EXECUTIVE ENGINEER RURAL ENGINEERING DEPARTMENT
EXECUTIVE ENGINEER RURAL ENGINEERING DEPARTMENT JALAUN AT ORAI
Construction of a room at Dr. Bhimrao Ambedkar Cultural Institute, Orai
2026_REDUP_1111860_2
29/EE/RED/2025-26
Open Tender
Civil Works - Buildings
90 days
ORAI
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹29,000
25 May 2026
9 Apr 2026
15 Apr 2026
9 Apr 2026
15 Apr 2026
9 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) DSR 2023 - .5.2.2 | - | m³ | - | - | BI01010001010000000000000515BI0100001113 |
| 2 | Foundations, footings, bases of columns, etc. for concrete Shuttering - DSR 2023- 5.9.1 | - | m² | - | - | BI01010001010000000000000515BI0100001113 |
| 3 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:6 (1 cement : 4 coarse sand) .DSR 2023- 6.4.2 | - | m³ | - | - | BI01010001010000000000000515BI0100001114 |
| 4 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). DSR 2023- 5.30 | - | m³ | - | - | BI01010001010000000000000515BI0100001115 |
| 5 | Lintels, beams, plinth beams, girders, bressumers and cantilevers. for concrete Shuttering - DSR 2023- 5.9.15 | - | m² | - | - | BI01010001010000000000000515BI0100001116 |
| 6 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). DSR 2023- 5.30 | - | m³ | - | - | BI01010001010000000000000515BI0100001113 |
| 7 | Lintels, beams, plinth beams, girders, bressumers and cantilevers. for concrete Shuttering - DSR 2023- 5.9.5 | - | m² | - | - | BI01010001010000000000000515BI0100001113 |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). DSR 2023- 5.30 | - | m³ | - | - | BI01010001010000000000000515BI0100001113 |
| 9 | roofs, landings, balconies and access platform . for concrete Shuttering - DSR 2023- 5.9.3 | - | m² | - | - | BI01010001010000000000000515BI0100001114 |
| 10 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D. DSR 2023- 5.22.6 | - | Kg. | - | - | BI01010001010000000000000515BI0100001115 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.08 MB
SBD29.pdf
Tender Documents • 1.77 MB
BOQ_2078154.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid