Tender Value
₹1.4 Cr
Closing Date
7 Sept 2026, 2:00 pm
President of Procurement Committee
Karmveer Dada Patil Vividh Karyakari Sahakari Seva Sanatha Maryadit Taklikhandeshwari Tal. Krajat Dist. Ahilyanagar
Construction of Warehouse (1000 MT) and Machinery Shed (180 Sq.Mt.)
2026_DOAWB_1303296_2
Smart/Work/52/2026
Open Tender
Civil Works
Item Rate
Taklikhandeshwari, Karjat
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
Exempted
6 Aug 2026
6 Aug 2026
8 Sept 2026
6 Aug 2026
7 Sept 2026
6 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Constructions Of Warehouse 1000MT | - | - | - | - |
| 2 | Removing grass, gazer grass and disposing off out of building premises including making clean the ground by shovel and phavaras etc. complete. | 547.22 | Square Metre | - | - |
| 3 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting, dewatering etc. complete. (Lift upto 1.5 m.) by Mechanical Means. | 128.69 | Cubic Metre | - | - |
| 4 | Excavation for foundation in earth, soils of all types, sand,gravel and soft murum, including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting, dewatering etc. complete. (Lift from 1.5m to 3.0 m) by Mechanical Means.. | 1 | Cubic Metre | - | - |
| 5 | Excavation for foundation in hard murum including removing the excavated material upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting, dewatering etc. complete. (Lift upto 1.50 m) by Mechanical Means.. | 42.88 | Cubic Metre | - | - |
| 6 | Excavation for foundation in Hard murum including removing the excavated material upto a distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting, dewatering etc. complete. (Lift from 1.5 to 3.0 metre) by Mechanical Means. | 21.43 | Cubic Metre | - | - |
| 7 | Excavation for foundation in hard murum and boulders including removing the excavated material up to a distance 50 metres, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting, dewatering etc. complete. (Lift upto 1.5 m) by Mechanical Means. | 1 | Cubic Metre | - | - |
| 8 | Excavation for foundation in Hard murum and boulders including removing the excavated material upto a distance of 50 metres, beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting, dewatering etc. complete. (Lift from 1.5 m to 3.0 m) by Mechanical Means. | 10.71 | Cubic Metre | - | - |
| 9 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth /murum, ramming, watering including shoring and strutting, dewatering etc. complete (lift upto 1.5 m) by Mechanical Means. | 1 | Cubic Metre | - | - |
| 10 | Excavation for foundation in Soft rock and old cement or lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth/murum, ramming ,watering including shoring and strutting, dewatering etc. complete. (Lift from 1.5m To 3.0 m) by Mechanical Means. | 1 | Cubic Metre | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.83 MB
NCPkarm.pdf
Tender Documents • 0.82 MB
BOQ_2269716.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].