Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1Admitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹19.4 L+₹19.4 L (194381986.0%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹19.7 L+₹19.7 L (196653018.0%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | |
| 4 | L4₹19.9 L+₹19.9 L (199383761.0%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | |
| 5 | L5₹20.0 L+₹20.0 L (199878224.0%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | M JAYAPRAKASH L2 | D.Lingeshwaran L1 | SSK ENTERPRISES L4 | S.BOOBESH L6 | S G NARAYANAN L3 | M.SHANMUHANANTHAM L5 | R.SUJATHA L7 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all soils and sub - soils to full depth etc. complete as per SS 20B | 131.45 | Cum | 220 ₹28,919 | 55 ₹7,229.75 Lowest | 250 ₹32,862.5 | 235.95 ₹31,015.63 | 153 ₹20,111.85 | 200 ₹26,290 | 263 ₹34,571.35 |
| 2.00 | Supplying and filling in foundation and basement with Filling M Sand in layers etc. complete. | 16.85 | Cum | 1,450 ₹24,432.5 | 580 ₹9,773 Lowest | 1,700 ₹28,645 | 1,553.7 ₹26,179.85 | 1,200 ₹20,220 | 1,200 ₹20,220 | 1,736 ₹29,251.6 |
| 3.00 | Cement concrete 1:4:8 mix using 40mm metal including all other labour charges for laying, watering and curing charges etc., complete | 16.85 | Cum | 4,544 ₹76,566.4 Lowest | 5,000 ₹84,250 | 4,700 ₹79,195 | 4,780.94 ₹80,558.84 | 4,860 ₹81,891 | 5,100 ₹85,935 | 5,300 ₹89,305 |
| 4.00 | Centering charges for all CC items of works including all labour charges etc., complete. RCC Drain | 453.32 | Sqm | 457 ₹2,07,167.24 | 145 ₹65,731.4 Lowest | 182 ₹82,504.24 | 244.87 ₹1,11,004.47 | 150 ₹67,998 | 182.5 ₹82,730.9 | 273 ₹1,23,756.36 |
| 5.00 | Supplying and fabrication of steel including cost and conveyance and all other labour charges etc complete. | 3.62 | MT | 76,701 ₹2,77,657.62 Lowest | 85,000 ₹3,07,700 | 81,000 ₹2,93,220 | 82,167.43 ₹2,97,446.1 | 84,000 ₹3,04,080 | 80,000 ₹2,89,600 | 91,000 ₹3,29,420 |
| 6.00 | Reinforced Cement concrete 1:1 1/2:3, 20mm gauge hard broken granite jelly including cost and conveyance and all other labour charges etc complete. | 24.08 | Cum | 7,570 ₹1,82,285.6 | 6,000 ₹1,44,480 Lowest | 6,200 ₹1,49,296 | 8,110 ₹1,95,288.8 | 6,800 ₹1,63,744 | 7,500 ₹1,80,600 | 8,000 ₹1,92,640 |
| 7.00 | Cement concrete 1:2:4, 20mm gauge hard broken granite jelly including cost and conveyance and all other labour charges etc complete. | 47.63 | Cum | 3,490 ₹1,66,228.7 Lowest | 5,300 ₹2,52,439 | 6,200 ₹2,95,306 | 5,935.79 ₹2,82,721.68 | 5,900 ₹2,81,017 | 5,800 ₹2,76,254 | 6,600 ₹3,14,358 |
| 8.00 | Plastering with cm 1:5 mix, 12mm thick including all other labour charges etc., complete. | 56.25 | Sqm | 238 ₹13,387.5 | 150 ₹8,437.5 Lowest | 280 ₹15,750 | 252.63 ₹14,210.44 | 250 ₹14,062.5 | 250 ₹14,062.5 | 282 ₹15,862.5 |
| 9.00 | Supply and Delivery of Manhole Cover 60 x 60cm (Heavy Duty) with Frame including all Charges etc., complete | 19 | Nos | 1,566 ₹29,754 | 1,500 ₹28,500 Lowest | 2,500 ₹47,500 | 2,416.04 ₹45,904.76 | 2,300 ₹43,700 | 2,500 ₹47,500 | 2,700 ₹51,300 |
| 10.00 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory Soil Compactor to achieve the desired density, complete as per clause 401 | 67.5 | Cum | 2,058 ₹1,38,915 | 2,350 ₹1,58,625 | 2,200 ₹1,48,500 | 2,204.44 ₹1,48,799.7 | 2,000 ₹1,35,000 | 1,800 ₹1,21,500 | 280 ₹18,900 Lowest |
Tender Value
₹23.5 L
EMD Value
₹24,000
Closing Date
18 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Block Development officer (VP)
St Thomas Mount Panchayat union Office, Cheitlapakkam
PROVIDING CEMENT CONCRETE DRAIN AND CEMENT CONCRETE PAVEMENT TO ROSE NAGAR 3RD MAIN ROAD 2ND STREET IN KOVILAMPAKKAM PANCHAYAT AT ST THOMAS MOUNT PANCHAYAT UNION . SCHEME OF VPGF 2026 2027 ESTIMATE AMOUNT RS.23.50 LAKHS
2026_RDTN_721615_1
1302/2026/B1, dt. 02.11.2026
Open Tender
Civil Works - Roads
Item Rate
120 days
KOVILAMBAKKAM
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹24,000
Yes
18 Nov 2026
4 Nov 2026
18 Nov 2026
4 Nov 2026
18 Nov 2026
4 Nov 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work excavation for foundation in all soils and sub - soils to full depth etc. complete as per SS 20B | 131.45 | Cum | - | - |
| 2 | Supplying and filling in foundation and basement with Filling M Sand in layers etc. complete. | 16.85 | Cum | - | - |
| 3 | Cement concrete 1:4:8 mix using 40mm metal including all other labour charges for laying, watering and curing charges etc., complete | 16.85 | Cum | - | - |
| 4 | Centering charges for all CC items of works including all labour charges etc., complete. RCC Drain | 453.32 | Sqm | - | - |
| 5 | Supplying and fabrication of steel including cost and conveyance and all other labour charges etc complete. | 3.62 | MT | - | - |
| 6 | Reinforced Cement concrete 1:1 1/2:3, 20mm gauge hard broken granite jelly including cost and conveyance and all other labour charges etc complete. | 24.08 | Cum | - | - |
| 7 | Cement concrete 1:2:4, 20mm gauge hard broken granite jelly including cost and conveyance and all other labour charges etc complete. | 47.63 | Cum | - | - |
| 8 | Plastering with cm 1:5 mix, 12mm thick including all other labour charges etc., complete. | 56.25 | Sqm | - | - |
| 9 | Supply and Delivery of Manhole Cover 60 x 60cm (Heavy Duty) with Frame including all Charges etc., complete | 19 | Nos | - | - |
| 10 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory Soil Compactor to achieve the desired density, complete as per clause 401 | 67.5 | Cum | - | - |
stage.html
html • 0.03 MB
finance_866516.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.40 MB
TENDER.pdf
Tender Documents • 0.53 MB
BOQ_866516.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .