Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.6 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.7 L+₹6,651.28 (4.13%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹1.8 L+₹17,753.41 (11.0%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹1.9 L+₹33,606.46 (20.9%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | ||
| 5 | L5₹2.2 L+₹54,160.40 (33.7%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.5 L
EMD Value
₹5,000
Closing Date
18 Aug 2026, 4:00 pmClosed
Executive Engineer RandB Division Budgam
Engineering Complex Budgam
Covering of Drain by RCC slab via the H/O Late Mohd Shafi Bhat to the Land of Mohd Jaffar Parra at Budgam
2026_PWDJK_320093_2
NIT_No_65_DB_2026-27
Open Tender
Civil Works
Percentage
20 days
Budgam
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
Executive Engineer RandB Division Budgam
₹5,000
20 Aug 2026
8 Aug 2026
19 Aug 2026
8 Aug 2026
18 Aug 2026
8 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). | 10.14 | Cum | 9,821.85 | ₹99,593.56 |
| 2 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. | 1,013.84 | Kg | 123.2 | ₹1,24,905.09 |
| 3 | Providing and fixing in position precast R.C.C. manhole cover and frame of required shape and approved quality; Circular shape 56 0mm internal diameter. | 1 | No. | 1,677.1 | ₹1,677.1 |
| 4Centering and shuttering including strutting, propping etc and removal of formwork for: | |||||
| 4.01 | Suspended floors, roofs, landings, balconies and access platforms. | 24.94 | Sqm | 718.2 | ₹17,911.91 |
| 5Carriage of materials from source to site of work including loading unloading complete by Mechanical Transport. | |||||
| 5.01 | Stone aggregates from Lasjan for an average Lead of 21 kms. | 9.12 | Cum | 420.98 | ₹3,839.34 |
| 5.02 | Sand from Pampore for an average Lead of 25 kms. | 4.56 | Cum | 465.14 | ₹2,121.04 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.25 MB
BOQ_1062520.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .