Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹33.0 LAccepted-Finance GATE NO 3 DIBRUGARH NEAR LANCO POWER PLANT ANPARA SONEBHADRA | ANPARA | SONEBHADRA | UTTAR PRADESH | ₹33.0 L | 1 | Accepted-Finance L-1 selected due lowest bid submission |
| 2 | 2₹34.6 L+₹1.6 L (4.98%)Rejected-Finance | ₹34.6 L+₹1.6 L (4.98%) | 2 | Rejected-Finance 2nd higher than L-1 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Bid rejected due to not having similar work experience as per PQC details in annexureA |
| 4 | Rejected-Technical MYOREPUR ANPARA ANPARA ANPARA SONBHADRA UTTAR PRADESH 231225 | SONBHADRA | UTTAR PRADESH | 231225 | - | - | Rejected-Technical Bid rejected as shortfall document was not submitted |
| 5 | Rejected-Technical | - | - | Rejected-Technical Bid rejected due to not having similar work experience as per PQC details in annexureA |
Tender Value
₹30.9 L
EMD Value
₹62,000
Closing Date
31 Aug 2022, 5:00 pmClosed
SE O and MC-III, 3X210 MW ATPS
Office SE O and MC-III, 3X210 MW ATPS
Round the clock operation and maintenance of Permanent Station Lighting System,underground cable laying,motor maintenace work, dry type transformer maintenace work,0.4KV switchgear maintenance work
2022_RVUNL_716323_1
04/CIMD-I/ATPS/2022-23
Open Tender
Electrical Works
Fixed-rate
365 days
anpara thermal power plant
as per tender document
3 documents required · 3 mandatory
₹590
Dy CAO CFA and BO ATPS Anpara
₹62,000
13 Jan 2023
21 Jul 2022
2 Sept 2022
21 Jul 2022
31 Aug 2022
21 Jul 2022
Amount
PART-A
Identification of the burnt cable per meter
Power cable up to size 200 mm and above
Control cable up to size of 70 Sq.mm and more than 100 mtrs. (cable length)
Compensating cable upto size of 70 mm and more than 100 mtrs (cable length)
Laying per meter
Power cable upto size 200 mm and above
Control cable up to size of 70 Sq.mm and more than 100 mtrs. (cable length)
Compensating cable upto size of 70 mm and more than 100 mtrs (cable length)
Termination per No.
Power cable, size:1X120
Power cable, size:1X95
Control cable up to size of 70 Sq.mm and more than 100 mtrs. (cable length)
Compensating cable upto size of 70 mm and more than 100 mtrs (cable length)
Straight jointing per No.
Power cable, size:1X120
Power cable, size:1X95
Control cable up to size of 70 Sq.mm and more than 100 mtrs. (cable length)
Compensating cable upto size of 70 mm and more than 100 mtrs (cable length)
Replacement of deteriorated M.S. Trays.
Replacement of deteriorated cable rakes.
Erection of junction boxes.
Provision of riser, reducer, Elbow etc.
Removal, re -fixing of tray covers in Boiler area.
Removal and re-fixing of chequer plates or grid on Boiler floor for attending cable fault on beneath the racks.
Part B Job- A: Motors pertaining to Central A.C. Plant of 3x210 M. W., A. T.P.S., Anpara.
Rate for rewinding of 3 ф Induction Motors 3 KW to below 4 KW
Rate for rewinding of 3 ф Induction Motors 5 KW to below 7 KW
Rate for rewinding of 3 ф Induction Motors 7 KW to below 10 KW
Rate for rewinding of 3 ф Induction Motors 10 KW to below 15 KW
Rate for rewinding of 3 ф Induction Motors 15 KW to below 20 KW
Rate for rewinding of 3 ф Induction Motors 20 KW to below 25 KW
Rate for rewinding of 3 ф Induction Motors 50 KW to below 70 KW
Rate for rewinding of 3 ф Induction Motors 70 KW to below 80 KW
Rate for rewinding of 3 ф Induction Motors 110 KW
Rate for overhauling of 3 ф Induction Motors 3 KW to below 4 KW
Rate for overhauling of 3 ф Induction Motors 5 KW to below 7 KW
Rate for overhauling of 3 ф Induction Motors 7 KW to below 10 KW
Rate for overhauling of 3 ф Induction Motors 10 KW to below 15 KW
Rate for overhauling of 3 ф Induction Motors 15 KW to below 20 KW
Rate for overhauling of 3 ф Induction Motors 20 KW to below 25 KW
Rate for overhauling of 3 ф Induction Motors 50 KW to below 70 KW
Rate for overhauling of 3 ф Induction Motors 70 KW to below 80 KW
Rate for overhauling of 3 ф Induction Motors 110 KW
Rate for painting of 3 ф Induction Motors 3 KW to below 4 KW
Rate for painting of 3 ф Induction Motors 5 KW to below 7 KW
Rate for painting of 3 ф Induction Motors 7 KW to below 10 KW
Rate for painting of 3 ф Induction Motors 10 KW to below 15 KW
Rate for painting of 3 ф Induction Motors 15 KW to below 20 KW
Rate for painting of 3 ф Induction Motors 20 KW to below 25 KW
Rate for painting of 3 ф Induction Motors 50 KW to below 70 KW
Rate for painting of 3 ф Induction Motors 70 KW to below 80 KW
Rate for painting of 3 ф Induction Motors 110 KW
Rate for replacement of terminal block of 3 ф Induction Motors 3 KW to below 4 KW
Rate for replacement of terminal block of 3 ф Induction Motors 5 KW to below 7 KW
Rate for replacement of terminal block of 3 ф Induction Motors 7 KW to below 10 KW
Rate for replacement of terminal block of 3 ф Induction Motors 10 KW to below 15 KW
Rate for replacement of terminal block of 3 ф Induction Motors 15 KW to below 20 KW
Rate for replacement of terminal block of 3 ф Induction Motors 20 KW to below 25 KW
Rate for replacement of terminal block of 3 ф Induction Motors 50 KW to below 70 KW
Rate for replacement of terminal block of 3 ф Induction Motors 70 KW to below 80 KW
Rate for replacement of terminal block of 3 ф Induction Motors 110 KW
Rate for terminal lead repairing of 3 ф Induction Motors 3 KW to below 4 KW
Rate for terminal lead repairing of 3 ф Induction Motors 5 KW to below 7 KW
Rate for terminal lead repairing of 3 ф Induction Motors 7 KW to below 10 KW
Rate for terminal lead repairing of 3 ф Induction Motors 10 KW to below 15 KW
Rate for terminal lead repairing of 3 ф Induction Motors 15 KW to below 20 KW
Rate for terminal lead repairing of 3 ф Induction Motors 20 KW to below 25 KW
Rate for terminal lead repairing of 3 ф Induction Motors 50 KW to below 70 KW
Rate for terminal lead repairing of 3 ф Induction Motors 70 KW to below 80 KW
Rate for terminal lead repairingof 3 ф Induction Motors 110 KW
Job-B: Motors pertaining to A.T.R.S. of 3 x 210 M. W., A. T.P.S., Anpara
Rate for rewinding of 3 ф Induction Motors 80 W to below 01KW
Rate for rewinding of 3 ф Induction Motors 1KW to below 02KW
Rate for rewinding of 3 ф Induction Motors 2 KW to below 03 KW
Rate for rewinding of 3 ф Inductin Brake motor, up to 0.16 KW
Rate for overhauling of 3 ф Induction Motors 80 W to below 01KW
Rate for overhauling of 3 ф Induction Motors 1KW to below 02KW
Rate for overhauling of 3 ф Induction Motors 2 KW to below 03 KW
Rate for overhauling of 3 ф Inductin Brake motor, up to 0.16 KW
Rate for replacement of gear pinion of 3 ф Induction Motors 80 W to below 01KW
Rate for replacement of gear pinion of 3 ф Induction Motors 1KW to below 02KW
Rate for replacement of gear pinion of 3 ф Induction Motors 2 KW to below 03 KW
Rate for replacement of gear pinion of 3 ф Inductin Brake motor, up to 0.16 KW
Rate for replacement of terminal block of 3 ф Induction Motors 80 W to below 01KW
Rate for replacement of terminal block of 3 ф Induction Motors 1KW to below 02KW
Rate for replacement of terminal block of 3 ф Induction Motors 2 KW to below 03 KW
Rate for replacement of terminal block of 3 ф Inductin Brake motor, up to 0.16 KW
Rate for replacement of terminal lead of 3 ф Induction Motors 80 W to below 01KW
Rate for replacement of terminal lead of 3 ф Induction Motors 1KW to below 02KW
Rate for replacement of terminal lead of 3 ф Induction Motors 2 KW to below 03 KW
Rate for replacement of terminal lead of 3 ф Inductin Brake motor, up to 0.16 KW
PART-C
Break down maintenance due to fire or flashover on any portion of the bus bar of 0.4 KV systems including reassembling of the section and re-commissioning after achieving I.R. values.
Break down maintenance of L&T/EE/GE make breakers of 0.4 KV system including replacement of damaged / defective parts.
Break down maintenance of 0.4 KV motor feeder modules including fault finding of control circuit & replacement of damaged / defective parts like contractors/ EMRs/ Switches /Fuse carriers etc. and tightness of cable termination at MCC and motor both the end.
Break down maintenance of 0.4 KV modules other than motor feeders including replacement of damaged/defective parts like switches/fuse carriers etc.
Replacement of protection relays / bus CT/ Bus PT etc. including rectification of the fault of associated circuit.
Checking & replacement of damaged heaters, its control circuit parts & re-commissioning of compressors.
Break down maintenance of control circuit panel of Condenser and chiller pump’s motors including fault finding of control circuit, replacement of defective parts & set right the local as well as remote operation.
Repair / replacement of defective switches such as local / remote, trip / close auto / manual etc. of Bus Bar cubicle or panels.
Break down maintenance of star delta starter & TPN switches of 40 KW to below110 KW motors in Air Conditioning plant .
Checking &replacement of defective parts of disconnecting switches (knife switches) such as ferrules / connectors / insulators / Lugs etc.
Daily Upkeeping of electrical parts of central ac plant comprises of UCB,MCB, Service house Building, ESP control Rooms
PART-D,JOB-A
Round the clock operation & maintenance of Permanent Station lighting System of UCB-1,2 &3, T.G. Hall Area, Boiler House Area including I.D./F.D./P.A. Fan Area, ESP Area including their control rooms, DG Set Room, Compressor House, Transformer Yard, Ash Water Pump House, Service House Building, M.CC. Rooms, Switch Gear Rooms, Battery Rooms, (-4) M & (+) 5.5 M Level Cable Gallery, D.M. Plant, C.W. Pump House, Aux. Pump House, Filtration Plant, P.T. Plant, Magazine Post, Fire Pump House, Mechanical Workshop, Vehicle Base, Store Yard & its Sheds, ‘A’ T.P.S. Canteen, Junior Engineer’s & Operator’s Cabins and Site Offices, Street Light, Tower Light (Excluding Those Installed in Switch Yard & in C.H.P. areas), C.M.R. System, Loading / Unloading Site, Street Light in M.G.R. Workshop area, internal telephone exchange pertaining to ‘A’ T.P.S., Anpara.
Bush cutting/cleaning around the lighting installations of permanent station lighting system such as L.D.B.s, J.B.s, Street light poles, over head L.T. lines installed at different locations, as mentioned above, of ‘A’ T.P.S., Anpara.
Cutting / trimming of tree branches around the lighting installations of permanent station lighting system such as L.D.B.s, J.B.s, Street light poles, over head L.T. lines installed at different locations of ‘A’ T.P.S., Anpara.
Removal of old burnt / damaged cables & wires of conduit wiring from conduit and re wiring of different size cables/ wires in conduit including re fixing of conduit, wherever it is hanging, at -4.0 M, 0.0 M, 3.5M and 5.5 M elevation of T.G hall area.
Removal of old burnt/ damaged cable & wires of conduit wiring from conduit at different elevation of boiler house/TG hall and rewiring of different size cable/ wires in conduit as per site requirement including re-fixing of conduits wherever it is hanging.
Repairing of ladder associated in lighting system
Installation of new light fittings. of different wattage
Installation of new / replacement of damaged welding branch board/ main switch carrier.
Installation of new electrical points
PART-D,JOB-B
Fault finding and its rectification in existing underground cables by digging of cable trench, laying of new cable, if required, to replace the damage one and refilling and levelling of trench after fault rectification, as per site requirement of permanent station lighting system of ‘A’ T.P.S, Anpara.
Work of laying or removal of overhead lighting cable: -
Up to 50 mm square.
Above from 50mm sq to 300 mm square
Work of Jointing of Cable through cable jointing Kit of different size: -
Size: 2.5 mm square x 6 Core
Size: 6 mm square x 5 Core
Size: 70 mm square x 3.5 Core
Size:120mm x3.5Core
Bush cleaning in 02 m wide area along the cable route.
Work of supply, installation and commissioning of 8”X10”X4” size distribution box on street light poles.
Work of Casting of street light pole RCC plinth.
Work of repairing of damaged round poles of streetlight.
Work of dismantling and removal of street light pole.
Work of complete installation of light pole with fixing of one number of HPSV/HPMV/LED lamp fitting, distribution box fuse unit and GI Pipe of 35 mm. size.
PART-D,JOB-B
Complete Repairing/Rewinding related maintenance works of panel mounted air cooled, dry type,50 KVA&75KVA Isolation Lighting Transformer installed at various locations in Permanent Station lighting System.
Complete rewinding of damaged / burnt panel mounted air cooled, dry type, 3 phase, 75 KVA Isolation Transformer having Voltage Ratio 415 V / 433 V, insulation class ‘B’, Primary side tapping +/- 2.5 %, Secondary side tapping +/- 5.0 %, Off Circuit copper link type connection.
Replacement of Bakelite sheet in 60 cm x 25 cm x 01cm size having 26 Nos. of holes on it.
Replacement and fixing of nuts & bolts in 05mmx05mm. size
Servicing & double coat spray varnishing of panel mounted, air cooled, dry type, 3 phase, 75 KVA Isolation Transformer having Voltage Ratio 415V/433 V, insulation class ‘B’, primary side tapping +/- 2.5 %, secondary side tapping +/- 5.0 %, off circuit copper link type connection including minor repairing work such as brazing of connections, tightening of nuts & bolts etc. and its re commissioning.
M/s STAR ELECTRICALS
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .