Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 CrAccepted-Finance 0 BAGHI NAUGARH NAUGARH CHANDAULI UTTAR PRADESH 232111 | CHANDAULI | UTTAR PRADESH | 232111 | ₹2.2 Cr | L1 | Accepted-Finance LOWEST |
| 2 | L2₹2.2 Cr+₹6.4 L (2.92%)Rejected-Finance GRAM DERE RRAJA POST PANAPUR TEHSIL GAUSPUR DISTRICT BARABANKI UTTAR PRADESH | GAUSPUR | BARABANKI | UTTAR PRADESH | ₹2.2 Cr+₹6.4 L (2.92%) | L2 | Rejected-Finance HIGH RATE BIDDER |
| 3 | L3₹2.3 Cr+₹12.7 L (5.82%)Rejected-Finance 01 226001 | LUCKNOW | UTTAR PRADESH | 226001 | ₹2.3 Cr+₹12.7 L (5.82%) | L3 | Rejected-Finance HIGH RATE BIDDER |
| 4 | L4₹2.6 Cr+₹38.6 L (17.7%)Rejected-Finance GRAM GUTHNA BUZURG POST KAMHARA JANPAD LAKHIMPUR | LAKHIMPUR | UTTAR PRADESH | ₹2.6 Cr+₹38.6 L (17.7%) | L4 | Rejected-Finance HIGH RATE BIDDER |
| 5 | L5₹2.7 Cr+₹53.5 L (24.5%)Rejected-Finance | ₹2.7 Cr+₹53.5 L (24.5%) | L5 | Rejected-Finance HIGH RATE BIDDER |
| Sl No | Description | Qty | Unit | ASHUTOSH KUMAR VERMA L5 | AKANKSHA ASSOCIATES L1 | M/S JAI BAJRANG BALI CONSTRUCTION L3 | MAMTA SHARMA CONTRACTOR CO BARABANKI L2 | SINGH CONTRACTOR L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in filling raincuts, potholes, ruts, dowla, strengthening of canal bank section in all type of soil with all lead & lift including levelling, dressing to profile and manual compaction etc. required for proper completion of work. | 16,252.3 | M3 | 61.7 ₹10,02,766.91 | 32 ₹5,20,073.6 Lowest | 100 ₹16,25,230 | 59 ₹9,58,885.7 | 57 ₹9,26,381.1 |
| 2.00 | Earth work in excavation in all type of soil with back filling and proper disposal of surplus earth including all lead & lift, levelling, dressing and manual compaction etc required for proper completion of work. | 2,642.1 | M3 | 48.21 ₹1,27,375.64 | 20 ₹52,842 Lowest | 100 ₹2,64,210 | 43 ₹1,13,610.3 | 44 ₹1,16,252.4 |
| 3.00 | Centering & Shuttering for C.C. works incl. with cost of shuttering including all cost of material, labour, T&P etc required for proper completion of work. | 3,827.52 | M2 | 385.61 ₹14,75,929.99 | 250 ₹9,56,880 | 120 ₹4,59,302.4 Lowest | 288 ₹11,02,325.76 | 364 ₹13,93,217.28 |
| 4.00 | Laying PCC 1:3:6 with cement, Coarse sand and 10 to 20 mm stone grit with mixing, laying, ramming, curing including cost of all material, labour T&P etc required for proper completion of work. | 453.52 | M3 | 10,748.91 ₹48,74,845.66 | 7,600 ₹34,46,752 Lowest | 8,500 ₹38,54,920 | 9,009 ₹40,85,761.68 | 10,162 ₹46,08,670.24 |
| 5.00 | Laying C.C 1:2:4 with cement, Coarse sand and 10 to 20 mm stone grit with mixing, laying, ramming, curing including cost of all material, labour T&P etc required for proper completion of work. | 498.38 | M3 | 11,169.49 ₹55,66,650.43 | 7,500 ₹37,37,850 Lowest | 11,000 ₹54,82,180 | 9,009 ₹44,89,905.42 | 10,560 ₹52,62,892.8 |
| 6.00 | Supplying & laying graded filter materials including cost of all material, labour, T&P etc required for proper completion of work.
(a) Coarse sand, FM not less than 2.00 | 136.5 | M3 | 5,374.8 ₹7,33,660.2 | 5,100 ₹6,96,150 | 5,000 ₹6,82,500 | 4,290 ₹5,85,585 Lowest | 5,081 ₹6,93,556.5 |
| 7.00 | Supplying & laying graded filter materials including cost of all material, labour, T&P etc required for proper completion of work.
(b) Pea Gravel 6mm to 10mm size | 136.5 | M3 | 5,932.98 ₹8,09,851.77 | 5,800 ₹7,91,700 | 5,000 ₹6,82,500 Lowest | 5,009 ₹6,83,728.5 | 5,909 ₹8,06,578.5 |
| 8.00 | Supplying & laying graded filter materials including cost of all material, labour, T&P etc required for proper completion of work.
(c) Natural shingle 20mm to 40mm size | 136.5 | M3 | 5,673.76 ₹7,74,468.24 | 4,400 ₹6,00,600 | 5,000 ₹6,82,500 | 4,209 ₹5,74,528.5 Lowest | 5,364 ₹7,32,186 |
| 9.00 | Supplying & laying Brick on edge soling with straight over burnt bricks laid on edge on prepared subgrade according to line, Grade, cross section and filling joints with sand and spreading 1 cm thick layer of earth over brick soling, watering as per technical specification including cost of all material, labour, T&P etc required for proper completion of work. | 12,650 | M2 | 491.77 ₹62,20,890.5 | 450 ₹56,92,500 | 560 ₹70,84,000 | 429 ₹54,26,850 Lowest | 464 ₹58,69,600 |
| 10.00 | Providing & fixing 110 mm dia PVC pipe in toe wall including cost of all material, labour T&P etc required for proper completion of work. | 932.76 | RM | 443.45 ₹4,13,632.42 | 380 ₹3,54,448.8 Lowest | 800 ₹7,46,208 | 403 ₹3,75,902.28 | 419 ₹3,90,826.44 |
Tender Value
₹2.8 Cr
EMD Value
₹5.5 L
Closing Date
3 Aug 2026, 3:00 pmClosed
SUPERINTENDING ENGINEER
IX CIRCLE IRRIGATION WORKS BAHRAICH
Strengthening of Right Bank and laying B.O.E soling on Rapti Link channel from km 12.300 to Km. 14.600 in District Shrawasti.
2026_UPIDC_1167986_5
01/SE-IX/2026-27
Open Tender
Civil Works
Item Rate
180 days
BHINGA, SHRAWASTI
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,266
₹5.5 L
IX CIRCLE IRRIGATION WORKS BAHRAICH
11 Sept 2026
13 Jul 2026
3 Aug 2026
13 Jul 2026
3 Aug 2026
13 Jul 2026
13 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in filling raincuts, potholes, ruts, dowla, strengthening of canal bank section in all type of soil with all lead & lift including levelling, dressing to profile and manual compaction etc. required for proper completion of work. | 16,252.3 | M3 | 64 | ₹10,40,147.2 |
| 0.0 | Earth work in excavation in all type of soil with back filling and proper disposal of surplus earth including all lead & lift, levelling, dressing and manual compaction etc required for proper completion of work. | 2,642.1 | M3 | 50 | ₹1,32,105 |
| 0.0 | Centering & Shuttering for C.C. works incl. with cost of shuttering including all cost of material, labour, T&P etc required for proper completion of work. | 3,827.52 | M2 | 400 | ₹15,31,008 |
| 0.0 | Laying PCC 1:3:6 with cement, Coarse sand and 10 to 20 mm stone grit with mixing, laying, ramming, curing including cost of all material, labour T&P etc required for proper completion of work. | 453.52 | M3 | 10,725.93 | ₹48,64,423.77 |
| 0.0 | Laying C.C 1:2:4 with cement, Coarse sand and 10 to 20 mm stone grit with mixing, laying, ramming, curing including cost of all material, labour T&P etc required for proper completion of work. | 498.38 | M3 | 11,181.75 | ₹55,72,760.57 |
| 0.0 | Supplying & laying graded filter materials including cost of all material, labour, T&P etc required for proper completion of work.
(a) Coarse sand, FM not less than 2.00 | 136.5 | M3 | 5,575.37 | ₹7,61,038.01 |
| 0.0 | Supplying & laying graded filter materials including cost of all material, labour, T&P etc required for proper completion of work.
(b) Pea Gravel 6mm to 10mm size | 136.5 | M3 | 6,154.38 | ₹8,40,072.87 |
| 0.0 | Supplying & laying graded filter materials including cost of all material, labour, T&P etc required for proper completion of work.
(c) Natural shingle 20mm to 40mm size | 136.5 | M3 | 5,417.27 | ₹7,39,457.36 |
| 0.0 | Supplying & laying Brick on edge soling with straight over burnt bricks laid on edge on prepared subgrade according to line, Grade, cross section and filling joints with sand and spreading 1 cm thick layer of earth over brick soling, watering as per technical specification including cost of all material, labour, T&P etc required for proper completion of work. | 12,650 | M2 | 510.12 | ₹64,53,018 |
| 0.0 | Providing & fixing 110 mm dia PVC pipe in toe wall including cost of all material, labour T&P etc required for proper completion of work. | 932.76 | RM | 460 | ₹4,29,069.6 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
BOQ_2190587.xls
BOQ • 0.28 MB
LOT05.pdf
Tender Documents • 5.25 MB
BOQ_2190587.xls
PDF • 0.31 MB
DATE.pdf
PDF • 0.26 MB
BOQ05.xls
PDF • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .