Loading…
Loading…
| # | Company | Offered Item | Rank |
|---|---|---|---|
| 1 | Not yet disclosed by govt. L1 Item Categories: Twill Weave Cotton Fabrics Cloth Cotton Drill as per IS 177:1989 | Item Categories: Twill Weave Cotton Fabrics Cloth Cotton Drill as per IS 177:1989 | L1 |
Tender Value
Refer Docs
EMD Value
₹12,660
Closing Date
21 Aug 2025, 11:00 amClosed
Twill Weave Cotton Fabrics Cloth Cotton Drill as per IS 177:1989 (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance
Certificate (Requested in ATC)
OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1
-- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6505292 Dated : 31-07-2025 Bid Document 1/9 Past Performance 30 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 12660 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption
must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category
only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b).
EMD & Performance securityshould be in favour of Beneficiary
wherever it is applicable. Beneficiary : PFA NWR Jaipur North Western Railway
Indian Railways
North Western Railway
Ministry of Railways (Pfa/jaipur) UIN Number NCTGC2415P 2/9 Splitting
8148926
GEM/2025/B/6505292
Single Packet Bid
Twill Weave Cotton Fabrics Cloth Cotton Drill as per IS 177:1989 (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance
60 days
Meena305001Diesel, Loco and Wagon Workshop, NWR
Total value wise evaluation
PRODUCT
3 documents required · 3 mandatory
30%
₹12,660
21 Aug 2025
31 Jul 2025
21 Aug 2025
Twill Weave Cotton Fabrics Cloth Cotton Drill as per IS 177:1989 (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance
Certificate (Requested in ATC)
OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1
-- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6505292 Dated : 31-07-2025 Bid Document 1/9 Past Performance 30 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 12660 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption
must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category
only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b).
EMD & Performance securityshould be in favour of Beneficiary
wherever it is applicable. Beneficiary : PFA NWR Jaipur North Western Railway
Indian Railways
North Western Railway
Ministry of Railways (Pfa/jaipur) UIN Number NCTGC2415P 2/9 Splitting
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_8148926.pdf
GEM_BID
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .