Tender Value
₹61.4 L
EMD Value
₹4.7 L
Closing Date
8 Jun 2026, 3:00 pm2d left
Executive Engineer
Nagar Nigam Firozabad
Road improvement work by hotmix and footpath and tree plantation work by interlocking from Chacha T Point to Dr. Praveen Srivastava house on NH-2 in Ward No. 14.
2026_DOLBU_1148095_14
02/Nirman_N-Cap/2026-27 Date - 13/05/2025
Open Tender
Civil Works
Firozabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,241
Municipal Corporation
₹4.7 L
18 May 2026
18 May 2026
8 Jun 2026
18 May 2026
8 Jun 2026
18 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentalling of B.O.E soling/Inter locking tiles Including Stacking of servicable material and disposal of unservicable material within a lead of 50m as per direction of EI/C (Labour only) (PWD SOR 2022-23, Chepter-20, Serial No.19 Item No. New) | 1,190 | Cum | 10 | ₹11,900 |
| 2 | Deduction of old interlocking tiles | 14,577.5 | Cum | 4.6 | ₹67,056.5 |
| 3 | Excavation in foundation in ordinary soil or silt (loam, clay or sand) including lift upto 1.50m and lead up to 30m and including filling watering and ramming of excavated earth in to the trenches or in to the space between the building and the side of foundation trenches or in to the plinth and removal and disposal of surplus earth as directed by the Engineer in charge up to a distance of 30m from the foundation trenches. (PWD SOR 2025-26, Chepter-4, Item No.01 Spec- 251 ) | 345.1 | Cum | 150 | ₹51,765 |
| 4 | Cartage of malva from site up to 8km distance including loading & unloading, T&P etc. required for proper of work as direction by Engineer-In-Charge. (PWD SOR 2022-23, Chepter-3, Item No. 231a ) | 406.98 | Cum | 230.1 | ₹93,646.1 |
| 5 | Providing and laying cement concrete in 1:4:8 Providing and laying cement concrete in 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40mm nominal size) and curing complete. including cost of form work in Foundation and floors. (PWD SOR 2025-26 Chapter No-05 Item No. 3 Spec. No.4.1). | 28.9 | Cum | 5,650 | ₹1,63,285 |
| 6 | RCC work Providing and laying in position specified grade of reinforced cement concrete in Raft foundation, including the cost of centering, shuttering, finishing and excluding reinforcement - All work up to plinth level in :1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) (PWD SOR 2025-26, Chepter-5, Item No.9 Spec. no. 5.1). | 23.8 | Cum | 8,100 | ₹1,92,780 |
| 7 | R.C.C work in Wall (any thickness) including attached plasters, buttresses, plinth and string courses, fillers, columns, pillars, abutments, post and struts etc. including the cost of centering, shuttering, finishing and excluding reinforcement All work up to plinth level in 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) upto plinth level (PWD SOR 2025-26, Chepter-5, Item No.9 Spec. no. 5.2) | 36.72 | Cum | 8,300 | ₹3,04,776 |
| 8 | RCC Work Providing and laying inposition specified grade of reinforced cement concrete slab including the cost of centering, shuttering, finishing and excluding reinforcement All work upto plinth level :1:1.5:3 (1cement :1.5 coarse sand: 3graded stone aggregate 20mm nominal size) (PWDSOR 2025-26 Chapter No-05 Item No.8 Spec. No. 5.1). | 28.56 | Cum | 8,600 | ₹2,45,616 |
| 9 | Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening to fill-up the interstices of coarse aggregate watering and compacting to the required density grading 2 as per technical specification clause-405 (As per analysis WBM Grading - 2). | 202.73 | Cum | 3,650 | ₹7,39,964.5 |
| 10 | Grandular Sub-base with well Graded Material (Table 400.1)
(A) By Mix in Place Method
Construction of granular sub-base by providing well graded material, spreading in uniform layers wth motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheelo roller to achieve the desired density. complete as per technical spercification clause-401 (As per Analysis). | 114.75 | Cum | 3,234 | ₹3,71,101.5 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.22 MB
BOQ_2148884.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid