| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 LAccepted-AOC | ₹3.9 L | L1 | Accepted-AOC BELOW |
| 2 | L2₹4.0 L+₹11,676.30 (3.02%)Rejected-AOC | ₹4.0 L+₹11,676.30 (3.02%) | L2 | Rejected-AOC ABOVE |
| Sl No | Description | Qty | Unit | PERIYASAMY ATTHIKUNNA ESTATE KESAVAN L1 | KASTHURI SHANMUGAM L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling Plain Cement Concrete including all Labour cost as directed by departmental officers etc., complete asper standard specification. For Drain | 6.72 | M3 | 520 ₹3,494.4 Lowest | 620 ₹4,166.4 |
| 2.00 | Earthwork excavation for foundation in all soils and sub soils except hard rock requiring blasting with initial lead and lift including re-filling the sides of foundation in layer of 15 cm thick watering , ramming ,depositing the surplus earth in the premises as directed by departmental officers etc., complete asper standard specification. For Drain | 26.48 | M3 | 160 ₹4,236.8 Lowest | 180 ₹4,766.4 |
| 3.00 | Plain cement concrete in mix 1:4:8 ( One cement , four sand and eight aggregate) using 40 mm BSS HBG metal including cost and conveyence of all meterials to work site and labour charges for mixing, laying, curing etc complete as per the standard specification. | 7.87 | M3 | 5,325 ₹41,907.75 Lowest | 5,425 ₹42,694.75 |
| 4.00 | Providing centering for sides and soffits of R.C.C.works such as lintels, slab that beams plain surface etc., complete excluding strutting upto 3.30 M height using mild steel sheet of size 90 c.m x 60 c.m and 10 gauge stifer with M.S. angles of size 25 mm x 25 mm x 3mm laid over silver w.c.wood joints of size 10 c.m. x 6 c.m. spaced at about 90 c.m. c/c and supported by casurins props of 10 c.m. to 13 c.m. dia spaced 75 c.m. centre to centre complying with as per standard specification. for side wall. | 67.6 | M2 | 525 ₹35,490 Lowest | 535 ₹36,166 |
| 4.10 | For Slab | 5.24 | M2 | 1,085 ₹5,685.4 Lowest | 1,100 ₹5,764 |
| 5.00 | Cement concrete in 1:2:4 [one cement and two sand and aggregate using 20mm size ISS grade machine crushed metal including the cost of mixing laying curing etc., complete complying with standard specification. | 13.7 | M3 | 6,617 ₹90,652.9 Lowest | 6,700 ₹91,790 |
| 6.00 | Supply and Fixing of Pre Cast Slab 75mm Thick .including centering and cost of steel and cement concrete ect., including all labour charges . | 134 | M2 | 1,110 ₹1,48,740 Lowest | 1,150 ₹1,54,100 |
| 7.00 | Supply and fabrication of steel rod required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the roads straightening, cutting, bending, tying, including over lapping to the required length whereever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete as per standard specification. | 90 | KG | 91.5 ₹8,235 Lowest | 95 ₹8,550 |
| 8.00 | Reinforced cement concrete 1:1 1/2 :3 mix (One cement, one and a half sand and three aggregate) mix for all reinfoced cement concrete works using 20 mm ISS gauge hard broken grainte machine crushed metal including cost and conveyance of all materials at site including all labour charges for concrete mixing, laying, watering, curing properly but excluding cost of steel and centering etc., complete complying with standard specifications. | 1.2 | M3 | 7,910 ₹9,492 Lowest | 7,950 ₹9,540 |
| 9.00 | Plastering with cement mortar 1:5 (One part of Cement and Five part of Plastering Sand (P- Sand)) 12mm, thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications | 138.2 | M2 | 280 ₹38,696 Lowest | 295 ₹40,769 |
Tender Value
₹4.7 L
EMD Value
₹4,700
Closing Date
13 Feb 2026, 3:00 pmClosed
COMMISSIONER
KARAMADAI
Reapir and Maintanace Work of Drain at Ward no 6 Bujjinga gowder 5th cross road 167006L006 Bujjinga Gowder North 4th Cross Road 167006R1206 Bujjinga gowder 2nd cross road 167006L005 Area in Karamadai Muncipality
2026_MAWS_656220_1
5209/2025/E1
Open Tender
Maintenance Works
Works
KARAMADAI MUNICIPALITY
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹4,700
1 Sept 2026
12 Feb 2026
13 Feb 2026
12 Feb 2026
13 Feb 2026
12 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling Plain Cement Concrete including all Labour cost as directed by departmental officers etc., complete asper standard specification. For Drain | 6.72 | M3 | 1.25 | ₹8.4 |
| 2 | Earthwork excavation for foundation in all soils and sub soils except hard rock requiring blasting with initial lead and lift including re-filling the sides of foundation in layer of 15 cm thick watering , ramming ,depositing the surplus earth in the premises as directed by departmental officers etc., complete asper standard specification. For Drain | 26.48 | M3 | 2.25 | ₹59.58 |
| 3 | Plain cement concrete in mix 1:4:8 ( One cement , four sand and eight aggregate) using 40 mm BSS HBG metal including cost and conveyence of all meterials to work site and labour charges for mixing, laying, curing etc complete as per the standard specification. | 7.87 | M3 | 3.25 | ₹25.58 |
| 4 | Providing centering for sides and soffits of R.C.C.works such as lintels, slab that beams plain surface etc., complete excluding strutting upto 3.30 M height using mild steel sheet of size 90 c.m x 60 c.m and 10 gauge stifer with M.S. angles of size 25 mm x 25 mm x 3mm laid over silver w.c.wood joints of size 10 c.m. x 6 c.m. spaced at about 90 c.m. c/c and supported by casurins props of 10 c.m. to 13 c.m. dia spaced 75 c.m. centre to centre complying with as per standard specification. for side wall. | 67.6 | M2 | 4.25 | ₹287.3 |
| 4.1 | For Slab | 5.24 | M2 | 5.25 | ₹27.51 |
| 5 | Cement concrete in 1:2:4 [one cement and two sand and aggregate using 20mm size ISS grade machine crushed metal including the cost of mixing laying curing etc., complete complying with standard specification. | 13.7 | M3 | 6.25 | ₹85.63 |
| 6 | Supply and Fixing of Pre Cast Slab 75mm Thick .including centering and cost of steel and cement concrete ect., including all labour charges . | 134 | M2 | 7.25 | ₹971.5 |
| 7 | Supply and fabrication of steel rod required for all RCC items of works involved in the schedule cost of steel at site fabrication, labour charges for cleaning the roads straightening, cutting, bending, tying, including over lapping to the required length whereever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete as per standard specification. | 90 | KG | 8.25 | ₹742.5 |
| 8 | Reinforced cement concrete 1:1 1/2 :3 mix (One cement, one and a half sand and three aggregate) mix for all reinfoced cement concrete works using 20 mm ISS gauge hard broken grainte machine crushed metal including cost and conveyance of all materials at site including all labour charges for concrete mixing, laying, watering, curing properly but excluding cost of steel and centering etc., complete complying with standard specifications. | 1.2 | M3 | 9.25 | ₹11.1 |
| 9 | Plastering with cement mortar 1:5 (One part of Cement and Five part of Plastering Sand (P- Sand)) 12mm, thick in all floors including cost and conveyance of all materilas to site and labour charges etc,complete as per standard specifications | 138.2 | M2 | 10.25 | ₹1,416.55 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_786925.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .