| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.3 LAccepted-AOC | L1 | Accepted-AOC Rate qouated by lowest | |
| 2 | L2₹9.3 L+₹3,590.65 (0.39%)Rejected-Finance | L2 | Rejected-Finance Tender quoted by Highest |
| Sl No | Description | Qty | Unit | C BOSE L1 | SARAVANAN CONTRACTOR L2 |
|---|---|---|---|---|---|
| 1.01 | Earth work excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting with initial lead and lift etc., complying with standard specification as per SS 20 B.foundation | 16.18 | m3 | 246 ₹3,980.28 Lowest | 250 ₹4,045 |
| 1.02 | Earth work excavation for foundation in all soils and sub-soils to full depth as may be directed except in hard rock requiring blasting with initial lead and lift etc., complying with standard specification as per SS 20 B.open excavation | 4.14 | m3 | 123 ₹509.22 Lowest | 125 ₹517.5 |
| 1.03 | Plain Cement Concrete 1:4:8 using 40 mm HBG metal for basement and flooring layers not more than 15 cm thick including cost and conveyance of materials to site and all other labour charges including consolidation as per standard specification | 6.02 | m3 | 5,254 ₹31,629.08 Lowest | 5,255 ₹31,635.1 |
| 1.04 | Brick work in CM 1 : 5 using country bricks ground moulded of size 23 x 11 x 7 cm including cost and conveyance of materials to site and all other labour charges as per standard specification. upto basement | 5.26 | m3 | 5,947 ₹31,281.22 Lowest | 5,948 ₹31,286.48 |
| 1.05 | above basement | 14.81 | m3 | 6,034 ₹89,363.54 Lowest | 6,035 ₹89,378.35 |
| 1.06 | Supplying fabricating and placing in position mild steel or ribbed steel for all reinforced concrete works as per the design given including cost of steel and binding wire and all other labour charges as per standard specification. | 1,428.82 | kg | 89 ₹1,27,164.98 Lowest | 90 ₹1,28,593.8 |
| 1.07 | Supply and errection of Centering and Shuttering including necessary supports for plane surface using mild steel sheets of size 90 x 60 cm and 10 gauge stiffened, welded with steel angles and supported by casuarina props of 10 cm to 13 cm dia spaced at 75 column | 51.28 | m2 | 516 ₹26,460.48 Lowest | 517 ₹26,511.76 |
| 1.08 | slab | 74.9 | m2 | 1,033 ₹77,371.7 Lowest | 1,035 ₹77,521.5 |
| 1.09 | Reinforced cement concrete 1:1.5 :3 mix using 20 mm HBG metal for all RCC items of works excluding cost of reinforcement and fabricating charges, centering and shuttering but including curing etc., as directed by the department officers as per standard upto basement | 7.34 | m3 | 8,956 ₹65,737.04 Lowest | 8,957 ₹65,744.38 |
| 1.10 | above basement | 8.86 | m3 | 9,088 ₹80,519.68 Lowest | 9,089 ₹80,528.54 |
Tender Value
₹9,850
EMD Value
₹9,850
Closing Date
24 Sept 2025, 3:00 pmClosed
the block development officer,vp
the block development ,officer,BP,Panchayat union office,chinnamanur
Construction of for public Distribution shop at S.Dharamathu patty in sankarapuram panchay7at
2025_RDTN_604098_1
Construction of for public Distribution shop at S.Dharamathu patty in sankarapuram
Open Tender
Civil Works
Works
panchayat union office
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹9,850
Yes
12 Nov 2025
15 Sept 2025
24 Sept 2025
15 Sept 2025
24 Sept 2025
15 Sept 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .