Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.2 LAccepted-AOC BANKOLA AREA BANKOLA AREA OFFICE P O UKHRA DIST PASCHIM BARDHAMAN WEST BENGAL INDIA 713363 | UKHRA | PASCHIM BARDHAMAN | WEST BENGAL | 713363 | L1 | Accepted-AOC TC Recommendation | |
| 2 | L2₹12.8 L+₹61,050.86 (5.00%)Rejected-Finance PANDABESWAR PASCHIM BURDWAN 713346 | PANDABESWAR | PASCHIM BURDWAN | WEST BENGAL | 713346 | L2 | Rejected-Finance TC Recommendation |
Tender Value
₹12.2 L
EMD Value
₹15,300
Closing Date
12 Nov 2024, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
General Manager
Office of The General Manager Bankola Area, PIN-713363
Installation and commissioning of 2sets of HT pump along with pipe line in RVII seam at Shyamsundarpur colliery under Bankola area.
2024_ECL_320219_1
ECL/GM/BA/E TENDER/24-25/EnM/232 Dt 29.10.2024
Open Tender
Electrical and Maintenance Works
Item Rate
45 days
Shyamsundarpur Colliery
Please refer to NIT document
4 documents required · 4 mandatory
₹15,300
11 Jan 2025
29 Oct 2024
13 Nov 2024
29 Oct 2024
12 Nov 2024
29 Oct 2024
29 Oct 2024 - 2 Nov 2024
Amount
Item Description/ Heading
Collection of trolleys from CM section and lifting the same to surface and loading 2 set of HT pump, base plate, HT motor, starter, sluice valve, foot valve, non return valve on trolley and lifting the same to pit top
Transportation and lowering of 2 set HT pump and HT motor, base plate, HT starter, foot valve, sluice valve, Se non return valve from pit top to pit bottom of pit no.3 (dismantling and assembling of cages included for the job)
Transportation of 2 set HT pump and HT motor, base plate, HT starter, foot valve, sluice valve, non return valve from pit bottom to 12L/3ED in RVII seam through haulage track line.
Transportation of 2 set HT pump and HT motor, base plate, HT starter, foot valve, sluice valve, non return valve from 12L/3ED to 12L/6WD in RVII seam manually.
Transportation of 95/120sq.mm. PVCDWA cable, appx. 500m length from 4L substation to site and laying and hanging the same from 12L/2WD to 12L/6WD.
Placing, assembling of 2 set HT pump and HT motor, base plate, HT starter, foot valve, sluice valve, non return valve including connection with delivery and suction line
Testing and commissioning of for leakage and rectification of delivery and suction range
Cleaning of coal and debris in transportation route and suction and delivery line route
Transportation and carrying of 6" M.S. Pipe from area store/central store to unit and lowering the same to pit bottom of pit no.3.
Transportation of 6" MS pipe from Pit no.3 bottom to ) work site in underground
Laying and fitting od Pipes with rubber washer at RVII 1 seam for 12L/6WD to 13L/4ED(1st pump) and 12L/1WD to 12L/5ED (2nd pump).
Cost for M.S. Nut Bolt 5/8"x 3"
Cost for M.S. Nut Bolt 5/8"x 2-1/2"
Cost for 6" Seamless Slip-on type 12mm thick M.S. flange
Total impact of GST for the purpose of CTC
PRASHANTA KABIRAJ (BID ID -1097492)
techsummary_331938.pdf
PDF • 2.67 MB
finsummary_331938.pdf
PDF • 2.67 MB
WOENM232.pdf
PDF • 3.56 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .