, Testing and Commissioning of Outdoor type PLC (Programmable Logic Controller) based Slave Monitoring / Annunciating Control Panel made out of 2.0 mm thick CRCA sheet duly powder coated and canopy should be 3.0mm thickness for control and monitoring of 09 Nos Motorized butterfly valves, 01 Nos Ultrasonic level sensor,
The panel shall consist of the following equipments required at HR BK OHT 1:- (a) Water Level Sensing & Display (b) operation of Motor Actuated Butterfly Valves (c) Manual Mode Operation
The PLC based Panel shall consist of the following sub systems:- (i) 01 no.PLC with following specifications:- (a) suitable number of Digital inputs, outputs and analog inputs and outputs (+ 25% spare capacity) (b) 4 serial ports supporting open communication protocol (c) Programming software based on IEC to facilitate building of custom built function blocks (d) Expandable up to 192 DI / DOs (ii) 01 no. HMI - 7" (min) Graphical Touch screen mluticolour having following minimum features:- (a) 02 nos. serial ports and 01 no. USB port (b) Floating Point support (c) Built in RTC (d) Bar Graph and image (bmp, jpeg files) (e) Real-time and historical Trending, (f) Real-time and historical alarms, (iii) 01 no. SMPS of 5 A rating
iv) 01 no. Suitable Surge Protection device suitable for 230V incoming supply (v) Suitable no. of interposing relays24V D.C. coil rating and 5 A contact rating (vi)1 KVA UPS / INVERTER with Sealed Maintenance free Batteries for powering the panel for a minimum of 30 minutes in case of supply failure. (vii) Transformer of suitable rating (viii) MCB of suitable rating (ix) Single Phase Preventer (x) Illuminated Push Buttons, Push Buttons and Indicator Lamps as per requirement
Supply, Installation, Testing and Commissioning of Outdoor type PLC (Programmable Logic Controller) based Slave Monitoring / Annunciating Control Panel made out of 2.0 mm thick CRCA sheet duly powder coated and canopy should be 3.0mm thickness for control and monitoring of 05 Nos Motorized butterfly valves, 01 Nos Ultrasonic level sensor,
The panel shall consist of the following equipments required at HR BK OHT 2:- (a) Water Level Sensing & Display (b) operation of Motor Actuated Butterfly Valves (c) Manual Mode Operation
The PLC based Panel shall consist of the following sub systems:- (i) 01 no.PLC with following specifications:- (a) suitable number of Digital inputs, outputs and analog inputs and outputs (+ 25% spare capacity) (b) 4 serial ports supporting open communication protocol (c) Programming software based on IEC to facilitate building of custom built function blocks (d) Expandable up to 192 DI / DOs (ii) 01 no. HMI - 7" (min) Graphical Touch screen mluticolour having following minimum features:- (a) 02 nos. serial ports and 01 no. USB port (b) Floating Point support (c) Built in RTC (d) Bar Graph and image (bmp, jpeg files) (e) Real-time and historical Trending, (f) Real-time and historical alarms, (iii) 01 no. SMPS of 5 A rating
iv) 01 no. Suitable Surge Protection device suitable for 230V incoming supply (v) Suitable no. of interposing relays 24V D.C. coil rating and 5 A contact rating (vi)1 KVA UPS / INVERTER with Sealed Maintenance free Batteries for powering the panel for a minimum of 30 minutes in case of supply failure. (v) Transformer of suitable rating (vii) MCB of suitable rating (viii) Single Phase Preventer (ixi) Illuminated Push Buttons, Push Buttons and Indicator Lamps as per requirement
Supply, Installation Testing & Commissioning of Programmable Logic Controller based Pump Automation and Protection Panel of 03 Nos pumps, 03 nos. energy meters, 08 Nos motorized valves, 03 Nos Pressure Transmitters, 03 Nos Ultra sonic level sensor, 05 nos. solenoid valves and 02 nos. Magnetic sensors of suitable size fabricated from 1.6 mm thick CRCA sheet and properly powder coated
The panel shall consist of the following equipments required at Depot Battalion PH:- (a) Water Level Sensing & Display (b) Pump On/Off (c) Auto priming (d) Operation of Motor Actuated Butterfly Valves (e) Automatic Toggling of Pumps (f) Auto Change Over In Case of Pump Failure (g) Single Phasing Prevention (h) Manual Mode Operation
The PLC based Panel shall consist of the following sub systems:- (i) 02 nos energy meters three phase alongwith suitable current transformer for three phase pumps (installed at site) with in built mod bus communication port (ii) 01 no.PLC with following specifications:- (a) Digital inputs, outputs and analog inputs and outputs (as per system requirement + 25% spare capacity) (b) 4 serial ports supporting open communication protocol (c) Programming software based on IEC to facilitate building of custom built function blocks (d) Expandable up to 192 DI / DOs (iii) 01 no. HMI - 7" (min) Graphical Touch screen mluticolour having following minimum features:- (a) 02 nos. serial ports and 01 no. USB port (b) Floating point support (c) Built in RTC (d) Bar Graph and image (bmp, jpeg files) (e) Realtime and historical Trending, (f) Real-time and historical alarms,
(iv) 01 no. SMPS of 5 A rating (v) 01 no. Suitable Surge Protection device suitable for 230V incoming supply (vi) Suitable no. of interposing relays 24V D.C. coil rating and 5 A contact rating (vii)1 KVA UPS / INVERTER with Sealed Maintenance free Batteries for powering the panel for a minimum of 30 minutes in case of supply failure. (viii) Transformer of suitable rating (ix) MCB of suitable rating (x) Single Phase Preventer (xi) Illuminated Push Buttons, Push Buttons and Indicator Lamps as per requirement
Supply, Installation Testing & Commissioning of Programmable Logic Controller based Pump Automation and Protection Panel of 05 Nos pumps, 05 nos. energy meters, 06 Nos motorized valves, 05 Nos Pressure Transmitters, 02 Nos Ultra sonic level sensor, 12 nos. solenoid valves and 04 nos. Magnetic sensors of suitable size fabricated from 1.6 mm thick CRCA sheet and properly powder coated
The panel shall consist of the following equipments required to be installed at Assaye Parade PH:- (a) Water Level Sensing & Display (b) Pump On/Off (c) Auto priming (d) Operation of Motor Actuated Butterfly Valves (e) Automatic Toggling of Pumps (f) Auto Change Over In Case of Pump Failure (g) Single Phasing Prevention (h) Manual Mode Operation
The PLC based Panel shall consist of the following sub systems (i) 02 nos. energy meters three phase alongwith suitable current transformer for three phase pumps (installed at site) with in built mod bus communication port (ii) 01 no.PLC with following specifications:- (a) Digital inputs, outputs and analog inputs and outputs (as per system requirement + 25% spare capacity) (b) 4 serial ports supporting open communication protocol (c) Programming software based on IEC to facilitate building of custom built function blocks (d) Expandable up to 192 DI / DOs (iii) 01 no. HMI - 7" (min) Graphical Touch screen mluticolour having following minimum features:- (a) 02 nos. serial ports and 01 no. USB port (b) Floating point support (c) Built in RTC (d) Bar Graph and image (bmp, jpeg files) (e) Real-time and historical Trending, (f) Real-time and historical alarms,
(iv) 01 no. SMPS of 5 A rating (v) 01 no. Suitable Surge Protection device suitable for 230V incoming supply (vi) Suitable no. of interposing relays 24V D.C. coil rating and 5 A contact rating (vii)1 KVA UPS / INVERTER with Sealed Maintenance free Batteries for powering the panel for a minimum of 30 minutes in case of supply failure. (viii) Transformer of suitable rating (ix) MCB of suitable rating (x) Single Phase Preventer (xi) Illuminated Push Buttons, Push Buttons and Indicator Lamps as per requirement
Supply, Installation Testing & Commissioning of Programmable Logic Controller based Pump Automation and Protection Panel of 04 Nos pumps( 02 nos Centrifugal pumps and 02 nos submersible pumps), 04 nos. energy meters, 04 Nos motorized valves, 04 Nos Pressure Transmitters, 02 Nos Ultra sonic level sensor, 05 nos. solenoid valves and 02 nos. Magnetic sensors of suitable size fabricated from 1.6 mm thick CRCA sheet and properly powder coated
The panel shall consist of the following equipments required to be installed at Training battalion 1 PH:- (a) Water Level Sensing & Display (b) Pump On/Off (c) Auto priming (d) Operation of Motor Actuated Butterfly Valves (e) Automatic Toggling of Pumps (f) Auto Change Over In Case of Pump Failure (g) Single Phasing Prevention (h) Manual Mode Operation
The PLC based Panel shall consist of the following sub systems:- (i) 02 nos energy meters three phase alongwith suitable current transformer for three phase pumps (installed at site) with in built mod bus communication port (ii) 01 no.PLC with following specifications:- (a) Digital inputs, outputs and analog inputs and outputs (as per system requirement + 25% spare capacity) (b) 4 serial ports supporting open communication protocol (c) Programming software based on IEC to facilitate building of custom built function blocks (d) Expandable up to 192 DI / DOs (iii) 01 no. HMI - 7" (min) Graphical Touch screen mluticolour having following minimum features:- (a) 02 nos. serial ports and 01 no. USB port (b) Floating point support (c) Built in RTC (d) Bar Graph and image (bmp, jpeg files) (e) Real-time and historical Trending, (f) Real-time and historical alarms,
(iv) 01 no. SMPS of 5 A rating (v) 01 no. Suitable Surge Protection device suitable for 230V incoming supply (vi) Suitable no. of interposing relays 24V D.C. coil rating and 5 A contact rating (vii)1 KVA UPS / INVERTER with Sealed Maintenance free Batteries for powering the panel for a minimum of 30 minutes in case of supply failure. (viii) Transformer of suitable rating (ix) MCB of suitable rating (x) Single Phase Preventer (xi) Illuminated Push Buttons, Push Buttons and Indicator Lamps as per requirement
Supply, Installation Testing & Commissioning of Programmable Logic Controller based Valve Automation and Protection Panel including online level monitoring of 01 Nos Ultra sonic level sensor and 03 Nos motorized valves , of suitable size fabricated from 1.6 mm thick CRCA sheet and properly powder coated.
The panel shall consist of the following equipments required to be installed at OHT feeding from Assaye Parade PH:- (a) Water Level Sensing & Display (b) operation of Motor Actuated Butterfly Valves (c) Manual Mode Operation
The PLC based Panel shall consist of the following sub systems:- (i) 01 no.PLC with following specifications:- (a) suitable number of Digital inputs, outputs and analog inputs and outputs (+ 25% spare capacity) (b) 4 serial ports supporting open communication protocol (c) Programming software based on IEC to facilitate building of custom built function blocks (d) Expandable up to 192 DI / DOs (ii) 01 no. HMI - 7" (min) Graphical Touch screen mluticolour having following minimum features:- (a) 02 nos. serial ports and 01 no. USB port (b) Floating Point support (c) Built in RTC (d) Bar Graph and image (bmp, jpeg files) (e) Real-time and historical Trending, (f) Real-time and historical alarms, (iii) 01 no. SMPS of 5 A rating
iv) 01 no. Suitable Surge Protection device suitable for 230V incoming supply (v) Suitable no. of interposing relays 24V D.C. coil rating and 5 A contact rating (vi)1 KVA UPS / INVERTER with Sealed Maintenance free Batteries for powering the panel for a minimum of 30 minutes in case of supply failure. (vii) Transformer of suitable rating (viii) MCB of suitable rating (ix) Single Phase Preventer (x) Illuminated Push Buttons, Push Buttons and Indicator Lamps as per requirement
Supply, Installation, Testing and Commissioning of Float type Point Level Sensor with the following specifications all as directed by Engineer-in-Charge. Type: Magnetic Magnet: Ring type Switch: Reed Switch (Epoxy sealed) Connecting Cable: Teflon
Supply, Installation Testing & Commissioning of Motor Actuated Butterfly Valve of following size consisting of Quarter turn single phase Actuator and Wafer type butterfly valve with appropriate bracket/mounting arrangement including two nos. limit switches for open and closed condition and splash proof enclosure complete with following specifications & Features and as directed by Engineer-in-Charge. Input Voltage: 230 V, A.C. Designed line pressure: 16 kg/sq. cm. Operating Angle: 90 degrees Disc Material: CI with nylon coating Limit Switches : 02 Nos.For open and close status In built Serial / USB communication Port In built data logger with memory In built SD Card Space Heater Mounting : Direct
valve of size 80mm dia
valve of size 100mm dia
valve of size 150mm dia
valve of size 200mm dia
Supply, Installation Testing & Commissioning of Motor Actuated Butterfly Valve of following size consisting of Quarter turn single phase Actuator and Wafer type butterfly valve with appropriate bracket/mounting arrangement including two nos. limit switches for open and closed condition and splash proof enclosure complete with Specifications & Features and as directed by Engineer-in-Charge. Input Voltage: 230 V, A.C. Designed line pressure: 16 kg/sq. cm. Operating Angle: 90 degrees Disc Material: CI with nylon coating Limit Switches : 02 Nos.For open and close status In built Serial / USB communication Port In built data logger with memory In built SD Card Space Heater Mounting : Extended type with suitable adoptor and angle iron for installation above ground level
valve of size 80mm dia
valve of size 100mm dia
valve of size 150mm dia
valve of size 200mm dia
Supply, Installation Testing & Commissioning of pressure transmitter with following specification including necessary power pack for supply of DC complete all as directed by Engineer-in-Charge. Power supply: 10-36 V DC Process connection: G ½ “ Enclosure: whether proof IP 65 Process temperature: -30 to 120 Celsius Accuracy: 0.25 %
Supply, Installation Testing & Commissioning of solenoid / motorised valve suitable for 25mm GI pipe for priming of pump including suitable bypass arrangement with necessary GI fittings with following specifications complete all as directed by Engineer-in-Charge. Size: 25 mm Pressure rating: 6 kg / sq. cm.
Supply, Installation, Testing & Commissioning of solenoid valve suitable for 10mm GI pipe for priming of pump including bypass arrangement using 10 mm. gate / ball valve with necessary GI fittings with following specifications complete all as directed by Engineer-in-Charge. Size: 10 mm Material Pressure rating: 6 kg / sq. cm. Normally closed
Supply, Installing,Testing and Commissioning of Residual Chlorine Sensor and Transmitter a fixed in Panel of suitable size along with necessary piping with following detailed Specification complete all as directed by Engineer-in-Charge. Range: 0 to 5 mg/l free or total residual chlorine Accuracy: ±5% or ±0.035 mg/l as CL2, whichever is greater Precision:±5% or 0.005 mg/l as CL2, whichever is greater Minimum Detection Limit: 0.035 mg/l Cycle Time: 2.5 minutes
Inlet Pressure to Instrument: 1 to 5 psig (1.5 psig is optimum) Inlet Pressure to Sample Conditioning: 1.5 to 75 psig Sample Flow: 200 to 500 ml per minute minimum required Sample Temperature: 5 to 40°C (41 to 104°F) Operating Temperature: 5 to 40°C (41 to 104°F) Operating Humidity: 90% at 40°C (90% at 104°F) maximum Recorder Outputs: One 4-20 mA with an output span programmable over any portion of the 0 to 5 mg/l range, 130 V isolation from earth ground, 500 ohm maximum, One isolated recorder output, 4–20 mA (can be adjusted to 0–20 mA), recommended load impedance 3.6 to 500 ohms
Supply, Installing,Testing and Commissioning of pH & turbidity sensor and Transmitter fixed in Panel of suitable size along with necessary piping with following detailed specification complete all as directed by Engineer-in-Charge. Measuring Range: 0 to 14 pH Accuracy: Less than 0.1 pH under reference conditions Temperature Range: 0 to 105ºC (32 to 221ºF) Flow Rate: 0 to 2 m/s (0 to 6.6 ft./s); non-abrasive Pressure Range: 0 to 6.9 bar at 100ºC (0 to 100 psig at 212ºF)
Signal Transmission Distance: 100m (328 ft.) when used with the Hach Digital Gateway Digital Controller. 1000 m (3280 ft.) Termination Box, and a Hach sc Digital Controller. Sensor Cable: Integral coaxial cable (plus two conductors for temperature compensator option); 4.5 m (15 ft.) long Wetted Materials: Convertible style: Ryton® body (glass filled) Insertion style: PVDF body (Kynar®) Sanitary style: 316 stainless steel sleeved PVDF body Common materials for all sensor styles include PTFE Teflon double junction, glass process electrode, and Viton® O-rings Detailed Specification for Turbidity Sensors: Range: 0.001-100 Nephelometric Turbidity Units (NTU)
Accuracy: (Defined according to ISO 15839.) ±2% of reading or ±0.015 NTU (whichever is greater) from 0 to 40 NTU; ±5% of reading from 40 to 100 NTU Displayed Resolution: 0.0001 NTU up to 9.9999 NTU; 0.001 NTU from 10.000 to 99.999 NTU Repeatability: (Defined according to ISO 15839.) Better than ±1.0% of reading or ±0.002 NTU, whichever is greater Response Time: Initial response in 1 minute, 15 seconds for a full-scale step change
Supply, Installing,Testing and Commissioning of Ultrasonic Level Transmitter complete all as directed by Engineer-in-Charge. Range : 0-5 meters Accuracy : 0.5 % minimum Supply Voltage : 24V dc Output : 4-20 mA Ultrasonic Frequency:75 kHz burst, rep. rate 96 ms Delay at Power-up: 1.5 seconds
Temperature Effect: Uncompensated: 0.2% of distance/°C &Compensated: 0.02% of distance/°C Delay at Power-up: 1.5 seconds Resolution: 1.0 mm Output Response Time: 100 ms to 2300 ms Minimum Window Size: 20 mm Environmental Rating: Leak proof design is rated IEC IP67; NEMA 6P Operating Conditions: Temperature: –20 °C to 70 °C (–4 °F to 158 °F) Maximum relative humidity: 100%
Indicators Green Power On LED: Indicates power is ON Red Signal LED: Indicates target is within sensing range, and the condition of the received signal Teach/Output indicator (bicolor Amber/Red): Amber – Target is within taught limits; Flashing Amber – Target is outside taught window limits; Red – Sensor is in TEACH mode
Supply, installation, testing and commissioning of PLC based centralized SCADA system with the following hardware & software for process control, visualization and data acquisition as per specifications and as directed by the Engineer-in-charge. (A) 1 no. Engineering Development station of a dedicated PC with Intel Core i7 processor, 4GB RAM, 500GB HDD, Min 32xDVD Combo Drive, keyboard, Microsoft Mouse, 40" Flat Screen (TFT Monitor), PSTN Modem
(B) 600VA UPS (C) Unlimited tags SUPERVISORY CONTROL AND DATA AQUISITION (SCADA) software including programming library generation, soft keys etc. for graphical display of the automated water supply screen, as required by the Engineer in Charge SCADA software shall have multi level password protection, redundancy features etc. The work also includes Development of Web based application with user name and password facility so as to enable the user to access the engineering control station software using internet to remotely monitor and execute instructions using internet. The quoted rate shall include providing the wired broadband internet connection with static IP in the name of Garrison Engineer / Asst Garisson Engineer for period of work covered under Phase I.
Supply, Installation, Testing and Commissioning of Full Bore Electro magnetic Flow Meter with 4-20 mA output, convertor and digital display along with Flow totaliser suitable for Line size of 200mm dia. complete with following specification all as directed by Engineer-in-Charge. Flow Sensor:, Type: Pulse DC excitation, Electrode : SS 316/Ha-C,Electrode type: Round Head Electrodes Meter Tube: SS Liner: Hard Rubber, Accuracy : ±0.5 % of MV inclusive of linearity, Flow Transmitter / Converter :Type : Micro processor based & Modular,
Display language : English, Display Two line back lit LCD for indication of actual flow rate, forward, reverse & sum totalizer., Output : One current output (4 – 20 mA), Enclosure: Die cast Aluminium with polyurethane finish, Power Supply : 240 V AC, 50 Hz, The work includes modification of pipeline including for installation of flow meter such that the section of pipeline in which the flow meter is installed is always full. Note: The Flow meter shall be calibrated at FCRI or any Laboratory accredited by NABL
Supply installation testing and commissioning of PLC based Graphic Mimic Panel with appropriate number of inputs and outputs and 7'' Colour touch screen HMI with minimum 2 nos. serial ports and 1 no. USB port. The Panel shall be of suitable size, made out of Aluminium / CRCA sheet steel that shall clearly depict the entire layout of the water supply system. The same shall include pump status, valve status, level of tanks, etc. This shall be an online indication panel complete all as directed by Engineer-in-Charge.
Supplying and fixing on wall / drawing through existing pipe (if any ) 2 x 1.5 sq.mm. PVC insulated and PVC sheathed armoured copper cable with suitable size of saddles etc complete etc as required. (for solenoid valve) all as directed. Note: 2 runs of 1.5sqmm cable shall be measured as one unit
Supplying and fixing on wall / drawing through existing pipe (if any ) 4 x 1.5 sq.mm. PVC insulated and PVC sheathed armoured copper cable with suitable size of saddles etc complete etc as required. (for starter & ULS) all as directed. Note: 4 runs of 1.5sqmm cable shall be measured as one unit
Supplying and fixing on wall / drawing through existing pipe (if any ) 6 x 1.5 sq.mm. PVC insulated and PVC sheathed armoured copper cable with suitable size of saddles etc complete etc as required. (for Actuator) all as directed. Note: 6 runs of 1.5sqmm cable shall be measured as one unit
Supply and drawing through existing pipe/fixing on wall/surface/pipe 0.5sqmm, 5 pair, PVC insulated and PVC sheathed armoured communication cable with suitable size of saddles etc complete. (for magnetic sensor) all as directed. Note: 5 pairs of cable shall be measured as one unit
Supply, Jointing and laying in trenches/above ground level, in standard length, Mild steel Medium Grade (wall thickness 6mm) pipes, with one coat of primer & two coat of paint, a nominal diameter 150mm dia (bore), ISI marked, including welding, gas cutting, grinding, jointing etc & testing, complete all as specified and directed by EIC. Note for item No. 30 to 33 : MS specials/ fittings will be measured and paid separately under relevant items of Sch "A"
Supply, Jointing and laying in trenches/above ground level, in standard length, Mild steel Medium Grade (wall thickness 6mm) pipes, with one coat of primer & two coat of paint, a nominal diameter 200mm dia (bore), ISI marked, including welding, gas cutting, grinding, jointing etc & testing, complete all as specified and directed by EIC.
Supply, Jointing and laying in trenches/above ground level, in standard length, Mild steel Medium Grade (wall thickness 6mm) pipes, with one coat of primer & two coat of paint, a nominal diameter 100mm dia (bore), ISI marked, including welding, gas cutting, grinding, jointing etc & testing, complete all as specified and directed by EIC.
Supply, Jointing and laying in trenches/above ground level, in standard length, Mild steel Medium Grade (wall thickness 6mm) pipes, with one coat of primer & two coat of paint, a nominal diameter 80mm dia (bore), ISI marked, including welding, gas cutting, grinding, jointing etc & testing, complete all as specified and directed by EIC.
Material and labour for Mild Steel fittings such as bends, Tapers, Reducers, Enlargers, Tee pieces (Single and double branch) any type and angle / radius and straight connecting pieces, flanges up to 200 mm dia (bore) including welding , gas cutting, grinding etc with one coat of primer & two coat of paint for use in Header as per the site requirement directed by EIC.
Supply and fix 100mm bore galvanized iron tubes, medium grade, with all fittings, fixed to walls/ceiling all as specified and directed.
Supply and fix 80mm bore galvanized iron tubes, medium grade, with all fittings, fixed to walls/ceiling all as specified and directed.
Excavating in trenches n exc 1.5m wide and n exc 1.5m depth and getting out in hard/ dense soil for foundation / pipes, cables etc. all as specified and directed.
Returning filling in with approved excavated soil including spreading levelling, watering and well ramming in layers n. exc. 25 cm thick all as specified and directed.
Removing excavated soil to a distance n.exc 50 m and depositing where directed at a level n. exc. 1.5 m above the starting point in soil all as specified and directed.
Supply, lay in trenches burnt Bricks, old size, sub class "B" for cable protection all as specified and directed.
Material and Labour for dry river sand filling in trenches to required width at bottom and top of cable cushioning including cleaning, spreading, levelling, punning complete all as specified and as directed. Note : Punned thickness shall only be measured and paid..
Material and labour for mild steel fabricated from structural steel sections including welding, bending cold or hot, drilling holes for bolts/hinges in any shape or size as indicated or directed and inclusive of one primer coat one under coat and one finishing coat of paint etc complete all as specified and directed
Demolition of cement concrete (un-reinforced) of any description and in any position not otherwise specially provided complete removal of debris outside MD land all as specified and directed.
M&L for plain cement concrete type C1 1:3:6 using 20mm graded stone aggregate as in foundation / valve chamber filling , support of pipe laying and mass concrete all as specified and directed.
M&L for Brick work with sub class 'B' bricks, straight or curved on plan exc 6m mean radius built in cement mortar 1:4 complete all as directed.
M&L for rendering 10mm thick in cement mortar 1:3 on fair faces of brick work or concrete surfaces finished even and smooth without using extra cement complete all as specified and as directed.
OUTSOURCING OF SCADA DURING DEFECT LIABILITY PERIOD
Notes for srl item No. 47 to 62: The quoted rate shall be inclusive of following:- 1. The operation includes cost of communication, maintenance of GSM Sims required for the operation of SCADA systems etc 2. The technician /operators engaged should have experience in PLC based panel water supply management system 3. Establishing communication between the PLC based panels and the SCADA control center and shall submit a certificate daily accordingly.
4. The operation includes monitoring the breakdowns and preventive maintenance 5. The operator shall have required T&P to operate PLC based panel and master control station. 6. All spares required for smooth and efficient working of the system shall be replaced without any extra cost during defects liability period of 36 months 7. Servicing of all motorized valves once in every quarter (three months) including cleaning, greasing, checking for wear and tear, checking electrical termination etc as required. 8. Cleaning of all PLC based panels once in every six months including checking of electrical termination lugs etc as required.
9. Servicing of all pressure switches and solenoid valves once in every six months including cleaning, greasing, checking for wear and tear, checking electrical terminations, UPS, batteries etc 10. Cleaning of all analytical instruments viz Residual chlorine sensor, pH and turbidity sensors including checking of all electrical terminations as required 11. All the above checking activities shall be recorded in presence of Engineer-in-Charge as directed. The operator shall submit report in soft as well as hard copy in a format as prescribed by Engineer-in-Charge. 12. Maintaining of bearest minimum emergency spares in reserve for keeping the system operational.
13. The cost of all consumables required for SCADA communcation shall be included. 14. The complete cost of GPRS based communcation. Static IP and wired broad band charges 15.The Operator employed shall be skilled with ITI qualification in the Electronic Trade with minimum three years experience in the SCADA operation fields. 16. The contractor shall supply 2 sets of uniform dress with proper ID card showing the name of the operator and name of the firm to each operator. 17. The staff / operator deployed by the contractor shall be well behaved and polite. Any misbehaviour reported against any operator/staff shall be removed from the duty immediately , the reliver for the same should be arranged by the contractor with out any break in service.
18. The contractor shall be fully responsible for any accident or injury to any labour / operator while on work and for settlement of issue complete if any. 19. First Aid box kit shall be provided at work site. 20. The shift timings i.e per shift of 08 hrs shall be decided by Engineer-in-Charge. Duty roaster display board shall be provided at each SCADA station.
Outsourcing for operation and monitoring of SCADA control and supervsion system round the clock including holidays at Depot Bn Pump house (for master control station) complete with one trained technically qualified operator for each shift of 08 hours and carrying out daily, weekly, monthly, quarterly and half yearly maintanance all as directed by Engineer-in-Charge during defects liability period of first 11 months in first year after physical completion of work under Phase I and as specified.
Outsourcing for operation and monitoring, operation / resetting / fault correction as on required basis of hardwares consisting of PLC panel, centrifugal pumps, motorized butterfly valves, magnetic level sensors, ultra sonic level sensors, pressure transmitters, air release solenoid valves, residual chlorine sensors, PH and turbidity sensors etc (except SCADA control and supervision system as elaborted in srl item No. 47.00 above) round the clock including holidays complete with one trained technically qualified operator in each shift of 08 hours and carrying out daily, weekly, monthly, quarterly and half yearly maintanance all as directed by Engineer-in-Charge at Depot Bn pump House, Assaye Parade Pump house, OH tank feeding Assaye Parade Pump house and TB-I pump house. during defects liability period of first 11 months in first year after physical completion of work and as specified.
Outsourcing for operation and monitoring of SCADA control and supervsion system round the clock including holidays at Depot Bn Pump house (for master control station) complete with one trained technically qualified operator for each shift of 08 hours and carrying out daily, weekly, monthly, quarterly and half yearly maintanance all as directed by Engineer-in-Charge during defects liability period of remaining period of first year and 2nd year after physical completion of work under Phase I and as specified.
Outsourcing for operation and monitoring, operation / resetting / fault correction as on required basis of hardwares consisting of PLC panel, centrifugal pumps, motorized butterfly valves, magnetic level sensors, ultra sonic level sensors, pressure transmitters, air release solenoid valves, residual chlorine sensors, PH and turbidity sensors etc (except SCADA control and supervision system as elaborted in srl item No. 49.00 above) round the clock including holidays complete with one trained technically qualified operator in each shift of 08 hours and carrying out daily, weekly, monthly, quarterly and half yearly maintanance all as directed by Engineer-in-Charge at Depot Bn pump House, Assaye Parade Pump house, OH tank feeding Assaye Parade Pump house and TB-I pump house during defects liability period of remaining period of first year and 2nd year after physical completion of work and as specified.
Outsourcing for operation and monitoring of SCADA control and supervsion system round the clock including holidays at Depot Bn Pump house (for master control station) complete with one trained technically qualified operator for each shift of 08 hours and carrying out daily, weekly, monthly, quarterly and half yearly maintanance all as directed by Engineer-in-Charge during defects liability period of remaining period of second year and 3rd year after physical completion of work under Phase I and as specified.
Outsourcing for operation and monitoring, operation / resetting / fault correction as on required basis of hardwares consisting of PLC panel, centrifugal pumps, motorized butterfly valves, magnetic level sensors, ultra sonic level sensors, pressure transmitters, air release solenoid valves, residual chlorine sensors, PH and turbidity sensors etc (except SCADA control and supervision system as elaborted in srl item No. 51.00 above) round the clock including holidays complete with one trained technically qualified operator in each shift of 08 hours and carrying out daily, weekly, monthly, quarterly and half yearly maintanance all as directed by Engineer-in-Charge at Depot Bn pump House, Assaye Parade Pump house, OH tank feeding Assaye Parade Pump house and TB-I pump house during defects liability period of remaining period of 2nd year and 3rd year after physical completion of work and as specified.
Outsourcing for operation and monitoring of SCADA control and supervsion system round the clock including holidays at Depot Bn Pump house (for master control station) complete with one trained technically qualified operator for each shift of 08 hours and carrying out daily, weekly, monthly, quarterly and half yearly maintanance all as directed by Engineer-in-Charge during defects liability period of remaining period of 3rd year after physical completion of work under Phase I and as specified.
Outsourcing for operation and monitoring, operation / resetting / fault correction as on required basis of hardwares consisting of PLC panel, centrifugal pumps, motorized butterfly valves, magnetic level sensors, ultra sonic level sensors, pressure transmitters, air release solenoid valves, residual chlorine sensors, PH and turbidity sensors etc (except SCADA control and supervision system as elaborted in srl item No. 53.00 above) round the clock including holidays complete with one trained technically qualified operator in each shift of 08 hours and carrying out daily, weekly, monthly, quarterly and half yearly maintanance all as directed by Engineer-in-Charge at Depot Bn pump House, Assaye Parade Pump house, OH tank feeding Assaye Parade Pump house and TB-I pump house during defects liability period of remaining period of 3rd year after physical completion of work and as specified.
Outsourcing for operation and monitoring of SCADA control and supervsion system round the clock including holidays at HR Bk Pump house (for master control station) complete with one trained technically qualified operator for each shift of 08 hours and carrying out daily, weekly, monthly, quarterly and half yearly maintanance all as directed by Engineer-in-Charge during defects liability period of first 11 months in first year after physical completion of work under Phase I and as specified.
Outsourcing for operation and monitoring, operation / resetting / fault correction as on required basis of hardwares consisting of PLC panel, centrifugal pumps, motorized butterfly valves, magnetic level sensors, ultra sonic level sensors, pressure transmitters, air release solenoid valves, residual chlorine sensors, PH and turbidity sensors etc (except SCADA control and supervision system as elaborted in srl item No. 55.00 above) round the clock including holidays complete with one trained technically qualified operator in each shift of 08 hours and carrying out daily, weekly, monthly, quarterly and half yearly maintanance all as directed by Engineer-in-Charge at HR Bk OHT No.1 & 2, Harris Barrack Pump house, FMCC Pump house and GTE pump house during defects liability period of first 11 months in first year after physical completion of work and as specified.
Outsourcing for operation and monitoring of SCADA control and supervsion system round the clock including holidays at HR Bk Pump house (for master control station) complete with one trained technically qualified operator for each shift of 08 hours and carrying out daily, weekly, monthly, quarterly and half yearly maintanance all as directed by Engineer-in-Charge during defects liability period of remaining period of first year and 2nd year after physical completion of work under Phase I and as specified.
Outsourcing for operation and monitoring, operation / resetting / fault correction as on required basis of hardwares consisting of PLC panel, centrifugal pumps, motorized butterfly valves, magnetic level sensors, ultra sonic level sensors, pressure transmitters, air release solenoid valves, residual chlorine sensors, PH and turbidity sensors etc (except SCADA control and supervision system as elaborted in srl item No. 57.00 above) round the clock including holidays complete with one trained technically qualified operator in each shift of 08 hours and carrying out daily, weekly, monthly, quarterly and half yearly maintanance all as directed by Engineer-in-Charge at HR Bk OHT No.1 & 2, Harris Barrack Pump house, FMCC Pump house and GTE pump house during defects liability period of remaining period of first year and 2nd year after physical completion of work and as specified.
Outsourcing for operation and monitoring of SCADA control and supervsion system round the clock including holidays at HR Bk Pump house (for master control station) complete with one trained technically qualified operator for each shift of 08 hours and carrying out daily, weekly, monthly, quarterly and half yearly maintanance all as directed by Engineer-in-Charge during defects liability period of remaining period of remaining period of second year and 3rd year after physical completion of work under Phase I and as specified.
Outsourcing for operation and monitoring, operation / resetting / fault correction as on required basis of hardwares consisting of PLC panel, centrifugal pumps, motorized butterfly valves, magnetic level sensors, ultra sonic level sensors, pressure transmitters, air release solenoid valves, residual chlorine sensors, PH and turbidity sensors etc (except SCADA control and supervision system as elaborted in srl item No. 59.00 above) round the clock including holidays complete with one trained technically qualified operator in each shift of 08 hours and carrying out daily, weekly, monthly, quarterly and half yearly maintanance all as directed by Engineer-in-Charge at HR Bk OHT No.1 & 2, Harris Barrack Pump house, FMCC Pump house and GTE pump house during defects liability period of remaining period of second year and 3rd year after physical completion of work and as specified.
Outsourcing for operation and monitoring of SCADA control and supervsion system round the clock including holidays at HR Bk Pump house (for master control station) complete with one trained technically qualified operator for each shift of 08 hours and carrying out daily, weekly, monthly, quarterly and half yearly maintanance all as directed by Engineer-in-Charge during defects liability period of remaining period of remaining period of 3rd year after physical completion of work under Phase I and as specified.
Outsourcing for operation and monitoring, operation / resetting / fault correction as on required basis of hardwares consisting of PLC panel, centrifugal pumps, motorized butterfly valves, magnetic level sensors, ultra sonic level sensors, pressure transmitters, air release solenoid valves, residual chlorine sensors, PH and turbidity sensors etc (except SCADA control and supervision system as elaborted in srl item No. 61.00 above) round the clock including holidays complete with one trained technically qualified operator in each shift of 08 hours and carrying out daily, weekly, monthly, quarterly and half yearly maintanance all as directed by Engineer-in-Charge at HR Bk OHT No.1 & 2, Harris Barrack Pump house, FMCC Pump house and GTE pump house during defects liability period of remaining period of 3rd year after physical completion of work and as specified.
OUTSOURCING OF SCADA AFTER DEFECT LIABILITY PERIOD
Notes for srl item No. 63 to 74: The quoted rate shall be inclusive of following:- 1. The operation includes cost of communication, maintenance of GSM Sims required for the operation of SCADA systems etc 2. The technician /operators engaged should have experience in PLC based panel water supply management system 3. Establishing communication between the PLC based panels and the SCADA control center and shall submit a certificate daily accordingly.
4. The operation includes monitoring the breakdowns and preventive maintenance 5. The operator shall have required T&P to operate PLC based panel and master control station. 6. Cost of consumables like PLC panels, centrifugal pumps, motorized butterfly valves, magnetic level sensors, ultra sonic level sensors, pressure transmitters, air release solenoid valves, residual chlorine sensors,PH and turbity sensors and connecting cables etc required for smooth and efficient working of the system shall be included. 7. Servicing of all motorized valves once in every quarter (three months) including cleaning, greasing, checking for wear and tear, checking electrical termination etc as required. 8. Cleaning of all PLC based panels once in every six months including checking of electrical termination lugs etc as required.
9. Servicing of all pressure switches and solenoid valves once in every six months including cleaning, greasing, checking for wear and tear, checking electrical terminations, UPS, batteries etc 10. Cleaning of all analytical instruments viz Residual chlorine sensor, pH and turbidity sensors including checking of all electrical terminations as required 11. All the above checking activities shall be recorded in presence of Engineer-in-Charge as directed. The operator shall submit report in soft as well as hard copy in a format as prescribed by Engineer-in-Charge. 12. Maintaining of bearest minimum emergency spares in reserve for keeping the system operational.
13. The complete cost of GPRS based communcation. Static IP and wired broad band charges 14.The Operator employed shall be skilled with ITI qualification in the Electronic Trade with minimum three years experience in the SCADA operation fields. 15. The contractor shall supply 2 sets of uniform dress with proper ID card showing the name of the operator and name of the firm to each operator. 16. The staff / operator deployed by the contractor shall be well behaved and polite. Any misbehaviour reported against any operator/staff shall be removed from the duty immediately , the reliver for the same should be arranged by the contractor with out any break in service.
17. The contractor shall be fully responsible for any accident or injury to any labour / operator while on work and for settlement of issue complete if any. 18. First Aid box kit shall be provided at work site. 19.. The shift timings i.e per shift of 08 hrs shall be decided by Engineer-in-Charge. Duty roaster display board shall be provided at each SCADA station.
Outsourcing for operation and monitoring of SCADA control and supervsion system round the clock including holidays at Depot Bn Pump house (for master control station) complete with one trained technically qualified operator for each shift of 08 hours and carrying out daily, weekly, monthly, quarterly and half yearly maintanance all as directed by Engineer-in-Charge for first 11 months after expiry of defects liability period in first year and as specified.
Outsourcing for operation and monitoring, operation / resetting / fault correction as on required basis of hardwares consisting of PLC panel, centrifugal pumps, motorized butterfly valves, magnetic level sensors, ultra sonic level sensors, pressure transmitters, air release solenoid valves, residual chlorine sensors, PH and turbidity sensors etc (except SCADA control and supervision system as elaborted in srl item No. 63.00 above) round the clock including holidays complete with one trained technically qualified operator in each shift of 08 hours and carrying out daily, weekly, monthly, quarterly and half yearly maintanance all as directed by Engineer-in-Charge at Depot Bn pump House, Assaye Parade Pump house, OH tank feeding Assaye Parade Pump house and TB-I pump house for first 11 months after expiry of defects liability period in first year and as specified.
Outsourcing for operation and monitoring of SCADA control and supervsion system round the clock including holidays at Depot Bn Pump house (for master control station) complete with one trained technically qualified operator for each shift of 08 hours and carrying out daily, weekly, monthly, quarterly and half yearly maintanance all as directed by Engineer-in-Charge for remaining period of first year and 2nd year after expiry of dfects liability period and as specified.
Outsourcing for operation and monitoring, operation / resetting / fault correction as on required basis of hardwares consisting of PLC panel, centrifugal pumps, motorized butterfly valves, magnetic level sensors, ultra sonic level sensors, pressure transmitters, air release solenoid valves, residual chlorine sensors, PH and turbidity sensors etc (except SCADA control and supervision system as elaborted in srl item No. 65.00 above) round the clock including holidays complete with one trained technically qualified operator in each shift of 08 hours and carrying out daily, weekly, monthly, quarterly and half yearly maintanance all as directed by Engineer-in-Charge at Depot Bn pump House, Assaye Parade Pump house, OH tank feeding Assaye Parade Pump house and TB-I pump house for remaining period of first year and 2nd year after expiry of dfects liability period and as specified..
Outsourcing for operation and monitoring of SCADA control and supervsion system round the clock including holidays at Depot Bn Pump house (for master control station) complete with one trained technically qualified operator for each shift of 08 hours and carrying out daily, weekly, monthly, quarterly and half yearly maintanance all as directed by Engineer-in-Charge for remaining period of second year after expiry defects liability period and as specified.
Outsourcing for operation and monitoring, operation / resetting / fault correction as on required basis of hardwares consisting of PLC panel, centrifugal pumps, motorized butterfly valves, magnetic level sensors, ultra sonic level sensors, pressure transmitters, air release solenoid valves, residual chlorine sensors, PH and turbidity sensors etc (except SCADA control and supervision system as elaborted in srl item No. 67.00 above) round the clock including holidays complete with one trained technically qualified operator in each shift of 08 hours and carrying out daily, weekly, monthly, quarterly and half yearly maintanance all as directed by Engineer-in-Charge at Depot Bn pump House, Assaye Parade Pump house, OH tank feeding Assaye Parade Pump house and TB-I pump house for remaining period of second year after expiry defects liability period and as specified.
Outsourcing for operation and monitoring of SCADA control and supervision system round the clock including holidays at HR Bk Pump house (for master control station) complete with one trained technically qualified operator for each shift of 08 hours and carrying out daily, weekly, monthly, quarterly and half yearly maintanance all as directed by Engineer-in-Charge for first 11 months after expiry of defects liability period in first year and as specified.
Outsourcing for operation and monitoring, operation / resetting / fault correction as on required basis of hardwares consisting of PLC panel, centrifugal pumps, motorized butterfly valves, magnetic level sensors, ultra sonic level sensors, pressure transmitters, air release solenoid valves, residual chlorine sensors, PH and turbidity sensors etc (except SCADA control and supervision system as elaborted in srl item No. 69.00 above) round the clock including holidays complete with one trained technically qualified operator in each shift of 08 hours and carrying out daily, weekly, monthly, quarterly and half yearly maintanance all as directed by Engineer-in-Charge at HR Bk OHT No.1 & 2, Harris Barrack Pump house, FMCC Pump house and GTE pump house for first 11 months after expiry of defects liability period in first year and as specified.
Outsourcing for operation and monitoring of SCADA control and supervsion system round the clock including holidays at HR Bk Pump house (for master control station) complete with one trained technically qualified operator for each shift of 08 hours and carrying out daily, weekly, monthly, quarterly and half yearly maintanance all as directed by Engineer-in-Charge for remaining period of first year and 2nd year after expiry of dfects liability period and as specified.
Outsourcing for operation and monitoring, operation / resetting / fault correction as on required basis of hardwares consisting of PLC panel, centrifugal pumps, motorized butterfly valves, magnetic level sensors, ultra sonic level sensors, pressure transmitters, air release solenoid valves, residual chlorine sensors, PH and turbidity sensors etc (except SCADA control and supervision system as elaborted in srl item No. 71.00 above) round the clock including holidays complete with one trained technically qualified operator in each shift of 08 hours and carrying out daily, weekly, monthly, quarterly and half yearly maintanance all as directed by Engineer-in-Charge at HR Bk OHT No.1 & 2, Harris Barrack Pump house, FMCC Pump house and GTE pump house for remaining period of first year and 2nd year after expiry of dfects liability period and as specified.
Outsourcing for operation and monitoring of SCADA control and supervsion system round the clock including holidays at HR Bk Pump house (for master control station) complete with one trained technically qualified operator for each shift of 08 hours and carrying out daily, weekly, monthly, quarterly and half yearly maintanance all as directed by Engineer-in-Charge for remaining period of second year after expiry defects liability period and as specified.
Outsourcing for operation and monitoring, operation / resetting / fault correction as on required basis of hardwares consisting of PLC panel, centrifugal pumps, motorized butterfly valves, magnetic level sensors, ultra sonic level sensors, pressure transmitters, air release solenoid valves, residual chlorine sensors, PH and turbidity sensors etc (except SCADA control and supervision system as elaborted in srl item No. 73.00 above) round the clock including holidays complete with one trained technically qualified operator in each shift of 08 hours and carrying out daily, weekly, monthly, quarterly and half yearly maintanance all as directed by Engineer-in-Charge at HR Bk OHT No.1 & 2, Harris Barrack Pump house, FMCC Pump house and GTE pump house for remaining period of second year after expiry defects liability period and as specified..
NISH TECHNO PROJECTS PVT. LTD.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .