Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹50.0 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹50.8 L+₹78,960 (1.58%)Admitted-Finance | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s Merco Airconditioning Refrigeration Engineers L1 | M/s Impact Engineers L2 |
|---|---|---|---|---|---|
| 1.01 | Comprehensive Maintenance of following AC package units rount the clock along with all accessories including checking and cleaning of condenser coils, cooling coils, filters, alignment of fans, checking of terminals, integral parts on regular interval, replacement of belts, consumables by deputing manning staff for rectification/ attending the site on daily basis to maintain the inside temperature etc complete as required.
a) (6x11 TR)+ (3x11) TR package units. ( D-V & D-IV) 8 1/2 Floor TE NP) | 24 | Month | 58,410 ₹14,01,840 | 58,350 ₹14,00,400 Lowest |
| 1.02 | b) 10x11 TR Package/Ductable units. ( Switch Room 7 th Floor at TE NP) | 24 | Month | 62,500 ₹15,00,000 Lowest | 63,000 ₹15,12,000 |
| 1.03 | c) 11 TR - 8 Nos. (Switch Room 2 1/2 Floor, T.E. Bldg., Nehru Place) | 24 | Month | 33,600 ₹8,06,400 Lowest | 34,400 ₹8,25,600 |
| 1.04 | d) 2 x7.5TR Package/Ductable ( MPLS Room 8 1/2 Floor, T.E. NP) | 24 | Month | 6,200 ₹1,48,800 Lowest | 6,200 ₹1,48,800 Lowest |
| 1.05 | e) 8.5 TR - 6 Nos. ( Chirag Delhi - 3 Nos, C.R. Park - 3 Nos) | 24 | Month | 20,250 ₹4,86,000 Lowest | 21,300 ₹5,11,200 |
| 1.06 | f) 4.0 / 5.0 / 5.5 TR - 11 Nos. ( CR Park - 1 No., Kalkaji - 4 Nos., Amar Colony - 3Nos., PCM Room Chy - 2 Nos. & New Moti Bagh - 1 No.) | 24 | Month | 24,200 ₹5,80,800 Lowest | 25,300 ₹6,07,200 |
| 1.07 | g) 2 x 3 TR Ductable (Switch Room 3rd Floor BCP) | 24 | Month | 3,100 ₹74,400 | 3,000 ₹72,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
23 Dec 2020, 3:00 pmClosed
EE(E)BCP
Office of EE(E)BCP, MTNL TE Bldg BCP New Delhi
Comp Mtce of AC units under Sub Division BCP and Nehru Place, New Delhi
2020_MTNL_603359_1
EE(E)BCP/MTNL/NIT/2020-21/66
Open Tender
Electrical Works
Item Rate
730 days
New Delhi
Please refer Tender documents.
7 documents required · 7 mandatory
₹590
MTNL
₹1.2 L
24 Dec 2020
15 Dec 2020
24 Dec 2020
15 Dec 2020
23 Dec 2020
15 Dec 2020
Amount
Comprehensive Maintenance of following AC package units rount the clock along with all accessories including checking and cleaning of condenser coils, cooling coils, filters, alignment of fans, checking of terminals, integral parts on regular interval, replacement of belts, consumables by deputing manning staff for rectification/ attending the site on daily basis to maintain the inside temperature etc complete as required. a) (6x11 TR)+ (3x11) TR package units. ( D-V & D-IV) 8 1/2 Floor TE NP)
b) 10x11 TR Package/Ductable units. ( Switch Room 7 th Floor at TE NP)
c) 11 TR - 8 Nos. (Switch Room 2 1/2 Floor, T.E. Bldg., Nehru Place)
d) 2 x7.5TR Package/Ductable ( MPLS Room 8 1/2 Floor, T.E. NP)
e) 8.5 TR - 6 Nos. ( Chirag Delhi - 3 Nos, C.R. Park - 3 Nos)
f) 4.0 / 5.0 / 5.5 TR - 11 Nos. ( CR Park - 1 No., Kalkaji - 4 Nos., Amar Colony - 3Nos., PCM Room Chy - 2 Nos. & New Moti Bagh - 1 No.)
g) 2 x 3 TR Ductable (Switch Room 3rd Floor BCP)
M/s Impact Engineers
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .