| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.0 CrAccepted-Finance NO 5 37 VITTAMPALAYAM EMAPALLI TIRUCHENGODE TALUK NAMAKKAL DISTRICT 637211 | EMAPALLI | NAMAKKAL | TAMIL NADU | 637211 | ₹1.0 Cr | 1 | Accepted-Finance First Lowest |
| 2 | 2₹1.0 CrAccepted-Finance | ₹1.0 Cr | 2 | Accepted-Finance Second Lowest |
| Sl No | Description | Qty | Unit | V.RAJENDRAN L2 | RKK CONSTRUCTION L1 |
|---|---|---|---|---|---|
| 1.00 | Dismantling Brick Masonry in Cement Mortar walls under 3m high etc., Complete complying with standard specification. | 16.82 | Cu.m | 309 ₹5,197.38 | 302 ₹5,079.64 |
| 2.00 | Hire Charges for plywood partitions sheet of 12mm thick with country wood reeper 50x25mm in cluding cost of materials nails etc. Complete. This including the cost of reterived materials deductioned the value of the materials useful for use or as fire wood as the care may be as the items for deducted already before arriving the cost rate for this items the reterived materials before has to be dismantled and taken away by the contractor etc. | 174.98 | Sq.m | 1,372 ₹2.4 L | 1,345 ₹2.4 L |
| 3.00 | Supplying and fixing mild steel angles 40x6 mm etc., Complete complying with standard specification. | 32.49 | Kg | 89 ₹2,891.61 | 87 ₹2,826.63 |
| 4.00Brick partition walls of 11.50cm thickness using best quality Burnt Clay Brick of size 9” x 4 3/8” x 2 3/4” with class designation of 7.5 conforming to IS 1077-1992 in Cement Mortar 1:3 (One Cement and Three Crushed Stone Sand) using hoop iron reinforcement if found necessary including Cost of Mortar Plasticizer, curing etc. complete complying with standard specification and as directed by the departmental officers. (Hoop iron reinforcement will be measured and paid for separately) | |||||
| 4.01 | For Superstructure in Ground Floor | 138.09 | Sq.m | 1,049 ₹1.4 L | 1,028 ₹1.4 L |
| 5.00Brick work in Cement Mortar 1:5 using best quality Burnt Clay Brick of size 9” x 4 3/8” x 2 3/4” with class designation of 7.5 conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc., complete complying with standard specification and as directed by the departmental officers. Brick work shall be done as per IS 2212-1991 adopting English Bond generally other type of bond shall be done as directed by the Executive Engineer in charge. | |||||
| 5.01 | For Superstructure in First Floor | 0.25 | Cu.m | 7,920 ₹1,980 | 7,764 ₹1,941 |
| 6.00 | Plastering the surface of walls with Cement Mortar 1:3 (One cement and Three plastering sand), 12mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used, curing etc., complete complying with standard specification and as directed by the departmental officers. | 237.28 | Sq.m | 309 ₹73,319.52 | 302 ₹71,658.56 |
| 7.00 | Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification and as directed by the departmental officers. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work) | 1,505.07 | Sq.m | 236 ₹3.6 L | 231 ₹3.5 L |
| 8.00 | Hire charges for weld mesh partition using Square hollow section pipe with size 50 x 50 thick 2.5mm for vertical ports having 1.00m @ centre to centre with horizontal stiffeners using 50 x 25 thick 2.5mm thick hollow section pipe horizontally at 45 cm c/c vertically with weld mesh 1" x 1" c/c and vertically size upto 2.50m height.The rate is inclusive of cost of all materials,labour for fixing with fixing materials cutting the steel,welding and grinding for finishing and transportation cost etc.,complete complying with standard specifiction and as directed by the departmental officers. | 3,593.64 | Sq.m | 1,081 ₹38.8 L | 1,059 ₹38.1 L |
Tender Value
₹1.0 Cr
EMD Value
₹61,000
Closing Date
9 Apr 2026, 3:00 pmClosed
The Superintending Engineer, PWD.,
The Superintending Engineer, PWD., Buildings Construction and Maintenance Circle,Tiruvannamalai-4.
Providing Temporary Arrangements to the Counting Hall, Storage cum Strong room, Barricade arrangements and Observer room Arrangements for Sankarapuram, Kallakurichi Assembly Constituencies for MLA Election at Sri Lakshmi College in Kallakurichi Dist
2026_PWD_675439_1
87/TVM-CLE/25-26/5/ Dt.30.03.2026
Open Tender
Civil Works
12 days
Kallakurichi
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹61,000
9 Apr 2026
7 Apr 2026
9 Apr 2026
7 Apr 2026
9 Apr 2026
7 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Dismantling Brick Masonry in Cement Mortar walls under 3m high etc., Complete complying with standard specification. | |||||
| 2Hire Charges for plywood partitions sheet of 12mm thick with country wood reeper 50x25mm in cluding cost of materials nails etc. Complete. This including the cost of reterived materials deductioned the value of the materials useful for use or as fire wood as the care may be as the items for deducted already before arriving the cost rate for this items the reterived materials before has to be dismantled and taken away by the contractor etc. | |||||
| 3Supplying and fixing mild steel angles 40x6 mm etc., Complete complying with standard specification. | |||||
| 4Brick partition walls of 11.50cm thickness using best quality Burnt Clay Brick of size 9” x 4 3/8” x 2 3/4” with class designation of 7.5 conforming to IS 1077-1992 in Cement Mortar 1:3 (One Cement and Three Crushed Stone Sand) using hoop iron reinforcement if found necessary including Cost of Mortar Plasticizer, curing etc. complete complying with standard specification and as directed by the departmental officers. (Hoop iron reinforcement will be measured and paid for separately) | |||||
| 4.01 | For Superstructure in Ground Floor | - | Sq.m | - | - |
| 5Brick work in Cement Mortar 1:5 using best quality Burnt Clay Brick of size 9” x 4 3/8” x 2 3/4” with class designation of 7.5 conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc., complete complying with standard specification and as directed by the departmental officers. Brick work shall be done as per IS 2212-1991 adopting English Bond generally other type of bond shall be done as directed by the Executive Engineer in charge. | |||||
| 5.01 | For Superstructure in First Floor | - | Cu.m | - | - |
| 6Plastering the surface of walls with Cement Mortar 1:3 (One cement and Three plastering sand), 12mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used, curing etc., complete complying with standard specification and as directed by the departmental officers. | |||||
| 7Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffolding arrangements, labour charges, etc., as per standard specification and as directed by the departmental officers. (The colour and shade of the distemper shall be got approved by the Executive Engineer before use of work) | |||||
| 8Hire charges for weld mesh partition using Square hollow section pipe with size 50 x 50 thick 2.5mm for vertical ports having 1.00m @ centre to centre with horizontal stiffeners using 50 x 25 thick 2.5mm thick hollow section pipe horizontally at 45 cm c/c vertically with weld mesh 1" x 1" c/c and vertically size upto 2.50m height.The rate is inclusive of cost of all materials,labour for fixing with fixing materials cutting the steel,welding and grinding for finishing and transportation cost etc.,complete complying with standard specifiction and as directed by the departmental officers. | |||||
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.18 MB
Lakshmi_GC.pdf
Additional Documents • 0.43 MB
BOQ_811802.xls
BOQ • 0.29 MB
Lakshmi_Doc.pdf
Tender Documents • 0.24 MB