Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.9 LAdmitted-Finance | ₹6.9 L | L1 | Admitted-Finance |
| 2 | L2₹7.0 L+₹11,820.06 (1.71%)Admitted-Finance | ₹7.0 L+₹11,820.06 (1.71%) | L2 | Admitted-Finance |
| 3 | L3₹7.9 L+₹98,659.80 (14.2%)Admitted-Finance | ₹7.9 L+₹98,659.80 (14.2%) | L3 | Admitted-Finance |
| 4 | L4₹7.9 L+₹1.0 L (14.4%)Admitted-Finance TAMIL NADU | TIRUVANNAMALAI | TAMIL NADU | 604401 | ₹7.9 L+₹1.0 L (14.4%) | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | R.SHANTHA L2 | S.Krishnamourthi L1 | K RAMESH L3 | KUMAR L4 |
|---|---|---|---|---|---|---|---|
| 1.00Construction of New grain storage at Thuraiperumbakkam Village H/O Thuraiperumbakkam Panchayat | |||||||
| 2.00 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundasan | 22.86 | CUM | 250 ₹5,715 | 180 ₹4,115 Lowest | 250 ₹5,715 | 300 ₹6,858 |
| 3.00 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 6.39 | CUM | 5,500 ₹35,145 | 4,400 ₹28,116 Lowest | 5,433.62 ₹34,721 | 5,433.62 ₹34,721 |
| 4.00 | Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc. | 19.78 | CUM | 5,800 ₹1,14,724 Lowest | 6,400 ₹1,26,592 | 6,178.59 ₹1,22,213 | 6,178.59 ₹1,22,213 |
| 5.00 | RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc. | 14.98 | CUM | 8,200 ₹1,22,836 | 6,800 ₹1,01,864 Lowest | 9,167.19 ₹1,37,325 | 9,167.19 ₹1,37,325 |
| 6.00 | Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. | 24.17 | SQM | 900 ₹21,753 | 420 ₹10,151 Lowest | 547.5 ₹13,233 | 547.5 ₹13,233 |
| 7.00 | Above GL | 85.88 | SQM | 500 ₹42,940 Lowest | 780 ₹66,986 | 1,095 ₹94,039 | 1,095 ₹94,039 |
| 8.00 | Supply and fabrication of steel including cost and conveyance and alla labour charges etc. complete. | 2.1 | MT | 90,000 ₹1,89,000 | 88,000 ₹1,84,800 Lowest | 91,902.66 ₹1,92,996 | 91,902.66 ₹1,92,996 |
| 9.00 | Supplying and fabrication of the following rolling Shutters including cost and conveyanceand all charges etc complete. | 4.2 | SQM | 2,000 ₹8,400 Lowest | 2,600 ₹10,920 | 2,171 ₹9,118 | 2,171 ₹9,118 |
| 10.00 | Plastering with cement mortar 1:5, 12mm thick including cost and conveyance and all labour charges etc. | 118.98 | SQM | 250 ₹29,745 Lowest | 260 ₹30,935 | 283.45 ₹33,725 | 283.45 ₹33,725 |
Tender Value
₹8 L
EMD Value
₹8,000
Closing Date
22 Sept 2026, 3:00 pmClosed
Block Development Office (BP)
Block Development Office KAVERIPAKKAM
Construction of New Grain Storage at Thuraiperumbakkam village in Thuraiperumbakkam PanchayatThuraiperumbakkam PanchayatThuraiperumbakkam Panchayat
2026_RDTN_701958_1
A2/2000/2026
Open Tender
Civil Works
Item Rate
Block Development Office
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹8,000
Yes
23 Sept 2026
8 Sept 2026
22 Sept 2026
8 Sept 2026
22 Sept 2026
8 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of New grain storage at Thuraiperumbakkam Village H/O Thuraiperumbakkam Panchayat | - | - | - | - |
| 2 | Earth work excavation and depositing on bank with initial lead and lift in hard gravelly soil, hard stiff clay, black cotton soil, hard red earth,shales, murram, and earth muds with 50% fair sized boulders as per SS 20B for narrow foundasan | 22.86 | CUM | 263.78 | ₹6,030.01 |
| 3 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 6.39 | CUM | 5,433.62 | ₹34,720.83 |
| 4 | Brick work in C.M 1:5 mix using country bricks incuding cost and conveyance and all labour charges etc. | 19.78 | CUM | 6,178.59 | ₹1,22,212.51 |
| 5 | RCC 1:1.5:3 mix using 20mm metal including cost and conveyance and all labour charges etc. | 14.98 | CUM | 9,167.19 | ₹1,37,324.51 |
| 6 | Supplying and errecting for sides & soffits including supports and strutting upto 3.29m height for plane surface in all floors including cost and conveyance and all labour charges etc. | 24.17 | SQM | 547.5 | ₹13,233.08 |
| 7 | Above GL | 85.88 | SQM | 1,095 | ₹94,038.6 |
| 8 | Supply and fabrication of steel including cost and conveyance and alla labour charges etc. complete. | 2.1 | MT | 91,902.66 | ₹1,92,995.59 |
| 9 | Supplying and fabrication of the following rolling Shutters including cost and conveyanceand all charges etc complete. | 4.2 | SQM | 2,171 | ₹9,118.2 |
| 10 | Plastering with cement mortar 1:5, 12mm thick including cost and conveyance and all labour charges etc. | 118.98 | SQM | 283.45 | ₹33,724.88 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.47 MB
BOQ_843844.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .