Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹283.3 CrAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹316.7 Cr+₹33.4 Cr (11.8%)Rejected-Finance 1148 E SYKES EXTENSION KOLHAPUR 416001 | KOLHAPUR | KOLHAPUR | MAHARASHTRA | 416001 | L2 | Rejected-Finance L2 | |
| 3 | Rejected-Technical | - | Rejected-Technical Not_Eligible |
Tender Value
₹247.4 Cr
EMD Value
₹1.2 Cr
Closing Date
4 Mar 2024, 5:00 pmClosed
The Chief Officer
Municipal Council Barshi
AUGMENTATION OF EXISTING BARSHI WATER SUPPLY SCHEME FROM UJJANI DAM - PHASE II,DIST SOLAPUR UNDER AMRUT 2.0
2024_DMA_995854_1
202324_BNP_Water_Notice_08
Open Tender
Civil Works - Water Works
Percentage
540 days
Barshi
Please refer Tender documents.
2 documents required · 2 mandatory
₹1.3 L
₹1.2 Cr
Municipal Council Barshi
15 Mar 2024
3 Feb 2024
5 Mar 2024
3 Feb 2024
4 Mar 2024
3 Feb 2024
12 Feb 2024
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Subwork No 1 Approach Channel Length - 50 Meter
Item No 1
Excavation in general in soft material comprising of soft soil, soft murum, sand, hard murum with boulders in wet or dry condition for Head Works i.e. Intake Well, Connecting Pipe, Jack Well, Pump House, Supply Well, etc. for lift 0 to 1.5 M and lead of 150 M including baricating, gurading, disposing off surplus excavated stuff within a radius of 0.5 km. as directed by Engineer-in- charge, etc. complete excluding refilling.
For Head Works on river or dam submergence for initial lift of 0 to 1.5 M RL 486.00 to RL 484.5 | 337.5 | Cum | 464 | ₹1,56,600 |
| 2 | Item No 2
Excavation in general in hard material comprising of soft rock, hard rock, Manjara rock, etc, by blasting / controlled blasting, chiselling as required in wet or dry condition for Head Works i.e. Intake Well, Connecting Pipe, Jack Well, Pump House, supply Well, etc. for lift 0 to 1.5 M and lead of 150 M including baricading, guarding, disposing off surplus excavated stuff within a radius of 0.5 km. as directed by Engineer-in-charge, excluding refilling.
For Head Works on river or dam sub mergence for initial lift of 0 to 1.5 M
lift 1.5 m to 3 m RL 484.5 to 483.0 | 262.5 | Cum | 1,044 | ₹2,74,050 |
| 3 | Excavation in general in hard material comprising of soft rock, hard rock, Manjara rock, etc, by blasting / controlled blasting, chiselling as required in wet or dry condition for Head Works i.e. Intake Well, Connecting Pipe, Jack Well, Pump House, supply Well, etc. for lift 0 to 1.5 M and lead of 150 M including baricading, guarding, disposing off surplus excavated stuff within a radius of 0.5 km. as directed by Engineer-in-charge, excluding refilling.
For Head Works on river or dam sub mergence for
lift 3 m to 4.5 m RL 483.0 to RL 481.5 | 187.5 | Cum | 1,072 | ₹2,01,000 |
| 4 | Excavation in general in hard material comprising of soft rock, hard rock, Manjara rock, etc, by blasting / controlled blasting, chiselling as required in wet or dry condition for Head Works i.e. Intake Well, Connecting Pipe, Jack Well, Pump House, supply Well, etc. for lift 0 to 1.5 M and lead of 150 M including baricading, guarding, disposing off surplus excavated stuff within a radius of 0.5 km. as directed by Engineer-in-charge, excluding refilling.
For Head Works on river or dam sub mergence for
lift 4.5 m to 6 m RL 481.5 to 480.0 | 112.5 | Cum | 1,100 | ₹1,23,750 |
| 5 | Excavation in general in hard material comprising of soft rock, hard rock, Manjara rock, etc, by blasting / controlled blasting, chiselling as required in wet or dry condition for Head Works i.e. Intake Well, Connecting Pipe, Jack Well, Pump House, supply Well, etc. for lift 0 to 1.5 M and lead of 150 M including baricading, guarding, disposing off surplus excavated stuff within a radius of 0.5 km. as directed by Engineer-in-charge, excluding refilling.
For Head Works on river or dam sub mergence for
lift 6 m to 7.5 m RL 480.00 to 479.0 | 75 | Cum | 1,128 | ₹84,600 |
| 6 | Item No 3
Disposing surplus material beyond 5 km distance including loading, unloading and transporting etc complete
Total excavation | 975 | Cum | 360.05 | ₹3,51,048.75 |
| 7 | Item No 4
Dewatering charges for estimation purpose for head works in river basin or dam
a) Approach channel | 50 | Rmt | 6,219 | ₹3,10,950 |
| 8 | Subwork No 2 - Coffer Dam
Item No 1
Providing, constructing coffer dam in river basin / dam storages as per type design including excavation, filling the middle portion with B.C. soil (in gunny bags if required). Providing impervious / semipervious materials on both sides of B.C. soil (in gunny bags if required) including ramming, compacting to the satisfaction of Engineer-in-charge till the completion of work including dismantling coffer dam after completion of works and disposing off the material as directed by the Engineer-in-charge.
Note : Pay line maximum. Top width payable shall be 2 Mtr. and maximum payable side slopes shall be 1.5 horizontal to 1 vertical, if the constructed top width of the side slopes are less, then the measurements at actual are payable. Extra top width or flat slopes are not payable. Contractor is free to use ballies, plastic sheets, piles, pipes, CGI sheets for supporting hearting materials instead of impervious/ semi-pervious hearting materials for which no extra payments shall be payable. 30% payment shall be withheld for dismantling of coffer dam. This foot note shall appear in tender condition. (Type section is shown on last page of type design section of CSR).
Coffer Dam is considered for Approach channel , Jack well & Approach bridge | 12,336.25 | cum | 682 | ₹84,13,322.5 |
| 9 | Subwork 3 Jack Well & Pump House
Item No 1
Excavation in general in soft material comprising of soft soil, soft murum, sand, hard murum with boulders in wet or dry condition for Head Works i.e. Intake Well, Connecting Pipe, Jack Well, Pump House, Supply Well, etc. for lift 0 to 1.5 M and lead of 150 M including baricating, gurading, disposing off surplus excavated stuff within a radius of 0.5 km. as directed by Engineer-in- charge, etc. complete excluding refilling.
For Head Works on river or dam submergence for initial lift of 0 to 1.5 M
lift 0 to 1.5 m from RL 486.01 to RL 484.500 | 990.78 | Cum | 464 | ₹4,59,722.89 |
| 10 | Excavation in general in soft material comprising of soft soil, soft murum, sand, hard murum with boulders in wet or dry condition for Head Works i.e. Intake Well, Connecting Pipe, Jack Well, Pump House, Supply Well, etc. for lift 0 to 1.5 M and lead of 150 M including baricating, gurading, disposing off surplus excavated stuff within a radius of 0.5 km. as directed by Engineer-in- charge, etc. complete excluding refilling.
lift 1.5 to 3 m from RL 484.50 to RL 483.000 | 923.63 | Cum | 491 | ₹4,53,502.53 |
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
BOQ_1740732.xls
BOQ • 1.40 MB
138702695.pdf
Tender Documents • 0.11 MB
138702697.html
Tender Documents • 0.03 MB
AffidavitAndParishishtaA.pdf
Tender Documents • 0.29 MB
TenderDoc.pdf
Tender Documents • 20.10 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .