Loading…
Loading…
Tender ID
Tender Value
₹2.9 L
EMD Value
₹14,700
Closing Date
18 Mar 2026, 6:55 pmClosed
EXECUTIVE ENGINEER REW BUDGAM
RDD Complex Budgam
CONSTRUCTION OF BRIDAL PATH FROM MAIN ROAD TO MIR MOHALLA VIA HOUSE OF NAZIR AHMAD KHAN AB HAMID AND OTHERS ALONG WITH PROTECTION WALL AT PAHADIPORA JADDEN
2026_RDPR_306049_4
NIT_147_REW_Budgam
Open Tender
Civil Works
Percentage
30 days
surasyar
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Executive Engineer REW Budgam
₹14,700
12 Mar 2026
12 Mar 2026
19 Mar 2026
12 Mar 2026
18 Mar 2026
12 Mar 2026
Select, At Par, Excess (+), Less (-) IOCL
Tender Inviting Authority: Rural Engineering wing Budgam
Name of work :- Construction of Bridal Path from Main Road to Mir Mohalla via House of Nazir Ahmad Khan,Ab Hamid and others at Pahadipora Jadden along with Protection Wall
Contract No: of 2023-24 DATED: - -2023 Adv cost =Rs 3.00 Lacs
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Item Description Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category
0_) Earth work in excavation by Manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shaftswells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: BI01010001010000000000000515BI0100001115 Cum _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR
0_) Providing and laying of stone soling hand packed complete Job excluding by Carragr by MT incl. plum. BI01010001010000000000000515BI0100001116 Cum _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR
0_) Centering and shuttering including strutting, propping etc. and removal of form for: Foundations BI01010001010000000000000515BI0100001117 Sqm _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR
0_) Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) BI01010001010000000000000515BI0100001118 Cum _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR
0_) 12 mm thick cement sand plaster of (1:4) mix BI01010001010000000000000515BI0100001119 Sqm _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR
0_) Filling Excivated earth (excluding Roak)in trenches plinth,Sides of trenches etc in layers not exceeding 20 cm in depth, consolidating each deposit.layer by ramming and watering lead upto 50 mtrs 5m and and lift upto 1.5 m BI01010001010000000000000515BI0100001120 Cum _(* #,##0.99_);_(* \(#,##0.99\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR
0_) Placing and laying of RCC Spun Pipes inc Earth work and sand cusion over pipes and loading, Unloading Carrage of pipes compleate job (9"dia) BI01010001010000000000000515BI0100001121 Rm _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR
0_) Carraige of soling from Source to Site. BI01010001010000000000000515BI0100001122 Cum _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR
0_) Carraige of stone aggregate, from Source to Site. BI01010001010000000000000515BI0100001123 Cum _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR
0_) Carraige of sand from Source to Site.for BI01010001010000000000000515BI0100001124 11.58 Cum _(* #,##0.00_);_(* \(#,##0.00\);_(* "-"??_);_(@_) Excess(+) Full Conversion INR
0_) Add provisions for signboard, Photographes and other unforseen items. Pvc pipes for weep holes BI01010001010000000000000515BI0100001125 1 Job Excess(+) Full Conversion INR
Total in Figures
Quoted Rate in Figures Select
Please Enable Macros to View BoQ information
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.24 MB
BOQ_993920.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .