Tender Value
₹3.3 Cr
EMD Value
₹6.5 L
Closing Date
4 Aug 2026, 1:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
Above/Below/Par
TRD SECTIO
15 conditions · 3 needing a document upload
Clause Regarding GST: (a) All the Bidders/tenderers should ensure that they are GST Compliant and their quoted tax Structure are as per GST LAW.(b) Tenderer Should Furnish their GSTIN numbers representing the States in Which they are registered GST, along with address of Registered Office.(c)The Contract is under GST Act and rules as applicable time to time.
Financial Eligibility Criteria: The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N=Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB(Annexure-IX in Annexure section), along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
41 conditions
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Annexures :- Tenderers are requested to go through the annexures in Document section and submit the same duly filled up and signed as per Tender document.
TRD Work in connection with realignment of Curve nos. 165, 168, 170, 182, 186, 187, 188, 199, 205, 208, 215 and 216 in NLP-SPTR Section under Tinsukia Division
LV-T-14-TSK-TRD-18~NFR
LV-T-14-TSK-TRD-18
Open
Works - General
12 Months
Tinsukia, Assam
₹0
₹6.5 L
4 Aug 2026
13 Jul 2026
21 Jul 2026
136 items across 2 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 2,92,95,219.56 | ||
| — | 6.10 | — | — | ||
| Preparation and submission of designs and drawings for Overhead Equipment, Layout Plan & CSD. | — | — | — | 56,168.13 | |
| — | 10.00 | — | — | ||
| Supply of materials for termination of double overhead equipment conductor (excluding 9 Tonne insulator) | — | — | — | 87,831.8 | |
| — | 10.00 | — | — | ||
| Erection of materials for termination of double overhead equipment conductor (excluding 9 Tonne insulator) | — | — | — | 10,974.9 | |
| — | 8.00 | — | — | ||
| Supply of materials for termination of single overhead equipment conductor (excluding 9 Tonne insulator) | — | — | — | 40,662.88 | |
| — | 8.00 | — | — | ||
| Erection of materials for termination of single overhead equipment conductor (excluding 9 Tonne insulator) | — | — | — | 8,623.12 | |
| — | 14.00 | — | — | ||
| Supply of Porcelain type 9 tonne insulator | — | — | — | 80,125.08 | |
| — | 14.00 | — | — | ||
| Erection of 9 Tonne insulator | — | — | — | 18,101.86 | |
| — | 440.00 | — | — | ||
| Providing and Laying of Concrete for foundation and plinth in all types of Soils and Soft Rock using M10 grade concrete for main foundation and M-15 grade concrete for grouting and muffing including nominal reinformcement wherever required as per RDSO drawings | — | — | — | 44,46,508 | |
| — | 58.65 | — | — | ||
| Supply of all Rolled/Fabricated mast, portal & TTC for OHE | — | — | — | 73,95,813.09 | |
| — | 58.65 | — | — | ||
| Erection of all Rolled/Fabricated mast, portal & TTC for OHE | — | — | — | 6,04,628.13 | |
| — | 5.00 | — | — | ||
| Supply of Fabricated steel work, DA, SPS etc. | — | — | — | 6,93,007.05 | |
| — | 5.00 | — | — | ||
| Erection of Fabricated steel work, DA, SPS etc. | — | — | — | 60,129.4 | |
| — | 70.00 | — | — | ||
| Supply of Longitudinal bond (including black painted MS Flat and required nut, bolts spring washer) | — | — | — | 41,232.8 | |
| — | 70.00 | — | — | ||
| Erection of Longitudinal bond (including black painted MS Flat and required nut, bolts spring washer) | — | — | — | 33,610.5 | |
| — | 141.00 | — | — | ||
| Supply of Structure bond (including black painted MS Flat and required nut, bolts spring washer | — | — | — | 1,34,715.63 | |
| — | 141.00 | — | — | ||
| Erection of Structure bond (including black painted MS Flat and required nut, bolts spring washer | — | — | — | 58,795.59 | |
| — | 60.00 | — | — | ||
| Supply of cross/tranverse bond and special bond(including black painted MS Flat and required nut,bolts, spring washer) | — | — | — | 56,590.8 | |
| — | 60.00 | — | — | ||
| Erection of cross/tranverse bond and special bond (including black painted MS Flat and required nut,bolts, spring washer) | — | — | — | 35,376 | |
| — | 156.00 | — | — | ||
| Supply of single bracket assembly with accessories and stay & bracket insulator Porcelain type | — | — | — | 48,46,478.52 | |
| — | 156.00 | — | — | ||
| Erection of single bracket assembly with accessories and stay & bracket insulator Porcelain type | — | — | — | 4,16,566.8 | |
| — | 18.00 | — | — | ||
| Supply of a guy rod assembly | — | — | — | 1,99,216.62 | |
| — | 18.00 | — | — | ||
| Erection of a guy rod assembly | — | — | — | 33,825.06 | |
| — | 10.00 | — | — | ||
| Supply of regulating equipment ( 3 pulley type) with counter weight assembly for conventional OHE. | — | — | — | 7,25,084.6 | |
| — | 10.00 | — | — | ||
| Erection o f regulating equipment ( 3 pulley type) with counter weight assembly for conventional OHE. | — | — | — | 56,275.3 | |
| — | 8.00 | — | — | ||
| Supply of anti creep with Cadmium copper catenary wire (Excluding 9 Tonne insulator) | — | — | — | 98,327.28 | |
| — | 8.00 | — | — | ||
| Erection of anti creep with Cadmium copper catenary wire (Excluding 9 Tonne insulator) | — | — | — | 16,619.92 | |
| — | 3.00 | — | — | ||
| Supply of contact wire | — | — | — | 38,12,555.73 | |
| — | 2.10 | — | — | ||
| Supply of cadmium copper catenary wire | — | — | — | 27,93,453.26 | |
| — | 6.10 | — | — | ||
| Supply and Erection of Over Head Equipment i.e. contact & catenary wire (excluding cost of supply of contact & catenary wires), jumper wire, dropper wire, contact/catenary clips, fasteners and all other material required at turn out/overlaps/diamond crossings etc. Final checking of OHE and adjustment, inspection to be done by tower wagon for commissioning of conventional OHE. | — | — | — | 4,36,216.61 | |
| — | 141.00 | — | — | ||
| Supply of Retro-reflective structure number plate | — | — | — | 1,38,751.05 | |
| — | 141.00 | — | — | ||
| Erection of Retro-reflective structure number plate | — | — | — | 23,821.95 | |
| — | 141.00 | Each Span | — | ||
| Transfer of equipment from one mast or support to another | — | — | — | 3,89,403.93 | |
| — | 13.00 | Each Span | — | ||
| Splicing & extention of an anchored overhead equipment | — | — | — | 45,098.95 | |
| — | 4.31 | — | — | ||
| Dismantling of OHE | — | — | — | 92,117.07 | |
| — | 141.00 | — | — | ||
| Dismatling of OHE Mast/structure by cutting from ground level | — | — | — | 8,56,889.43 | |
| — | 156.00 | — | — | ||
| Dismatling of Cantilever Assembly / OHE support | — | — | — | 1,76,933.64 | |
| — | 18.00 | — | — | ||
| Dismantling of Guy Rod assembly | — | — | — | 16,005.6 | |
| — | 1.00 | — | — | ||
| Dismantling of termination fittings | — | — | — | 600.54 | |
| — | 141.00 | — | — | ||
| Dismantling of number plate / caution board with clamp | — | — | — | 7,207.92 | |
| — | 14.00 | — | — | ||
| Dismantling of 9-tonne insulator | — | — | — | 8,372.7 | |
| — | 12.00 | — | — | ||
| Dismantling of jumpers | — | — | — | 4,272.84 | |
| — | 8.00 | — | — | ||
| Dismantling of anti-creep | — | — | — | 34,736.48 | |
| — | 5.00 | — | — | ||
| Dismantling of SPS | — | — | — | 26,146.7 | |
| — | 10.00 | — | — | ||
| Dismantling of Regulating equipment | — | — | — | 58,536.7 | |
| — | 20.00 | — | — | ||
| Transportation of Mast/materials | — | — | — | 1,18,809.6 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Tenderdocument_RealignmentofcurveNLP-SPTR.pdf
ATTACHMENT
Annexures.pdf
ATTACHMENT
GCC-2022-ACS10_merged_compressed.pdf
ATTACHMENT
GCCACS11_compressed.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .