Loading…
Loading…
Tender Value
₹5.1 L
EMD Value
₹12,800
Closing Date
16 May 2026, 9:30 pmClosed
Karnataka Forest Department
ACF AYANUR
Advance work at Bommanahalli Sy.No.15 -5Ha, Bommanahalli Sy.No.18-5Ha -in Mandagadde Range during 2026-27 under CAMPA, Extent 10.00 Ha
KFD/2026-27/OW/WORK_INDENT39111
KFD/2026-27/OW/WORK_INDENT39111
Reserved
Other Works
Two Tender Document System(Two Cover)
KFD ACF Territorial Sub Division Office Ayanur
4 documents required · 0 mandatory · 4 optional
Upload all documents as per tender documents
₹500
₹12,800
8 May 2026
8 May 2026
18 May 2026
13 May 2026
NAME OF THE WORK Range Extent Unit Cost ESTIMATED VALUE REMARKS EMD
50 HA Maintenance of 2nd year old Plantations at Gejjenahalli Sy.No. 80-25 HA and Devakathikoppa Sy.No. 45-25 HA-in Shankar Range during 2026-27 under CAMPA-NPV Shankar 50.00 9975.00 498750.00 Spill over works 12469
40 HA Maintenance of 2nd year old Plantations at Gundichatnahalli Block I-20 Ha and Gundichatnahalli Block II Sy.No.39- 20Ha-in Ayanuru Range during 2026-27 under CAMPA- 06 Others Ayanur 40.00 16433.00 657320.00 Spill over works 8217
40 HA Maintenance of 2nd year old Plantations at Masarur, Aluvalli Sy.No.88,15 and Basavapura Sy.No.30 -in Rippepnpete Range during 2026-27 under CAMPA- 06 Others Ripponpet 40.00 16433.00 657320.00 Spill over works 16433
40 HA Maintenance of 2nd year old Plantations at Venkanahalli Sy.No.18 - Jambuvalli Sy.No.13 in Mandagadde Range during 2026-27 under CAMPA- 06 Others Mandagadde 40.00 16433.00 657320.00 Spill over works 16433
40 HA Maintenance of 2nd year old Plantations at Triyambakapura Sy.No.165 ,-15 Ha,Sirupathi Sy.No.3-10 Ha , Kulur Sy.No.17,18 - 06 HA & Haralimata Sy.No.115-9Ha -in Thirthahalli Range during 2026-27 under CAMPA- 06 Others Thirthahalli 40.00 16433.00 657320.00 Spill over works 8217
40 HA Maintenance of 2nd year old Plantations at Kunda Sy.No.13,49 - 20 HA and Talluru Sy.No.246- 20Ha -in Agumbe Range during 2026-27 under CAMPA- 06 Others Agumbe 40.00 16433.00 657320.00 Spill over works 16433
40 HA Maintenance of 3rd year old Plantations at Kumsi Sy.No.204 -20 Ha and Chikamarasa Block-1 Sy.No.46-20Ha -in Ayanuru Range during 2026-27 under CAMPA- 06 Others Ayanur 40.00 16433.00 657320.00 Spill over works 8217
50 HA Maintenance of 3rd year old Plantations at Suduru Sy.No.10-25 Ha -and Thorebylu Sy.No.52,36 -25 in Rippenpete Range during 2026-27 under CAMPA- 06 Others Ripponpet 50.00 16433.00 821650.00 Spill over works 10271
55 HA Maintenance of 3rd year old Plantations at Venkanahalli Jogikoppa Sy.No.18,9 -30 Ha, and Lingapura Sy.No.27,28,29 -25 Ha in Mandagadde Range during 2026-27 under CAMPA- 06 Others Mandagadde 55.00 16433.00 903815.00 Spill over works 11298
15 HA Maintenance of 3rd year old Plantations at Honnekeri Sy.No.74,76 - in Thirthahalli Range during 2026-27 under CAMPA- 06 Others Thirthahalli 15.00 16433.00 246495.00 Spill over works 6162
50 Ha HA Maintenance of 3rd year old Plantations at Kolagibylu Sy.No.19 -25 Ha, Talluru Sy.No.18 -15 Ha and Holaluru-Betageri Chikkalur Sy.No.53,56,89-10 Ha - in Agumbe Range during 2026-27 under CAMPA- 06 Others Agumbe 50.00 13146.40 657320.00 Spill over works 16433
75 HA Maintenance of 4th year old Plantations at Gundichatanahalli, Block-1 Sy.No.39,66 -25 Ha, Gundichatanahalli, Block-2 Sy.No.39,66-25 Ha and Chikkamarasa Sy.No.46 -25 Ha- in Ayanuru Range during 2026-27 under CAMPA- 06 Others Ayanur 75.00 12663.00 949725.00 Spill over works 23743
50 HA Maintenance of 4th year old Plantations at Thorebailu+Alur+Kumdvathi extn Block Sy.No.52,36,59,4 -25 Ha, and Balur Navatoor Sy.No.14,55 -25 Ha - in Rippenpete Range during 2026-27 under CAMPA- 06 Others Ripponpet 50.00 12663.00 633150.00 Spill over works 15829
50 HA Maintenance of 4th year old Plantations at Garaga Block-1 Sy.No.13-25 Ha - Garaga Block-2 Sy.No.13-25 Ha in Mandagadde Range during 2026-27 under CAMPA- 06 Others Mandagadde 50.00 12663.00 633150.00 Spill over works 15829
25 HA Maintenance of 4th year old Plantations at Hallusale Biluve Hariharapura Sy.No.12,53,61 - in Thirthahalli Range during 2026-27 under CAMPA- 06 Others Thirthahalli 25.00 12663.00 316575.00 Spill over works 7914
8.00 HA Maintenance of 1st year old Plantations at Bommanahalli Sy.No. 40-7.30 Ha, Kanagalakoppa Sy.No. 55- 0.50 Ha, and Lingapura Sy.No.131-0.20 HA-in Mandagadde Range during 2026-27 under CAMPA- CA Mandagadde 8.00 51450.00 411600.00 Spill over works 10290
85 HA Maintenance of 1st year old Plantations at Kunchenahalli Beeranakere Sy.No.80,25-25 Ha, Basavapura & EchavadiBlock - I Sy.No.2 & 16 -25 HA, Beeranakere & Kunchenahalli Sy.No.25,80 -25 Ha and Basavapura & Echavadi Block - II Sy.No.2,16 --15 Ha -in Shankar Range during 2026-27 under CAMPA- 06 Others Shankar 85.00 17955.00 1526175.00 Spill over works 38154
90 HA Maintenance of 1st year old Plantations at Chikkamarasa Sy.No.46-20HA, Vitagondanakoppa and Kesuvinakatte Sy.No.28,29 & 36,37-25 HA, Sooragondanakoppa Sy.No.65 &66-25 HA , Kumsi SF Kumsi Sy.No.204- 20Ha and -in Ayanur Range during 2026-27 under CAMPA- 06 Others Ayanur 90.00 17955.00 1615950.00 Spill over works 40399
20 HA Maintenance of 1st year old Plantations at Aluru, Torebylu Sy.No.48,59,54 -in Rippenpete Range during 2026-27 under CAMPA- 06 Others Ripponpet 20.00 17955.00 359100.00 Spill over works
20 HA Maintenance of 1st year old Plantations at Hegalatthi and Kegadi village Sy.No.47,10,35 -in Mandagadde Range during 2026-27 under CAMPA- 06 Others Mandagadde 20.00 17955.00 359100.00 Spill over works 8978
25 HA Maintenance of 1st year old Plantations at Kesluru Sy.No.146 -10 Ha, Koranakote Sy.No.93 -10 Ha and Huruli , Shuntihaklu Sy.No.7&4, 2&3 -5 Ha in Agumbe Range during 2026-27 under CAMPA- 06 Others Agumbe 25.00 17955.00 448875.00 Spill over works 11222
10 HA Maintenance of 1st year old Plantations at Hallusale , Virupapura Sy.No.12,14 - in Thirthahalli Range during 2026-27 under CAMPA- 06 Others Thirthahalli 10.00 17955.00 179550.00 Spill over works 4489
9.463 HA Maintenance of 1st year old Plantations at Devabalu (Against CA land ) Sy.No.39 - in Shankar Range during 2026-27 under CAMPA- CA Shankar 9.46 51450.00 486871.00 Spill over works 12172
18.08 HA Maintenance of 1st year old Plantations at Mandagatta. (Against CA land ) Sy.No.81 - in Rippenpete Range during 2026-27 under CAMPA- CA Ripponpet 18.08 20580.00 372086.00 Spill over works 9302
15 HA Raising of Plantations at Neralamane, Tenkebylu Sy.No.2,34 in Thirthahalli Range during 2026-27 under CAMPA- 06 Others Thirthahalli 15.00 30082.00 451230.00 Spill over works 11281
10 HA Raising of Plantations at Mutthuvalli Sy.No.77 in Agumbe Range during 2026-27 under CAMPA- 06 Others Agumbe 10.00 30082.00 300820.00 Spill over works 3760
10 HA Advance work at Kudumallige Sy.No.112 -5 HA and- Ingladi Sy.No.18 - 5 Ha in Thirthahalli Range during 2026-27 under CAMPA Thirthahalli 10.00 53000.00 530000.00 Fresh Works 6625
10 HA Advance work at Bommanahalli Sy.No.15 -5Ha, Bommanahalli Sy.No.18-5Ha -in Mandagadde Range during 2026-27 under CAMPA Mandagadde 10.00 51200.00 512000.00 Fresh Works 12800
5 HA Advance work at Ingladi Sy.No.18 -in Thirthahalli Range during 2026-27 under CAMPA Thirthahalli 5.00 51200.00 256000.00 Fresh Works 6400
30 HA Advance work at Chakkodabylu Sy.No.198 -5Ha,- Kesluru Sy.No.146-5Ha, Hosalli Sy.No.31 -5HA, Hosalli Sy.No.64-5 Ha, Lakkunda Sy.No.59 -5Ha, Megaravalli Sy.No.105 -5Ha in Agumbe Range during 2026-27 under CAMPA Agumbe 30.00 51200.00 1536000.00 Fresh Works 38400
District Bagalkote Belagavi Ballari Bengaluru_Rural Bengaluru_Urban Bidar Chamarajanagara Chikkaballapura Chikkmagaluru Chitradurga Dakshina_Kannada Davanagere Dharwad Gadag Kalaburagi Hassan Haveri Kodagu Kolar Koppala Mandya Mysuru Raichuru Ramanagara Shivamogga Tumakuru Udupi Uttara_Kannada Vijayapura Vijayanagara Yadgir
Taluk Names Bagalkote Belagavi Ballari Nelamangala Bengaluru North Aurad Chamarajanagara Chikkaballapura Chikkamagaluru Chitradurga Mangaluru Davanagere Kalghatgi Gadag Kalaburagi Hassan Ranibennur Madikeri Kolar Koppala Mandya Mysuru Raichuru Ramanagara Shivamogga Tumakuru Udupi Karwara Vijayapura Hosapete Yadagiri
Jamkhandi Athani Kurugodu Doddaballapura Bengaluru South Basavakalyana Gundlupete Bagepalli Kaduru Challakere Ullal Harihara Dharwad Naragunda Afzalpura Arasikere Byadgi Somawarapete Bangarapete Gangavathi Madduru Hunasuru Sindhanuru Magadi Sagara Chikkanayakanahalli Kapu Sirsi Indi Hagaribommanahalli Shahapura
Mudhol Bailhongal Kampli Devanahalli Bengaluru East Bhalki Kollegala Chintamani Koppa Hiriyur Mulki Channagiri Hubballi Rural Mundaragi Alanda Channarayapattana Hangala Virajapete Maluru Kushtagi Malavalli Krishnarajanagara Manvi Kanakapura Bhadravathi Kunigal Bynduru Joida Basavana Bagewadi Harapanahalli Surapura
Badami Chikodi Sanduru Hosakote Anekal Bidar Yelanduru Gauribidanuru Mudigere Holalkere Moodbidri Honnali Hubballi Urban Rona Chincholi Holenarsipura Haveri Ponnammapete Mulabagilu Yelaburga Srirangapattana Nanjanagodu Devadurga Channapattana Hosanagara Madhugiri Karkala Dandeli Sindgi Hoovina Hadagali Gurmitkala
Bilagi Gokak Siruguppa Yelahanka Chitgoppa Hanuru Gudibanda Narasimharajapura Hosadurga Bantwala Nyamathi Kundagolu Gajendragada Chitapura Sakleshpura Savanuru Kushalnagara Srinivasapura Kanakagiri Krishnarajapete Heggadadevanakote Lingasaguru Harohalli Shikaripura Sira Kundapura Bhatkal Muddebihala Kudligi Vadagera
Hungunda Khanapura Hulsuru Sidlaghatta Sringeri Molakalmuru Belathangadi Jagaluru Navalgunda Lakshmeshwara Jevargi Aluru Hirekeruru Kolar Gold Fields Robertsonpete Karatagi Nagamangala Piriyapattana Mudgal Soraba Tipturu Hebri Kumta Talikote Kotturu Hunsagi
Ilkal Mudalgi Humnabad Cheluru Tarikere Putturu Alnavara Shirahatti Sedam Arakalagudu Shiggavi Kukanuru Pandavapura Tirumakudalu Narasipura Maski Tirthahalli Gubbi Brahmavara Ankola Devara Hipparagi
Rabkavi Banhatti Nippani Kamalanagara Ajjampura Sulya Annigeri Kamalapura Beluru Rattihalli Saraguru Sirawara Koratagere Haliyal Chadchana
Guledgudda Rayabaga Kalasa Kadaba Shahabad Saligrama Pavagada Honnavara Tikote
Savadatti Kalgi Turuvekere Mundagodu Babaleshwara
Ramadurga Yedrami Siddapura Kolhara
Kagawada Yellapura Nidagundi
Hukkeri Alamela
MODEL -2 - ANR FOR MALNAD, COASTAL AND TRANSITIONAL ZONES
DATASHEET NO. 25 - ADVANCE WORK DURING 2026-27 (WITH FENCING)
No. of Plants - 400 seedlings 8"x12" Size, pits - 0.60 x 0.60 x0.60 cum Extent : 1 Ha
No. of PBS - 400 + 40 = 440. Espacement: 5m x5m
Sl. No. CSSR Item NO. Particulars of the Work Qnty. Rate Per Amount
1 100(a) Survey and demarcation of Plantation boundary lines after clearing the rank growth to a width of 2 m. in the areas with thick under growth 72 Rmtrs 3,904.09 Km 281.09 25 400
2 Sub Estimate BARBED WIRE FENCING WITH WOODEN POLES 12,300.00
3 29 (b) Aligning in the planting area and marking for pit (without staking) (Aligning of pit in Stagerred design) 400 Pits 580.08 1000 232.03
4 29 (c) (ii) Excavation of pits of size 0.6 Mtr. x 0.6 Mtr. x 0.6 Mtr. with vertically cut edges to make an uniform cube and heaping the excavated soil (1/3rd top soil on the upper side & 2/3rd on the lower side) in Hard Soil. (400 pits x 0.60 cum 1 pit = 86.40 cum) 86.40 Cum. 307.85 1 26,598.24 86.4
5 Sub Estimate Cost of Raising 8" x 12" PB seedling, including 10% Casuality Replacement 440 Seedl. 26.634 1 11,718.96
6 LS / RQ Miscellaneous & rounding off 69.674
Total 51,200.000
Note : Item of Works can be modified by the DCF based on the field requirement with the concurrence of CCFs with in same cost norm.
Principal Chief Conservator of Forests,
(Head of Forest Force), Bengaluru.
MODEL -3 - ANR MODEL FOR DRY ZONES
DATASHEET NO. 29 ADVANCE WORKS(WITH FENCING) DURING 2026-27
No. of Plants - 278 seedlings 10"x16" Size, pits - 0.75 x 0.75 x0.75 cum
No. of PBS - 278 + 28 =306 Espacement: 6m x 6m Extent: 1 Ha.
Sl. No. CSSR Item NO. Particulars of work Qty. Rate Per Amount
1 100(b) Survey and demarcation of Plantation boundary lines after clearing the rank growth to a width of 2 m. in the areas with sparse under growth. 72 Rmtrs. 1,542.78 Km 111.08 36
2 38(i) Excavation of pits by mechanical means of size by 0.75m x 0.75m x 0.75m with vertically cut edges to make a uniform cube and heaping the excavated soil (1/3rd top soil on the upper side & 2/3rd on the lower side) in Ordinary soil (278 pit) 117.28 Pits 155.91 Cum 18,285.32 117.28125 277.777777777778
3 Sub Estimate BARBED WIRE FENCING WITH WOODEN POLES 1 Ha 1 12,300.00
4 Sub Estimate Cost of 10"x16" HDPE woven sacks seedlings raising, including 10% Casuality Replacement 306 Seedl. 61.326 1 18,765.76
5 LS SMC works @ 7% of advance work 1 ha 3,462.35 1 3,462.35
6 LS / RQ Miscellaneous & rounding off. 75.494
Note : 1. Item of Works can be modified by the DCF based on the field requirement with the concurrence of CCFs with in same cost norm.
2. Sl. No. 5 - The SMC works shall be taken up based on the soil conditions, runoff, slope.
Principal Chief Conservator of Forests,
(Head of Forest Force), Bengaluru.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
Ranomization Copy Campa.pdf
Tender Document • 5.32 MB
Annexure-1 Final.xlsx
Tender Document • 0.02 MB
51200.xlsx
Tender Document • 0.02 MB
Tender Notification Below 5 L_260508_113009.pdf
Tender Document • 1.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .