Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹48.3 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹1.4 Cr+₹96.5 L (199.5%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹1.6 Cr+₹1.1 Cr (220.7%)Rejected-Finance 344 1 SB GORAI ROAD HILL VIEW PARK NORTH ASANSOL | ASANSOL | WEST BENGAL | L3 | Rejected-Finance L3 | |
| 4 | L4₹1.7 Cr+₹1.2 Cr (241.7%)Rejected-Finance ASANSOL | ASANSOL | L4 | Rejected-Finance L4 | |
| 5 | L5₹1.8 Cr+₹1.3 Cr (266.2%)Rejected-Finance 85 A SEN ROAD KOLKATA 700 048 | KOLKATA | KOLKATA | WEST BENGAL | 700048 | L5 | Rejected-Finance L5 |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
3 Dec 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Secretary
Asansol
Repairing and maintenance of Kalajhaia and Ismile Pump House including materials, labour for repairing and replacement all complete under A.M.C.
2022_MAD_423301_2
202/WS/ENG/2022
Open Tender
Miscellaneous Works
Item Rate
365 days
Asansol
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹20,000
23 Mar 2023
18 Nov 2022
5 Dec 2022
18 Nov 2022
3 Dec 2022
18 Nov 2022
Amount
DESCRIPTION OF WORK FOR KALAJHARIA & ISMILE PUMP HOUSE UNDER ASANSOL MUNICIPAL CORPORATION.
Day to day periodical inspection as and when required by electrical supervisor having valid supervisor's certificate of competency from directorate of Electricity (Licensing board) , govt of west bengal or under any other state govt. of India along with pump Techanician/ Supervisor. Each visit should be recorded in the log book (With date and time) to be supplied by the agency and kept in the pump house building. The supervisor requires to have thorough/in-depth instruction of all the electrical appliances to ascertain the healthy/ fault free operational condition of each equipment i.e (For 40 Nos. 40HP to 175HP centrifugal pump-motor 03Nos. 300HP vertical turbine pump-motor, 01No. 175HP vertical turbine pump-motor, 36 Nos. 10HP to 17.5HP Sub-mersible pump-motor , same no. of starter ,cable and HT VCB,ACB,OCB, Transformer, LT panel ,PDB, capacitor, all type of valves ,actuators,relays,contactors,timers,SFU including cleaning of contacts by CRC 226 spray in HT & LT panel board, cleaning of all terminal sockets and checking of healthy condition of draw out feeders all complete as per satisfaction of E-i-C. .
PART-B DESCRIPTION OF WORK FOR DIHIKA & KSTP PUMP HOUSE UNDER ASANSOL MUNICIPAL CORPORATION. Transformer 750 KVA 11/.4 KV
Rparing of Transformer Oil Filtering & Oil Filling.
Reparing of 750 KVA Transformer wending & Tap changer
Overhauling
Transformer 500 KVA 11/.4 KV
Reparing of 500 KVA DTR Stud , Bushing , Socket, Radiotor, Bether ,OTI WTI, Bhucholes gus kit, Oil Seal etc.
Rparing of Transformer Oil Filtering & Oil Filling
Reparing of 500 KVA Transformer wending & Tap changer.
Transformer 250 KVA 11/.4 KV
Reparing of 250 KVA DTR Stud , Bushing , Socket, Radiotor, Bether ,OTI WTI, Bhucholes gus kit, Oil Seal etc.
Rparing of Transformer Oil Filtering & Oil Filling.
Reparing of 250 KVA Transformer wending & Tap changer.
Overhauling
NEW SUB STATION
Main H.T panel comparing with switch gear (Make Southern switch gear Ltd.)
Reparing of H.T panel Like Contactor, Relay, Auto switch,volt meter,amp meter,oil change ,Fuse ,bus ber , bus coupleetc all complete.
800AMP (OCB)
Overhauling
L.T panel comparing with switch gear (Make Southern switch gear Ltd.)
Reparing of L.T panel Like Contactor, Relay, Auto switch,volt meter,amp meter,bus ber,Fuse , bus couple oil change etc all complete.
Overhauling
H.T panel comparing with switch gear VLE type
Reparing of H.T panel Like Contactor, Relay, Auto switch,volt meter,amp meter,bus ber etc all complete.
400Amp (OCB Ttype)
L.T panel comparing with switch gear .
Reparing of L.T panel Like Contactor, Relay, Auto switch,volt meter,amp meter,bus ber etc all complete.
800Amp (Oil circuit breaker )
400Amp (MCB)
400Amp (oil circuit Breaker)
COLLECTOR WELL
L.T panel comparing with switch gear .
Reparing of L.T panel Like Contactor, Relay, Auto switch,volt meter,amp meter,bus ber etc all complete.
2000Amp (oil circuit breaker )
1200Amp (oil circuit breaker )
800Amp (oil circuit breaker )
Overhauling
Reparing of main switch panel (HRC type) etc all complete.
Reparing of change over switch panel etc all complete.
Overhauling
Replacement of MCB.
Low Lift pump House
Reparing of submarshable panel Like Contactor, Relay, Auto switch,volt meter,amp meter
MCCB 3 pole :-
MCCB 4 pole :-
Reparing of Soft Drive starter
Reapring of conterol curcit with necessary wiring along with related work
reparing of Soft Drive type Starter
Supply and Installation of LT Cable
Supply of different Size1.1 KV Allimunium armoured cable 3 core
Supply and Installation of LT Cable
Supply of different Size1.1 KV Allimunium armoured cable 4 core
Supply and Laying of Different Size Control Cable/ power Cable
2.5 sqmm 4 core armoured Cu control Cable
2.5 sqmm 8 core armoured Cu control Cable
2.5 sqmm 12core armoured Cu control Cable
Supply and Laying of Different Size Control Cable/ power Cable
Supply & Laying of Non Armoured Control Cable
2 core cu cupper control cable
4 core cu cupper control cable
6core cu cupper control cable
7 core cu cupper control cable
8 core cu cupper control cable
12 core cu cupper control cable
13 core cu cupper control cable
15 core cu cupper control cable
17 core cu cupper control cable
supply & Fixing of Cable jointing kit
Straight Through Heatsinkable 1.1 kv 3 core kit
400 sq mm cable
300 sq mm cable
240 sq mm cable
185 sq mm cable
150 sq mm cable
120 sq mm cable
95 sq mm cable
70 sq mm cable
50 sq mm cable
25 sq mm Cable
16 sq mm Cable
supply & Fixing of Cable jointing kit
Straight Through Heat sinkable 1.1 kv 4 core kit
400 sq mm cable
300 sq mm cable
240 sq mm cable
185 sq mm cable
150 sq mm cable
120 sq mm cable
95 sq mm cable
70 sq mm cable
50 sq mm cable
25 sq mm Cable
16 sq mm Cable
Supply & Fixing of 11 KV Straight Through Cable Jointing KIT Heat sinkable
Straight Through Cableing kit
indoor type Cable Jointing Kit
Out Door Type Cable Jointing Kit
HOT/EOT Crain
Reparing of EOT/HOT Crain Mechinal Part
Reaparing of EOT Crain control panel like contractor Relay, non direction Relay Control curcuit etc.
Replace ment of Chain Rope
Repalcement of Limit Switch
Replacemnent of Remote Switch
Buscuplar Isolator type Breacker
Reapring of Bus Cuplar
Repar Isolator type breacker
Reparing of Soft Drive starter for High Lift pump House
Reapring of conterol curcit with necessary wiring along with related work
Reparing of Soft Drive type Starter
Repalcement of Amp meter
Repalcement Volt meter
Repalcement of HRC/HBC Fuse
Reparing of Panel Internal Light Wiring connection with MCB etc
Reparing capacitor Bank Panle
Reapring of Indicator contactor Etc
Reparing of Connection for PF Panel
Repalcement of MCB 4 Pole
Repalcement of MCB 3 Pole
Repalcement of MCB 2 Pole
Repalcement of MCB Single Pole
Repalcement of out door Terminal Box
Repalcement of out door type TTB Box
Repalcement of Out door type TTB
Supply & Fixing of compression Gland & socket
Supply & Fixing of compression Gland & socket
2 core cu cupper control cable
4 core cu cupper control cable
6core cu cupper control cable
7 core cu cupper control cable
8 core cu cupper control cable
12 core cu cupper control cable
13 core cu cupper control cable
15 core cu cupper control cable
17 core cu cupper control cable
300 HP pump Discharge Capacity 450 M3/HR Head 65M (Vertical turbine pump)
Replacement of line shaft with both side thread including all necessary materials & labour cost.
Replacement of bearing including all necessary labour cost. (SKF make)
Replacement of Shaft including all necessary materials & labour cost and transporting . (S.S make)
Replacement of impeller including all necessary materials & labour cost and transporting .
Gland Packing of pump including all necessary materials & labour cost when requried.
Replacement of Motor side Shaft.
Making shaft sleve long & short including lathe work.
Replacement of lylon rubber bush.
Replacement shaft adepter , body ring , pump bush, clip,including all complete..
Repairing of studus.
Replacement of Retainer .
Replacement of coupling tyre.
Supplying necessary nut bolts and gas kit when requried.
Column pipe 300mm dia (CI make) DF
Repairing and leath work for CI part of Pump when reqiried.
Overhauling
225KW Motor (3Phase induction type)
Replacement of motor side bearing including all necessary materials & labour cost (SKF make )
Replacement of motor side bearing Housing including all necessary materials & labour cost.
Rewinding of motor including Heat Varnish and re installation including transportation.
Rotar belacening and necessary alighment of motor including all.
Overhauling
175 HP pump Discharge Capacity 210 M3/HR Head 35M (Vertical turbine pump)
Replacement of line shaft with both side thread including all necessary materials & labour cost.
Replacement of bearing including all necessary labour cost. (SKF make)
Replacement of Shaft including all necessary materials & labour cost and transporting . (S.S make)
Replacement of impeller including all necessary materials & labour cost and transporting .
Gland Packing of pump including all necessary materials & labour cost when requried.
Replacement of Motor side Shaft.
Making shaft sleve long & short including lathe work.
Replacement of lylon rubber bush.
Replacement shaft adepter , body ring , pump bush, clip,including all complete..
Repairing of studus.
Replacement of Retainer .
Replacement of coupling tyre.
Supplying necessary nut bolts and gas kit when requried.
Column pipe 300mm dia (CI make) DF
Repairing and leath work for CI part of Pump when reqiried.
Overhauling
225KW Motor (3Phase induction type)
Replacement of motor side bearing including all necessary materials & labour cost (SKF make )
Replacement of motor side bearing Housing including all necessary materials & labour cost.
Rewinding of motor including Heat Varnish and re installation including transportation.
Rotar belacening and necessary alighment of motor including all.
Overhauling
40 HP pump Discharge Capacity 150 M3/HR Head 40M APPROX . (Centrifugal pump)
Replacement of bearing Housing including all necessary materials & labour cost.
Replacement of bearing including all necessary labour cost. (SKF make)
Replacement of Shaft including all necessary materials & labour cost and transporting . (S.S make)
Replacement of impeller including all necessary materials & labour cost and transporting .(GUN metal make)
Gland Packing of pump including all necessary materials & labour cost when requried.
shaft re metaling including transporting.
Making shaft sleve long & shaft sleve short including lathe work.
Replacement of lylon rubber o ring .
Replacement gland and gland bolt .
Repairing of body studus.
Replacement of coupling including all complete.
Replacement of coupling tyre.
Repairing Pump and Motor base plate making as per pump motor length as per site .
Re foundation of Pump / motor base including stag bolt and necessary civil work all complete.
Repairing and leath work for CI part of Pump when reqiried.
Overhauling
30 KW Motor (3 Phase induction type)
Replacement of motor side bearing including all necessary materials & labour cost (SKF make )
Replacement of motor side bearing Housing including all necessary materials & labour cost.
Rewinding of motor including Heat Varnish and re installation including transportation.
Rotar belacening and necessary alighment of motor including all.
Overhauling
65 HP pump Discharge Capacity 210 M3/HR Head 45M APPROX (Centrifugal pump)
Replacement of bearing Housing including all necessary materials & labour cost.
Replacement of bearing including all necessary labour cost. (SKF make)
Replacement of Shaft including all necessary materials & labour cost and transporting . (S.S make)
Replacement of impeller including all necessary materials & labour cost and transporting .(GUN metal make)
Gland Packing of pump including all necessary materials & labour cost when requried.
shaft re metaling including transporting.
Making shaft sleve long & shaft sleve short including lathe work.
Replacement of lylon rubber o ring .
Replacement gland and gland bolt .
Repairing of body studus.
Replacement of coupling including all complete.
Replacement of coupling tyre.
Repairing Pump and Motor base plate making as per pump motor length as per site .
Re foundation of Pump / motor base including stag bolt and necessary civil work all complete.
Repairing and leath work for CI part of Pump when reqiried.
Overhauling
50 KW Motor (3 Phase induction type)
Replacement of motor side bearing including all necessary materials & labour cost (SKF make )
Replacement of motor side bearing Housing including all necessary materials & labour cost.
Rewinding of motor including Heat Varnish and re installation including transportation.
Rotar belacening and necessary alighment of motor including all.
Overhauling
NEW HIGH LIFT
175 HP pump Discharge Capacity 326 M3/HR Head 110M APPROX (Centrifugal pump)
Replacement of bearing Housing including all necessary materials & labour cost.
Replacement of bearing including all necessary labour cost. (SKF make)
Replacement of Shaft including all necessary materials & labour cost and transporting . (S.S make)
Replacement of impeller including all necessary materials & labour cost and transporting .(GUN metal make)
Gland Packing of pump including all necessary materials & labour cost when requried.
shaft re metaling including transporting.
Making shaft sleve long & shaft sleve short including lathe work.
Replacement of lylon rubber o ring .
Replacement gland and gland bolt .
Repairing of body studus.
Replacement of coupling including all complete.
Replacement of coupling tyre.
Repairing Pump and Motor base plate making as per pump motor length as per site .
Re foundation of Pump / motor base including stag bolt and necessary civil work all complete.
Repairing and leath work for CI part of Pump when reqiried.
Overhauling
130 KW Motor (3 Phase induction type)
Replacement of motor side bearing including all necessary materials & labour cost (SKF make )
Replacement of motor side bearing Housing including all necessary materials & labour cost.
Rewinding of motor including Heat Varnish and re installation including transportation.
Rotar belacening and necessary alighment of motor including all.
Overhauling
120 HP pump Discharge Capacity 250 M3/HR Head 85M APPROX (Centrifugal pump)
Replacement of bearing Housing including all necessary materials & labour cost.
Replacement of bearing including all necessary labour cost. (SKF make)
Replacement of Shaft including all necessary materials & labour cost and transporting . (S.S make)
Replacement of impeller including all necessary materials & labour cost and transporting .(GUN metal make)
Gland Packing of pump including all necessary materials & labour cost when requried.
shaft re metaling including transporting.
Making shaft sleve long & shaft sleve short including lathe work.
Replacement of lylon rubber o ring .
Replacement gland and gland bolt .
Repairing of body studus.
Replacement of coupling including all complete.
Replacement of coupling tyre.
Repairing Pump and Motor base plate making as per pump motor length as per site .
Re foundation of Pump / motor base including stag bolt and necessary civil work all complete.
Repairing and leath work for CI part of Pump when reqiried.
Overhauling
90 KW Motor (3 Phase induction type)
Replacement of motor side bearing including all necessary materials & labour cost (SKF make )
Replacement of motor side bearing Housing including all necessary materials & labour cost.
Rewinding of motor including Heat Varnish and re installation including transportation.
Rotar belacening and necessary alighment of motor including all.
Overhauling
100 HP pump Discharge Capacity 190 M3/HR Head 75M APPROX (Centrifugal pump)
Replacement of bearing Housing including all necessary materials & labour cost.
Replacement of bearing including all necessary labour cost. (SKF make)
Replacement of Shaft including all necessary materials & labour cost and transporting . (S.S make)
Replacement of impeller including all necessary materials & labour cost and transporting .(GUN metal make)
Gland Packing of pump including all necessary materials & labour cost when requried.
shaft re metaling including transporting.
Making shaft sleve long & shaft sleve short including lathe work.
Replacement of lylon rubber o ring .
Replacement gland and gland bolt .
Repairing of body studus.
Replacement of coupling including all complete.
Replacement of coupling tyre.
Repairing Pump and Motor base plate making as per pump motor length as per site .
Re foundation of Pump / motor base including stag bolt and necessary civil work all complete.
Repairing and leath work for CI part of Pump when reqiried.
Overhauling
75 KW Motor (3 Phase induction type)
Replacement of motor side bearing including all necessary materials & labour cost (SKF make )
Replacement of motor side bearing Housing including all necessary materials & labour cost.
Rewinding of motor including Heat Varnish and re installation including transportation.
Rotar belacening and necessary alighment of motor including all.
Overhauling
80 HP pump Discharge Capacity 168 M3/HR Head 60M APPROX (Centrifugal pump)
Replacement of bearing Housing including all necessary materials & labour cost.
Replacement of bearing including all necessary labour cost. (SKF make)
Replacement of Shaft including all necessary materials & labour cost and transporting . (S.S make)
Replacement of impeller including all necessary materials & labour cost and transporting .(GUN metal make)
Gland Packing of pump including all necessary materials & labour cost when requried.
shaft re metaling including transporting.
Making shaft sleve long & shaft sleve short including lathe work.
Replacement of lylon rubber o ring .
Replacement gland and gland bolt .
Repairing of body studus.
Replacement of coupling including all complete.
Replacement of coupling tyre.
Repairing Pump and Motor base plate making as per pump motor length as per site .
Re foundation of Pump / motor base including stag bolt and necessary civil work all complete.
Repairing and leath work for CI part of Pump when reqiried.
Overhauling
60 KW Motor (3 Phase induction type)
Replacement of motor side bearing including all necessary materials & labour cost (SKF make )
Replacement of motor side bearing Housing including all necessary materials & labour cost.
Rewinding of motor including Heat Varnish and re installation including transportation.
Rotar belacening and necessary alighment of motor including all.
Overhauling
75 HP pump Discharge Capacity 145 M3/HR Head 60M APPROX (Centrifugal pump)
Replacement of bearing Housing including all necessary materials & labour cost.
Replacement of bearing including all necessary labour cost. (SKF make)
Replacement of Shaft including all necessary materials & labour cost and transporting . (S.S make)
Replacement of impeller including all necessary materials & labour cost and transporting .(GUN metal make)
Gland Packing of pump including all necessary materials & labour cost when requried.
shaft re metaling including transporting.
Making shaft sleve long & shaft sleve short including lathe work.
Replacement of lylon rubber o ring .
Replacement gland and gland bolt .
Repairing of body studus.
Replacement of coupling including all complete.
Replacement of coupling tyre.
Repairing Pump and Motor base plate making as per pump motor length as per site .
Re foundation of Pump / motor base including stag bolt and necessary civil work all complete.
Repairing and leath work for CI part of Pump when reqiried.
Overhauling
60 KW Motor (3 Phase induction type)
Replacement of motor side bearing including all necessary materials & labour cost (SKF make )
Replacement of motor side bearing Housing including all necessary materials & labour cost.
Rewinding of motor including Heat Varnish and re installation including transportation.
Rotar belacening and necessary alighment of motor including all.
Overhauling
17.5 HP Pump - Motor Discharge Capacity 50 M3/HR , Head 35M and above APPROX . (KSB and texmo make Sub-mersible pump )
Repairing of pump including bearing, shaft,impeller,bearing housing , including all complete . ( Also replacement of necessary part when requried)
Rewinding of motor including rotar blanceing , electrical connector , including all complete .( Also replacement of necessary part when requried)
15 HP Pump - Motor Discharge Capacity 40 M3/HR , Head 35M and above APPROX . (KSB and texmo make Sub-mersible pump )
Repairing of pump including bearing, shaft,impeller,bearing housing , including all complete . ( Also replacement of necessary part when requried)
Rewinding of motor including rotar blanceing , electrical connector , including all complete .( Also replacement of necessary part when requried)
Overhauling
10 HP Pump - Motor Discharge Capacity 35 M3/HR , Head 35M and above APPROX . (KSB and texmo make Sub-mersible pump )
Repairing of pump including bearing, shaft,impeller,bearing housing , including all complete . ( Also replacement of necessary part when requried)
Rewinding of motor including rotar blanceing , electrical connector , including all complete .( Also replacement of necessary part when requried)
Overhauling
20 HP Pump - Motor Discharge Capacity 60 M3/HR , Head 35M and above APPROX . (KSB and texmo make Sub-mersible pump ) for raw water use.
Repairing of pump including bearing, shaft,impeller,bearing housing , including all complete . ( Also replacement of necessary part when requried)
Rewinding of motor including rotar blanceing , electrical connector , including all complete .( Also replacement of necessary part when requried)
Overhauling
25 HP Pump - Motor Discharge Capacity 60 M3/HR , Head 30M and above APPROX . (KSB and texmo make open well Sub-mersible pump ) for raw water use.
Repairing of pump including bearing, shaft,impeller,bearing housing , including all complete . ( Also replacement of necessary part when requried)
Rewinding of motor including rotar blanceing , electrical connector , including all complete .( Also replacement of necessary part when requried)
15 HP Pump - Motor Discharge Capacity 40 M3/HR , Head 30M and above APPROX . (KSB and texmo make open well Sub-mersible pump ) for raw water use.
Repairing of pump including bearing, shaft,impeller,bearing housing , including all complete . ( Also replacement of necessary part when requried)
Rewinding of motor including rotar blanceing , electrical connector , including all complete .( Also replacement of necessary part when requried)
Overhauling
ISMILE CWR
Transformer 750 KVA 11/.4 KV (Oil cool )
Reparing of 750 KVA DTR Stud , Bushing , Socket, Radiotor, Bether ,OTI WTI, Bhucholes gas kit, Oil Seal etc.
Rparing of Transformer Oil Filtering & Oil Filling.
Reparing of 750 KVA Transformer wending & Tap changer.
Overhauling
Main H.T Oparetaor panel comparing with switch gear.
Reparing of H.T panel Like Contactor, Relay, Auto switch,volt meter,amp meter,oil change ,Fuse ,bus ber, bus couple etc all complete.
Overhauling
L.T panel comparing with switch gear.
Reparing of L.T panel Like Contactor, Relay, Auto switch,volt meter,amp meter,oil change ,Fuse,bus ber , bus coupler etc all complete.
Overhauling
Maintenance of Lighting L.T panel comparing with switch gear.
Reparing of Lighting L.T panel Like Contactor, Relay, Auto switch,volt meter,amp meter,oil change ,Fuse,bus ber etc all complete.
Supplying fitting fixing Main switch including all complete .(HRC type)
Maintenance of Pump Starter MCCB type ,DTA starter connector , 3 Phase 440 volt, ML12,ML10,ML6,ML140,ML100 including all complete.
200Amp(ADDA ROOM)
Reparing and Replacement of Soft Drive starter .
Reapring of conterol curcit with necessary wiring along with related work
Reparing of Soft Drive type Starter
Repalcement of Amp meter
Repalcement Volt meter
Repalcement of HRC/HBC Fuse
Reparing of Panel Internal Light Wiring connection with MCB etc
Reparing capacitor Bank Panle.
Reapring of Indicator contactor Etc
Reparing of Connection for PF Panel
100 HP pump Discharge Capacity 302 M3/HR Head 57M approx . (Centrifugal pump) ADDA.
Replacement of bearing Housing including all necessary materials & labour cost.
Replacement of bearing including all necessary labour cost. (SKF make)
Replacement of Shaft including all necessary materials & labour cost and transporting . (S.S make)
Replacement of impeller including all necessary materials & labour cost and transporting .(GUN metal make)
Gland Packing of pump including all necessary materials & labour cost when requried.
shaft re metaling including transporting.
Making shaft sleve long & shaft sleve short including lathe work.
Replacement of lylon rubber o ring .
Replacement gland and gland bolt .
Repairing of body studus.
Replacement of coupling including all complete.
Replacement of coupling tyre.
Repairing Pump and Motor base plate making as per pump motor length as per site .
Re foundation of Pump / motor base including stag bolt and necessary civil work all complete.
Repairing and leath work for CI part of Pump when reqiried.
Overhauling
75 KW Motor (3 Phase induction type)
Replacement of motor side bearing including all necessary materials & labour cost (SKF make )
Replacement of motor side bearing Housing including all necessary materials & labour cost.
Rewinding of motor including Heat Varnish and re installation including transportation.
Rotar belacening and necessary alighment of motor including all.
Overhauling
75 HP pump Discharge Capacity 275 M3/HR Head 45M approx . (Centrifugal pump)
Replacement of bearing Housing including all necessary materials & labour cost.
Replacement of bearing including all necessary labour cost. (SKF make)
Replacement of Shaft including all necessary materials & labour cost and transporting . (S.S make)
Replacement of impeller including all necessary materials & labour cost and transporting .(GUN metal make)
Gland Packing of pump including all necessary materials & labour cost when requried.
shaft re metaling including transporting.
Making shaft sleve long & shaft sleve short including lathe work.
Replacement of lylon rubber o ring .
Replacement gland and gland bolt .
Repairing of body studus.
Replacement of coupling including all complete.
Replacement of coupling tyre.
Repairing Pump and Motor base plate making as per pump motor length as per site .
Re foundation of Pump / motor base including stag bolt and necessary civil work all complete.
Repairing and leath work for CI part of Pump when reqiried.
Overhauling
55 KW Motor (3 Phase induction type)
Replacement of motor side bearing including all necessary materials & labour cost (SKF make )
Replacement of motor side bearing Housing including all necessary materials & labour cost.
Rewinding of motor including Heat Varnish and re installation including transportation.
Rotar belacening and necessary alighment of motor including all.
Overhauling
65 HP pump Discharge Capacity 210 M3/HR Head 96M approx . (Centrifugal pump)
Replacement of bearing Housing including all necessary materials & labour cost.
Replacement of bearing including all necessary labour cost. (SKF make)
Replacement of Shaft including all necessary materials & labour cost and transporting . (S.S make)
Replacement of impeller including all necessary materials & labour cost and transporting .(GUN metal make)
Gland Packing of pump including all necessary materials & labour cost when requried.
shaft re metaling including transporting.
Making shaft sleve long & shaft sleve short including lathe work.
Replacement of lylon rubber o ring .
Replacement gland and gland bolt .
Repairing of body studus.
Replacement of coupling including all complete.
Replacement of coupling tyre.
Repairing Pump and Motor base plate making as per pump motor length as per site .
Re foundation of Pump / motor base including stag bolt and necessary civil work all complete.
Repairing and leath work for CI part of Pump when reqiried.
Overhauling
45 KW Motor (3 Phase induction type)
Replacement of motor side bearing including all necessary materials & labour cost (SKF make )
Replacement of motor side bearing Housing including all necessary materials & labour cost.
Rewinding of motor including Heat Varnish and re installation including transportation.
Rotar belacening and necessary alighment of motor including all.
Overhauling
60 HP pump Discharge Capacity 210 M3/HR Head 52M approx . (Centrifugal pump)
Replacement of bearing Housing including all necessary materials & labour cost.
Replacement of bearing including all necessary labour cost. (SKF make)
Replacement of Shaft including all necessary materials & labour cost and transporting . (S.S make)
Replacement of impeller including all necessary materials & labour cost and transporting .(GUN metal make)
Gland Packing of pump including all necessary materials & labour cost when requried.
shaft re metaling including transporting.
Making shaft sleve long & shaft sleve short including lathe work.
Replacement of lylon rubber o ring .
Replacement gland and gland bolt .
Repairing of body studus.
Replacement of coupling including all complete.
Replacement of coupling tyre.
Repairing Pump and Motor base plate making as per pump motor length as per site .
Re foundation of Pump / motor base including stag bolt and necessary civil work all complete.
Repairing and leath work for CI part of Pump when reqiried.
Overhauling
40 KW Motor (3 Phase induction type)
Replacement of motor side bearing including all necessary materials & labour cost (SKF make )
Replacement of motor side bearing Housing including all necessary materials & labour cost.
Rewinding of motor including Heat Varnish and re installation including transportation.
Rotar belacening and necessary alighment of motor including all.
Overhauling
50 HP pump Discharge Capacity 210 M3/HR Head 48M approx . (Centrifugal pump)
Replacement of bearing Housing including all necessary materials & labour cost.
Replacement of bearing including all necessary labour cost. (SKF make)
Replacement of Shaft including all necessary materials & labour cost and transporting . (S.S make)
Replacement of impeller including all necessary materials & labour cost and transporting .(GUN metal make)
Gland Packing of pump including all necessary materials & labour cost when requried.
shaft re metaling including transporting.
Making shaft sleve long & shaft sleve short including lathe work.
Replacement of lylon rubber o ring .
Replacement gland and gland bolt .
Repairing of body studus.
Replacement of coupling including all complete.
Replacement of coupling tyre.
Repairing Pump and Motor base plate making as per pump motor length as per site .
Re foundation of Pump / motor base including stag bolt and necessary civil work all complete.
Repairing and leath work for CI part of Pump when reqiried.
Overhauling
35 KW Motor (3 Phase induction type)
Replacement of motor side bearing including all necessary materials & labour cost (SKF make )
Replacement of motor side bearing Housing including all necessary materials & labour cost.
Rewinding of motor including Heat Varnish and re installation including transportation.
Rotar belacening and necessary alighment of motor including all.
Overhauling.
HOT/EOT Crain
Reparing of EOT/HOT Crain Mechinal Part.
Reaparing of EOT Crain control panel like contractor Relay, non direction Relay Control curcuit etc.
Replacement of Chain Rope.
Repalcement of Limit Switch.
Replacemnent of Remote Switch.
Overhaluing.
Different typr of Pump-motor at rotor , alum mixture , cholorine doesing etc .(0.5HP to 05HP)
Reapiring and maintenance of different type Pump-motor including shaft, impeller , rotor,rewinding of motor and refixing the same .
Repairing of Pipe line (type DI/CI/MS/GI/AC/Hume) including cutting of soil, welding ,gas cutting, grinding, balling out of water ,necessary specials(DI or CI) ,dismentaling joint ,rubber sheet , nut-bolts,washer,drilled flange , hairing of JCB and haydra when requried ,necessary lighting incluneded labour and mistri cherges as per direction of EIC.
Above ground
Upto 1.5Mtr from G.L
Upto 3mtr and above
Repairing and Maintenance of sluice valve like gland packing,lock nut replacement , spindle replacement ,necessary lathe work and providing rubber sheet , nut bolts, opening and re fixing the same including labour charges & all complete.
Replacement of NRV including fitting and fixing including all complete .
Supply and delivery of Alum and Chlorine at site .
Supply of best quality ALUM including loading-unloading and transportion .
Supply of Gasious chlorine including filling ,loading-unloading and transportion .(Toner capacity 900kg)
Maintenance of Guest House .
Clening of Guest house including providing all existing electrical item like Fan , Light , 2 Nos. AC, & Bed, table , chair ,all type of plambing work all complete .
Providing of labour.
Providing of labour for sladge Clening from Repid slow sand filter bed when requried including all complete .
Providing of labour for sladge Clening from sedimentation tank when requried including all complete.
Providing of labour for Clening of clarifier when requried including all complete .
Providing of labour for Clening of low lift well when requried including all complete .
Providing of labour for Clening of pump house premises and necessary jungal cutting and all complete .
Clening of sand from stilling chamber through Syphon including jcb and tractor for shiftng the sand to out side of pump house as per EIC.
Providing of labour for Clening of flot valve when requried including all complete .
Providing of labour for Clening of Raw water flot valve and open well submersible pump suction side when requried including all complete .
Clening and shifting of sand from collector well.
Clening and shifting of sand from inside of collector well including necessary civil work all complete as per EIC. (Ones in a year )
Providing chain mounted excavator (200) for shifting sand when requried as per EIC.
For Making Bandh also shifting the sand serrounding of low lift intake well when requried as per EIC.
Gardening
Maintenance of Garden incluidng providing flower tree , Hez tree etc & also provided one no Mali.
Indore and outdore lighting
Repairing ,Maintenance and Replacement of 100 Nos. Led Bulb, Tube light 215 Nos. , Sodium vapour 102 Nos. , Metal 31 Nos. , LED light 03 , Fan 10 Nos. , Exhaust Fan 40 Nos. , hight mast light -01 No., Invater with battery and existing wairing , switch board etc all complete.
INDUSTRIAL ELECTRICAL CORPORATION
EASTERN INDIA SALES AND SERVICE
A.CONSTRUCTION CO.
SONA ENTERPRISE
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .