Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹7.8 L
EMD Value
₹78,125
Closing Date
21 Oct 2026, 3:00 pm3d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
c.e office
c. e. office kanpur nagar nigamn motijheel
zone-01 ward-01 laxmipurwa ke antargat rath vale mandir se 25 Qutear Tiraha tak C.C Dwara Patach Ka Karya
2026_NNKAN_1197447_1
263/AA-1/2026-27
Open Tender
Civil Works
Fixed-rate
kanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
₹78,125
Yes
16 Oct 2026
16 Oct 2026
21 Oct 2026
16 Oct 2026
21 Oct 2026
16 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | 697-FS17005-DIMOLITION & DISMENTLING-Dismantling cement concrete or brick or granolithlc floors including stacking of dismantled materials as directed by Engineer-In-Charge within a distance of 60 meters (200 feet). Dismantling cement concrete orbrick or granolithlc floors including stacking of dismantled materials as directed by Engineer-In-Charge within a distance of 60 meters (200 feet).-Rate-67 per 1 Sqm. | 500 | sqm | 67 | ₹33,500 |
| 1.02 | 2.1.1 (2.1.1)-FS4001-Earth Work-earth work 2.1 (2.1,1) work in surface excavation not exceeding 30 cm in depth but ceeding 1.5 m In width as well as 10 sqm on plan including getting out d disposal of excavated earth upto SO m and lift upto 1.5 m, as directed Engineer-in- Charge: 2.1.1 All kinds of soil.o 0.30 M-Rate-170 per 1 Cum. | 18 | cum | 170 | ₹3,060 |
| 1.03 | NA-FS31005-Non SOR-Construction of gullypit 0.60x0.60x0.75 as per KNN design etc all work Construction of gullypit of 0.60x0.60x0.75 m internal size with jali, labour, T&P etc, required for proper completion of work.-Rate-5180 per 1 nos. | 5 | nos | 5,180 | ₹25,900 |
| 1.04 | NA-S31017-Non SOR-Non SOR Raising manhole by dismantling & refixing of manhole cover & frame including dimantling C.C. and C.C. work in 1:2:4 but excluding brick work which taken separately and all completion of work.-Rate-704 per 1 Each | 10 | each | 704 | ₹7,040 |
| 1.05 | non sor-F31190-Non SOR-construction of granular sub base (GSB) etc all comp. construction of granular sub base (GSB) etc all comp.-Rate-3676.00 per 1 Cum. | 40 | cum | 3,676 | ₹1,47,040 |
| 1.06 | 4.1.2-FS5001-Concrete/R.C.C. Work-Concrete /R.C.C Work 1:1½:3 (1 Cement: 1½ coarse sand (zone-Ill) : 3 graded stone aggregate 20 mm nominal size)-Rate-7160 per 1 Cum. | 61 | cum | 7,160 | ₹4,36,760 |
| 1.07 | Non SOR-F31028-Non SOR-Cortage of Earth or Malvaup to 3 KM including all completion of work Cortage of Earth or Malvaup to 3 KM including all completion of work-Rate-116.96 per 1 Cum. | 75 | cum | 116.96 | ₹8,772 |
| 1.09 | 18@ gst | 1 | Tax | 1,19,172.96 | ₹1,19,172.96 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 7.47 MB
BOQ_2262260.xls
BOQ • 0.34 MB
shudhi211026.pdf
Tender Documents • 0.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .