| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹89.9 LAdmitted-Finance | ₹89.9 L | L1 | Admitted-Finance |
| 2 | L2₹91.6 LAdmitted-Finance | ₹91.6 L | L2 | Admitted-Finance |
| 3 | L3₹95.4 LAdmitted-Finance | ₹95.4 L | L3 | Admitted-Finance |
| 4 | L4₹1.1 CrAdmitted-Finance | ₹1.1 Cr | L4 | Admitted-Finance |
| 5 | L5₹1.1 CrAdmitted-Finance | ₹1.1 Cr | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Laxman Singh L10 | Mohd Waseem Sheikh L7 | ASHOK KUMAR SHARMA L3 | AFTAB HUSSAIN GOVT. CONTRACTOR L8 | M/S Hajra Infra L4 | N K CONSTRUCTION L9 | Bashir Wani Constructions Private Limited L5 | Balbir Singh L2 | M/S RAJINDER SINGH RANDHAWA L6 | MATINDER KOUR L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Earthwork in excavation by mechanical means (Hydraulic excavator)/mannual means in foundation trenches or drains ( not exceeding 1.5 m in width or 10 Sq. m on plan), including dressing of sides & remaining of bottoms , lift upto 1.5 m , including getting out the excavated soil and disposal of surplus excavated soil as directed , within a lead of 50 m | |||||||||||||
| 1.10 | All kinds of soil. | 844.07 | cum | 120 ₹1.0 L | 100 ₹84,407 | 200 ₹1.7 L | 185 ₹1.6 L | 200 ₹1.7 L | 140 ₹1.2 L | 150 ₹1.3 L | 100 ₹84,407 | 10 ₹8,440.70 | 160 ₹1.4 L |
| 2.00 | Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 4,423.79 | sqm | 5 ₹22,118.95 | 4 ₹17,695.16 | 6 ₹26,542.74 | 4.2 ₹18,579.92 | 15 ₹66,356.85 | 5 ₹22,118.95 | 10 ₹44,237.90 | 10 ₹44,237.90 | 10 ₹44,237.90 | 18 ₹79,628.22 |
| 3.00Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | |||||||||||||
| 3.10 | 1:5:10 (1 cement : 5 fine sand(zone-III) : 10 graded stone aggregate 40 mm nominal size) | 111.38 | cum | 2,000 ₹2.2 L | 2,000 ₹2.2 L | 3,500 ₹3.9 L | 3,600 ₹4.0 L | 2,700 ₹3.0 L | 3,429 ₹3.8 L | 2,500 ₹2.8 L | 1,500 ₹1.7 L | 3,000 ₹3.3 L | 2,050 ₹2.3 L |
| 3.20 | 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). | 1,108.68 | cum | 3,900 ₹43.2 L | 4,000 ₹44.3 L | 3,900 ₹43.2 L | 4,400 ₹48.8 L | 3,000 ₹33.3 L | 4,331 ₹48.0 L | 4,200 ₹46.6 L | 3,400 ₹37.7 L | 4,400 ₹48.8 L | 3,200 ₹35.5 L |
| 4.00Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : | |||||||||||||
| 4.10 | 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size). | 2.71 | cum | 5,400 ₹14,634 | 7,000 ₹18,970 | 4,300 ₹11,653 | 6,000 ₹16,260 | 5,000 ₹13,550 | 5,765 ₹15,623.15 | 6,500 ₹17,615 | 7,000 ₹18,970 | 5,200 ₹14,092 | 4,500 ₹12,195 |
| 5.00Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : | |||||||||||||
| 5.10 | 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size). | 1.57 | cum | 5,400 ₹8,478 | 9,000 ₹14,130 | 4,900 ₹7,693 | 9,100 ₹14,287 | 5,000 ₹7,850 | 7,000 ₹10,990 | 6,500 ₹10,205 | 7,500 ₹11,775 | 5,000 ₹7,850 | 4,500 ₹7,065 |
Tender Value
₹1.6 Cr
EMD Value
₹3.3 L
Closing Date
7 May 2026, 4:00 pmClosed
Estates Officer, SKUAST-Jammu
Estates Division, SKUAST-J, Chatha
Reconstruction of Chain link fencing to the Research Farm at Main Campus, Chatha.
2026_SKUST_309179_4
AU/Estates/2026-27/03 dated 22-04-2026
Open Tender
Civil Works
120 days
Main Campus, Chatha
Please refer tender documents
4 documents required · 4 mandatory
₹2,000
Assistant Comptroller (Estates), SKUAST-Jammu
₹3.3 L
14 May 2026
30 Apr 2026
8 May 2026
30 Apr 2026
7 May 2026
30 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earthwork in excavation by mechanical means (Hydraulic excavator)/mannual means in foundation trenches or drains ( not exceeding 1.5 m in width or 10 Sq. m on plan), including dressing of sides & remaining of bottoms , lift upto 1.5 m , including getting out the excavated soil and disposal of surplus excavated soil as directed , within a lead of 50 m | |||||
| 1.1 | All kinds of soil. | 844.07 | cum | - | - |
| 2 | Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 4,423.79 | sqm | - | - |
| 3Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : | |||||
| 3.1 | 1:5:10 (1 cement : 5 fine sand(zone-III) : 10 graded stone aggregate 40 mm nominal size) | 111.38 | cum | - | - |
| 3.2 | 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). | 1,108.68 | cum | - | - |
| 4Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : | |||||
| 4.1 | 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size). | 2.71 | cum | - | - |
| 5Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : | |||||
| 5.1 | 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size). | 1.57 | cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.29 MB
Termsandconditions.pdf
Tender Documents • 0.22 MB
BOQ_1001053.xls
BOQ • 4.44 MB
Scheduleofcredits.pdf
Other Document • 0.01 MB
Download all tender documents and submit your bid