Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-AOC | ₹1.7 Cr | L1 | Accepted-AOC Work order Allotted |
| 2 | L1₹1.7 CrRejected-Finance | ₹1.7 Cr | L1 | Rejected-Finance work allotted to another bidder |
| 3 | L1₹1.7 CrRejected-Finance | ₹1.7 Cr | L1 | Rejected-Finance work allotted to another bidder |
| 4 | L1₹1.7 CrRejected-Finance | ₹1.7 Cr | L1 | Rejected-Finance work allotted to another bidder |
| 5 | L1₹1.7 CrRejected-Finance | ₹1.7 Cr | L1 | Rejected-Finance work allotted to another bidder |
Tender Value
₹1.8 Cr
EMD Value
₹3.7 L
Closing Date
21 Feb 2023, 12:00 pmClosed
CHD, Irrigation, BTC
CHD, Irrigation, BTC, Kokrajhar
Ahopa FIS Ph II under PMKSY-HKKP for the year 2021-22
2023_BoTC_29046_12
CHDI/ET/2022-23/8
Open Tender
Civil Works
Works
365 days
Barama
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,700
₹3.7 L
Yes
3 Jun 2023
30 Jan 2023
21 Feb 2023
30 Jan 2023
21 Feb 2023
1 Feb 2023
Amount
Construction of Main Canal from Ch 0 m to 670 m
Earth work in excavation in foundation of canal structure in all type of soil as per design & drawing including dressing the foundation, shoring etc. removing the surplus spoils by head load to a safe distance from the working place & depositing the required soils in uniform layers, dressing, watering & breaking clods not more than 10 mm. cube with compensation complete as directed at site (including bailing out stagnant rain water where necessary). A. In all types of soils (except soil mixed with gravel & boulders) (i) For normal lead of 30.0 m and lift of 1.5 m
Collection and supply of sand mixed gravel contains 40% of sand and 60% of river gravel of size 13 mm to 38 mm free from all foreign materials including carriage from quarry to the work site loading, unloading and stacking in measurable stacks as directed by the department (Including paying of forest royalty and sales tax etc.) Distance of work site from quarry @ 25 Km
Labour charge for spreading of hard river gravel/broken stone/sandgravel mixture of size of gravel 13 mm to 38 mm to the required thickness including ramming and dressing the seat before laying the materials as directed complete including all carriage etc.
Cement Concrete work in proportion 1: 2: 4 with aggregate of size 6mm to 20 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed. (Without shuttering) (Temporary arrangement for obtaining clear water should be made at site.) A)River Shingles (ii)With shuttering & without Dewatering
Supplying, fitting, fixing and laying in position M.S. rod/ Torsteel/ TMT bars of all sizes as per design and drawing as required including cutting, bending, cranking with necessary lappage and tying with black wire complete as directed.
Cement Concrete work in proportion 1: 1 ½: 3 with aggregate of size 6 mm to 20 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed. (Temporary arrangement for obtaining clear water should be made at site.) A) River Singles (ii)With shuttering & without Dewatering
Earth work in back filling of structure with earth obtaining from outside borrow pits, filling with 15cm layer ramming, dressing and compaction and watering including paying compensation of land, if any with lead up to 30m and lift 1.50m complete as directed.
Construction of Earthen Main canal from Ch 670 m to 830 m
Earth work in excavation in irrigation canal to the design section and grade by depositing the spoils in the form of embankment in 15cm layers on both the banks as necessary including clearing light jungles, removing trees up to 15cm, uprooting roots, stumps from the seat of embankment and canal bed and free from all vegetation including breaking clods not more than 10mm cube ramming, dressing and roughening the seat of embankment with lead up to 30m and lift up to 1.5m complete as directed. (A) In ordinary Soil
Earthwork in all soils in canal embankment & bed filling as per designed section and grade by truck carriage for a minimum distance of 4 KM including paying compensation of earth obtained from private, if any loading, unloading and stacking at not more than 1.00 M height and spreading the same in embankment in layers not exceeding 15 cm thick including clearing light jungles, removing trees upto 15 cm dia & uprooting roots & stumps etc. from the seat of embankment, breaking clods to not more than 10 mm cube, ramming, dressing, roughening the seat of embankment, profiling etc. with all lead and lift complete as directed.
Construction of Branch canal ( BC 1 )
Item No1/ 15 ( A):- Earth work in excavation in irrigation canal to the design section and grade by depositing the spoils in the form of embankment in 15cm layers on both the banks as necessary including clearing light jungles, removing trees up to 15cm, uprooting roots, stumps from the seat of embankment and canal bed and free from all vegetation including breaking clods not more than 10mm cube ramming, dressing and roughening the seat of embankment with lead up to 30m and lift up to 1.5m complete as directed.
Item No 2 / 20: Earthwork in all soils in canal embankment & bed filling as per designed section and grade by truck carriage for a minimum distance of 4 KM including paying compensation of earth obtained from private, if any loading, unloading and stacking at not more than 1.00 M height and spreading the same in embankment in layers not exceeding 15 cm thick including clearing light jungles, removing trees upto 15 cm dia & uprooting roots & stumps etc. from the seat of embankment, breaking clods to not more than 10 mm cube, ramming, dressing, roughening the seat of embankment, profiling etc. with all lead and lift complete as directed.
Construction of RCC Branch Canal (B.C- 2) from ch 0 m to100 m
Earth work in excavation in foundation of canal structure in all type of soil as per design & drawing including dressing the foundation, shoring etc. removing the surplus spoils by head load to a safe distance from the working place & depositing the required soils in uniform layers, dressing, watering & breaking clods not more than 10 mm. cube with compensation complete as directed at site (including bailing out stagnant rain water where necessary). A. In all types of soils (except soil mixed with gravel & boulders) (i) For normal lead of 30.0 m and lift of 1.5 m
Collection and supply of sand mixed gravel contains 40% of sand and 60% of river gravel of size 13 mm to 38 mm free from all foreign materials including carriage from quarry to the work site loading, unloading and stacking in measurable stacks as directed by the department (Including paying of forest royalty and sales tax etc.) Distance of work site from quarry @ 25 Km
Labour charge for spreading of hard river gravel/broken stone/sandgravel mixture of size of gravel 13 mm to 38 mm to the required thickness including ramming and dressing the seat before laying the materials as directed complete including all carriage etc.
Cement Concrete work in proportion 1: 2: 4 with aggregate of size 6mm to 20 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed. (Without shuttering) (Temporary arrangement for obtaining clear water should be made at site.)A)River Shingles (ii)With shuttering & without Dewatering
Supplying, fitting, fixing and laying in position M.S. rod/ Torsteel/ TMT bars of all sizes as per design and drawing as required including cutting, bending, cranking with necessary lappage and tying with black wire complete as directed.
Cement Concrete work in proportion 1: 1 ½: 3 with aggregate of size 6 mm to 20 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed. (Temporary arrangement for obtaining clear water should be made at site.) A) River Singles (ii)With shuttering & without Dewatering
Earth work in back filling of structure with earth obtaining from outside borrow pits, filling with 15cm layer ramming, dressing and compaction and watering including paying compensation of land, if any with lead up to 30m and lift 1.50m complete as directed.
Construction of Branch canal ( BC 2) from Ch-100 m to 400 m
Item No1/ 15 ( A):- Earth work in excavation in irrigation canal to the design section and grade by depositing the spoils in the form of embankment in 15cm layers on both the banks as necessary including clearing light jungles, removing trees up to 15cm, uprooting roots, stumps from the seat of embankment and canal bed and free from all vegetation including breaking clods not more than 10mm cube ramming, dressing and roughening the seat of embankment with lead up to 30m and lift up to 1.5m complete as directed.
Item No 2 / 20: Earthwork in all soils in canal embankment & bed filling as per designed section and grade by truck carriage for a minimum distance of 4 KM including paying compensation of earth obtained from private, if any loading, unloading and stacking at not more than 1.00 M height and spreading the same in embankment in layers not exceeding 15 cm thick including clearing light jungles, removing trees upto 15 cm dia & uprooting roots & stumps etc. from the seat of embankment, breaking clods to not more than 10 mm cube, ramming, dressing, roughening the seat of embankment, profiling etc. with all lead and lift complete as directed.
Construction of Branch canal ( BC 3)
Item No1/ 15 ( A):- Earth work in excavation in irrigation canal to the design section and grade by depositing the spoils in the form of embankment in 15cm layers on both the banks as necessary including clearing light jungles, removing trees up to 15cm, uprooting roots, stumps from the seat of embankment and canal bed and free from all vegetation including breaking clods not more than 10mm cube ramming, dressing and roughening the seat of embankment with lead up to 30m and lift up to 1.5m complete as directed.
Item No 2 / 20: Earthwork in all soils in canal embankment & bed filling as per designed section and grade by truck carriage for a minimum distance of 4 KM including paying compensation of earth obtained from private, if any loading, unloading and stacking at not more than 1.00 M height and spreading the same in embankment in layers not exceeding 15 cm thick including clearing light jungles, removing trees upto 15 cm dia & uprooting roots & stumps etc. from the seat of embankment, breaking clods to not more than 10 mm cube, ramming, dressing, roughening the seat of embankment, profiling etc. with all lead and lift complete as directed.
Construction of Distribution Chamber
[§ Item No.: 21 (A)] Earth work in excavation in foundation of canal structure in all type of soil as per design & drawing including dressing the foundation, shoring etc. removing the surplus spoils by head load to a safe distance from the working place & depositing the required soils in uniform layers, dressing, watering & breaking clods not more than 10 mm. cube with compensation complete as directed at site (including bailing out stagnant rain water where necessary).
[§ Item No.: 10 ] Collection and supply of sand mixed gravel contains 40% of sand and 60% of river gravel of size 13 mm to 38 mm free from all foreign materials including carriage from quarry to the work site loading, unloading and stacking in measurable stacks as directed by the department (Including paying of forest royalty and sales tax etc.) Distance of work site from quarry @ 25 Km
[§ Item No.: 28] Labour charge for spreading of hard river gravel/broken stone/sandgravel mixture of size of gravel 13 mm to 38 mm to the required thickness including ramming and dressing the seat before laying the materials as directed complete including all carriage etc.
[§ Item No.: 56 ] Cement Concrete work in proportion 1: 2: 4 with aggregate of size 6mm to 20 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed. (Without shuttering) (Temporary arrangement for obtaining clear water should be made at site.)
[§ Item No.: 65 ]Supplying, fitting, fixing and laying in position M.S. rod/ Torsteel/ TMT bars of all sizes as per design and drawing as required including cutting, bending, cranking with necessary lappage and tying with black wire complete as directed.
[§ Item No.:63]:- Cement Concrete work in proportion 1: 1 ½: 3 with aggregate of size 6 mm to 20 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed. (Without shuttering) (Temporary arrangement for obtaining clear water should be made at site.) A) River Singles (ii)With shuttering & without Dewatering
[§ Item No.: 128]Supplying, fitting, fixing of steel gate of cross & Head Regulator as per design & drawing & specification including supplying of steel beams, channel section, Rubber seal etc including all materials embedded partly where necessary & manually operated chorister equip mints including carriage of all materials to work site complete.
[§ Item No.: 6.14] Earth work in back filling of structure obtained from outside borrow pits filling in 15cm layers, ramming, dressing, watering including paying compensation of land if any (with lead upto 30.0 m and lift 1.50m).
Construction of Canal outlet
Earth work in excavation in foundation of canal structure in all types of soils as per design and drawing including dressing the foundation, shoring etc. removing the surplus spoils by head load to a safe distance from the working place and depositing required spoils in uniform layers dressing, watering, breaking clods not more than 10mm cube with compensation etc. complete as directed. (Including bailing out stagnant rain water where necessary). All types of soils except soil mixed with gravel and boulders. (For normal lead of 30 m and lift of 1.5 m)
Cement Concrete work in proportion 1: 4: 8 with aggregate of size 13 mm to 38 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed. (Without shuttering) (Temporary arrangement for obtaining clear water should be made at site.) A) River Singles (ii)With shuttering & without Dewatering
Cement Concrete work in proportion 1: 3: 6 with aggregate of size 13mm to 38 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed. (Without shuttering) (Temporary arrangement for obtaining clear water should be made at site.) A) River Singles (ii)With shuttering & without Dewatering
Supplying, fitting, fixing, PVC pipes (IS 12818, 6 kg/cm2) with relevant cement, leveling, testing leakages etc, complete as directed. (Cost of E/W foundation trenches will be paid separately) (ii) For 160 mm dia
12mm thick cement plastering including clearing surfaces and curing etc. complete as directed. (i) In Proportion 1:3
Earth work in back filling of structure with earth obtaining from outside borrow pits, filling with 15cm layer ramming, dressing and compaction and watering including paying compensation of land, if any with lead up to 30m and lift 1.50m complete as directed.
Construction of Cross Drainage system
Earth work in excavation in foundation of canal structure in all types of soils as per design and drawing including dressing the foundation, shoring etc. removing the surplus spoils by head load to a safe distance from the working place and depositing required spoils in uniform layers dressing, watering, breaking clods not more than 10mm cube with compensation etc. complete as directed. (Including bailing out stagnant rain water where necessary). A) All types of soils except soil mixed with gravel and boulders. (For normal lead of 30 m and lift of 1.5 m)
Cement Concrete work in proportion 1: 2: 4 with aggregate of size 6mm to 20 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed. (Without shuttering) (Temporary arrangement for obtaining clear water should be made at site.) A) River Singles (ii)With shuttering & without Dewatering
Supplying of R.C.C spun pipes of different dia including loading, unloading and stacking etc. up to the departmental go-down complete as directed.
Labour for laying in position of R.C.C. HP/ Spun Pipe and fixing in position with necessary collar with local carriage etc. complete as directed. A. 450 mm dia
Carriage of a Spun Pipe/ Hume Pipe from retail outlet to work site including loading, unloading as directed. (A) Above 0.90M to 1.20 M dia (2.44 M) long
Earth work in back filling of structure with earth obtaining from outside borrow pits, filling with 15cm layer ramming, dressing and compaction and watering including paying compensation of land, if any with lead up to 30m and lift 1.50m complete as directed.
Detailed Estimate for Cattle Cart Crossing above Earthen Canal
Supplying, fitting, fixing and laying in position M.S. rod/ Torsteel/ TMT bars of all sizes as per design and drawing as required including cutting, bending, cranking with necessary lappage and tying with black wire complete as directed.
Cement Concrete work in proportion 1: 1 ½: 3 with aggregate of size 6 mm to 20 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed. (Temporary arrangement for obtaining clear water should be made at site.) A) River Singles (ii)With shuttering & without Dewatering
Detailed Estimate for Cattle Cart Crossing above RCC Canal
Supplying, fitting, fixing and laying in position M.S. rod/ Torsteel/ TMT bars of all sizes as per design and drawing as required including cutting, bending, cranking with necessary lappage and tying with black wire complete as directed.
Cement Concrete work in proportion 1: 1 ½: 3 with aggregate of size 6 mm to 20 mm free from dust and dirt and other foreign materials including roding (vibrating), bailing out wate where necessary and carrying with supplying all materials complete as directed. (Temporary arrangement for obtaining clear water should be made at site.) A) River Singles (ii)With shuttering & without Dewatering
Repairing of regulator gate
Supply, fitting, fixing of best quality moulded 'J' type rubber seal as per IS : 11855 : 1986 of following sizes duly bolted to the shutter as per in line hole sizes of shutter with the help of MS flat of 25 mm X 6 mm size. (b) 125 mm …..
Supply, fitting, fixing of guide roller bracket made from 10 mm MS plate to the holding plate in the shutter as per prevailing status with the help of conforming to drill hole for 13 mm bolts in tight fit as per dwawing & as per desired
Supply, fitting, fixing of IS210 grade Fb 260 CI guide roller of length 90 mm with collar section of 90 mm Ø X 20 mm and concentric cylindrical tapered shank size of 60 mm Ø X 70 mm along with central longitudinal drilled hole of 13 mm to existing roller bracket by means of roller pin of accurate size with pushfit as directed.
Supply, fabrication of bottom seal channel at crest level of the weir conforming to ISMC 150 with necessary anchoring with MS rod and CC embedment (M15) as desired. The job includes dismantling/cutting/cleaning of all materials, of all sizes and grades, prior to the job and subsequent curing and removal of all forms from the site directed by the deptt.
Supply, fitting , fixing of square base plate of size 600 mm X 600 mm X 10 mm with a central circular hole, on the cross channels of the plateform assembly as directed for erecting the tool post and distribution of exial load.
Supply & providing lock plate 200 mm X 200 mm X 6 mm in two halves with semi circular inner cutting projecting into the circular grooves of the CI boss and locking them with the help of separator assembly onto the bearing plate as directed with locking MS strip on the top for (i) 50 mm dia screw shaft
Providing steel wire rope of 16 mm Ø, cross lay, as per IS 2266 : 2002 passing over the double pulleys for hanging counter weight with the help of suitable hanger & galvanized 'U' bolt of required sizes at one end fastening the other end at the shutter hook as directed with proper static balancing of the system.
Providing CC counter weight with handle of approx. 2 X 50 Kg on the specified MS hanger and properly tagged as directed.
BIRENDRA BRAHMA
Sanjib Kr. Das
BIKASH TALUKDAR
M/S B.K.ASSOCIATES
SRI MANABENDRA DAS
Dhriti Sankar Das
MD JAYNUR ALI
SRI DHIREN SINGHA
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .