| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 CrAccepted-AOC BAROO TAND MANDAR RANCHI | ₹3.1 Cr | L1 | Accepted-AOC OK |
| 2 | L2₹3.1 Cr+₹2.4 L (0.79%)Rejected-AOC RANCHI | BOKARO | JHARKHAND | 825102 | ₹3.1 Cr+₹2.4 L (0.79%) | L2 | Rejected-AOC OK |
| 3 | Rejected-Technical | - | - | Rejected-Technical Rejected |
| 4 | Rejected-Technical JAI PRAKASH NAGAR 0 0 JAKKANPUR PATNA BIHAR 800001 | PATNA | BIHAR | 800001 | - | - | Rejected-Technical Rejected |
Tender Value
₹3.1 Cr
EMD Value
₹6.3 L
Closing Date
4 Feb 2025, 5:00 pmClosed
Executive Engineer, RWD works Division, Ranchi
O/o-Executive Engineer, RWD, Works Division, Ranchi
RWD/RANCHI/ 69/ 2024-25 Construction of Road from Vill. Rarha, Tola Modha to Dahupania (L-2.550 Km.)
2025_RWD_98022_1
RWD/RANCHI/ 69/ 2024-25
Open Tender
Civil Works
Percentage
457 days
RANCHI
Tender Fee, EMD, Affidavit
4 documents required · 4 mandatory
₹10,000
₹6.3 L
11 Dec 2025
28 Jan 2025
6 Feb 2025
28 Jan 2025
4 Feb 2025
28 Jan 2025
28 Jan 2025 - 4 Feb 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing grass and removal of rubbish up to a distance of 30 m outside the periphery of the area as per Technical Specification Clause 201 | 1.87 | Ha | 19,760.3 | ₹36,951.76 |
| - | Compacting original ground supporting subgrade (Loosening of the ground upto a level of500 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of table 300-2 for subgrade construction.) | 2,794.88 | M3 | 52.6 | ₹1,47,010.69 |
| - | Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2) | 14,197.02 | M3 | 131.3 | ₹18,64,068.73 |
| - | Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with disposal upto 1000 metres. (Excavation for roadwork in soil with hydraulic excavator of0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m)
Including Royalty etc@ Rs. 27.48 per cum but excluding the cost of watering, rolling & compaction. | 2,515.8 | M3 | 62.4 | ₹1,56,985.92 |
| - | Excavation in ordinary rock with Dozer with lead upto 1000 metres (Excavation for roadway in ordinary rock by deploying a dozer, including cutting and transporting the earth to site of embankment /dumping area with lead upto 1000 metres, trimming bottom and side slopes in accordance with the requirements of lines, grades and cross sections.)
Rate per cum after adding royalty @Rs 27.48/cum | 1,677.2 | M3 | 226.6 | ₹3,80,053.52 |
| - | Construction of Embankment with Material Deposited from Roadway Cutting (Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2)
Rolling with smooth wheeled roller | 2,780.55 | M3 | 61.48 | ₹1,70,948.21 |
| - | Granular Sub-Base with Coarse Graded Material ( Table:- 400- 1)
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.
With Grading-I Material | 1,544.31 | M3 | 2,398.25 | ₹37,03,641.46 |
| - | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | 1,390.92 | M3 | 2,709.24 | ₹37,68,336.1 |
| - | Prime coat (Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.) | 8,916.15 | M2 | 81.43 | ₹7,26,042.09 |
| - | Tack Coat on Granular surfaces treated with primer
Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared granular surface cleaned with mechanical broom. | 8,916.15 | M2 | 16 | ₹1,42,658.4 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
BOQ.xls
BOQ • 0.27 MB
Tenderdocument.pdf
Tender Documents • 1.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .