Loading…
Loading…
Updated dates
Tender Value
Refer Docs
EMD Value
₹2.2 Cr
Closing Date
6 Apr 2026, 12:00 pmClosed
GM
REFER BIDDING DOCUMENT
REFER BIDDING DOCUMENT
2025_RCFL_852128_1
Proj/Amm Revamp/2025/02
Limited
Miscellaneous Works
900 days
RCF, THAL
NOT APPLICABLE
12 documents required · 12 mandatory
₹0
₹2.2 Cr
RCF, THAL
8 Mar 2025
8 Mar 2025
8 Apr 2026
8 Mar 2025
6 Apr 2026
4 Apr 2025
8 Mar 2025 - 26 Mar 2025
28 Mar 2025
Tender Inviting Authority: Rashtriya Chemicals & Fertilizers Limited (RCF)
Name of Work: EPC CONTRACT FOR REVAMP OF AMMONIA PLANT LINE-I AND LINE-II OF RCF THAL FOR REDUCTION IN ENERGY
Name of the Bidder/ Bidding Firm / Company :
4 Bidder shall refer other section of bidding document for provisions pertaining to Taxes and Duties.
5 Spares for start-up/ commissioning, Mandatory Spares and Operational Spares are to be included in the quoted lumpsum price.
6 The break-up of LSTK Price pertains to major items without identifying individual tag nos. It will be the responsibility of the contractor to quote all materials/ equipments required for completion of work as per the contract, irrespective of whether all items are identified above or not. In case any item/services not Listed in BOQ 1 contractor shall inlude rate of such item / services under other Miscellaneous equipment/ services head. Break-up of items with Quantity and Price shall be mentioned in Annexure B. Price Quoted under "Other Miscellaneous equipment/ services required for completion of work " at Serial No. 1.11, 2.07, 3.11 and 4.07 in BoQ1 Sheet shall match with the price break-up mentioned in Annexure-B, however, in case of any ambiguity, the price quoted in BoQ1 Sheet shall prevail over price break-up mentioned in Annexure-B.
7 Clearance at Port, Airport, Demurrage / Warfage, if any, transportation to the site and loading / unloading will be in the CONTRACTOR’s Scope.
8 CONTRACTORS bringing equipment and material from outside Maharshtra will have to obtain necessary registrations and take appropriate steps as required under Maharashtra State Laws.
9 The payment break-up within the parameters indicated shall be submitted and finalised in the schedule of Activities in accordance with the payment terms setout in the annexure of Special Conditions of Contract. Bidder must submit Monthly Payment and Progress schedule in a tabular form as per format provided in the tender documents.
11 IT IS MANDATORY FOR THE BIDDER TO INDICATE “QUOTED/ INCLUDED” IN THE UNPRICED SCHEDULE FOR ALL ITEMS IN THE SCHEDULE OF PRICES. IF THE BIDDER FAILS TO QUOTE FOR ANY ITEM IN THE SCHEDULE OF PRICES OR MENTIONS ‘NOT APPLICABLE’ OR ‘NIL’, IT WILL BE IMPLIED THAT SUCH ITEM(S) ARE INCLUDED ELSEWHERE IN THE QUOTED PRICES AND THE BID SHALL BE EVALUATED ACCORDINGLY, BIDDER SHOULD NOT CLUB ITEMS WITH DIFFERING PAYMENT TERMS.
12 The Price for Detailed Engineering Component quoted in BoQ1 Sheet, Sr. No. 2.01 for Line-I and 4.01 for Line -II shall not exceed 3% (Three Percent) of the Total Lumpsum Price for respective Lines. The Total of Price for Supply component in BoQ1 Sheet, Serial No. 1.0 for Line-I and 3.0 for Line-II shall not exceed 75% (Seventy Five Percent) of the Total Lumpsum Price. In case the Break-Up of Lumpsum price(s) exceed the limits specified above, the excess amount shall be paid in final bill.
13 Supply items BoQ 1, Sr. No. 1.01 to 1.13 & 5.01 for Line-I and BoQ 1, Sr. No. 3.01 to 3.12 for Line-II shall be considered for MAD under delay in supply. MAD for Delay in Erection (pre shutdown jobs), BoQ 1, Sr. No. 2.02, 2.06 & 2.07 for Line-I and BoQ 1, Sr. No. 4.02, 4.06 & 4.07 shall be considrered. MAD for Hookup activities (shut down jobs), BoQ 1, Sr. No. 2.03, 2.04 & 2.05 for Line-I and BoQ 1, Sr. No. 4.03, 4.04 & 4.05 for Line-II shall be considered.
Select, Excess (+), Less (-) Less (-)
Tender Inviting Authority: RASHTRIYA CHEMICALS & FERTILIZERS LIMITED (RCF)
Name of Work: EPC CONTRACT FOR REVAMP OF AMMONIA PLANT LINE-I AND LINE-II OF RCF THAL FOR REDUCTION IN ENERGY
Tender Reference No.: Proj/Amm Revamp/2025/02
NOTE: i. Please submit UNPRICED COPY of this Schedule of Rates indicating QUOTED/ NOT QUOTED against each item, in the unpriced offer i.e. Techno-commercial bid. ii.Bidder shall provide the Break up of misc items/ Services in annexure B and same shal be considered for the evaluation.
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Item Description (Supply) Item Code / Make Quantity Units Estimated Rate in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC PRICE In Figures To be entered by the Bidder (Rs. /UNIT) TOTAL BASIC PRICE (Rs) Packing & Forwarding Charges ( '%' ) Total Packing & Forwarding Charges (Rs.) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Sub Total (basic + P&F) Rs. Freight Charges ( Incl of Service tax, loading & Unloading) ( % only ) TOTAL FREIGHT CHARGES (Rs) INSURANCE (In % only) Insurance (in Rs.) GST Rate ( in % only) GST (In Rs.) Total Landed Price to RCF (Rs) Less for GST Input Credit (Rs.) Total Evaluated cost to RCF for Deciding L1 bidder GST AMOUNT IN FIGURES (Rs) TOTAL BASIC PRICE TOTAL LUMPSUM PRICE (EXCLUDING GST) Total Lump-sum price In Words (excluding GST)
1 Supply for Ammonia Plant Line-I
1.01 Secondary Reformer Item 1 1 Lumpsum 100 Excess(+) Full Conversion INR 0 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
1.02 E312 Cooler Item 2 1 Lumpsum 100 Excess(+) Full Conversion INR 0 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
1.03 E504 Cooler Item 3 1 Lumpsum 100 Excess(+) Full Conversion INR 0 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
1.04 Revamp of Synthesis Gas Compressor and Turbine along with all auxilary accessories Item 4 1 Lumpsum 100 Excess(+) Full Conversion INR 0 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
1.05 Nitrogen Blower along with all auxilary accessories Item 5 1 Lumpsum 100 Excess(+) Full Conversion INR 0 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
1.06 Piping, insulation , Ducting including all valves Item 6 1 Lumpsum 100 Excess(+) Full Conversion INR 0 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
1.07 Electrical Items required for complete revamp Item 7 1 Lumpsum 100 Excess(+) Full Conversion INR 0 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
1.08 Instrumentation Items required for complete revamp Item 8 1 Lumpsum 100 Excess(+) Full Conversion INR 0 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
1.09 Transfer lines along with refractory Item 9 1 Lumpsum 100 Excess(+) Full Conversion INR 0 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
1.1 Refractory material Item 10 1 Lumpsum 100 Excess(+) Full Conversion INR 0 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
1.11 Other miscellaneous equipment required for completion of work Item 11 1 Lumpsum 100 Excess(+) Full Conversion INR 0 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
1.12 Civil and Structural Material for Construction Item 12 1 Lumpsum 100 Excess(+) Full Conversion INR 0 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
1.13 Spares (Mandatory + 2 yrs. Operational) as per list provided in bidding document Item 13 1 Lumpsum 100 Excess(+) Full Conversion INR 0 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
2 Services for Ammonia Plant Line-I
2.01 Detailed Engineering Item 14 1 Lumpsum 100 Excess(+) Full Conversion INR 0 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
2.02 Installation/ Erection (Pre Shutdown Activity) for FIM (HTER, WHB & SECONDARY REFORMER GUN) and contractor supplied equipment Item 15 1 Lumpsum 100 Excess(+) Full Conversion INR 0 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
2.03 Installation/ Erection (Hook Up Activity in Shutdown) for FIM (HTER, WHB & SECONDARY REFORMER GUN) and contractor supplied equipment Item 16 1 Lumpsum 100 Excess(+) Full Conversion INR 0 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
2.04 Unloading of existing catlayst (2 Lot of Catalyst) Item 17 1 Lumpsum 100 Excess(+) Full Conversion INR 0 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
2.05 Loading of fresh catlayst (3 Lot of Catalyst) Item 18 1 Lumpsum 100 Excess(+) Full Conversion INR 0 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
2.06 Civil work including structural jobs Item 19 1 Lumpsum 100 Excess(+) Full Conversion INR 0 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
2.07 Other miscellaneous services required for completion of work Item 20 1 Lumpsum 100 Excess(+) Full Conversion INR 0 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
3 Supply for Ammonia Plant Line-II
3.01 Secondary Reformer Item 21 1 Lumpsum 100 Excess(+) Full Conversion INR 0 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
3.02 E312 Cooler Item 22 1 Lumpsum 100 Excess(+) Full Conversion INR 0 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
3.03 E504 Cooler Item 23 1 Lumpsum 100 Excess(+) Full Conversion INR 0 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
3.04 Revamp of Synthesis Gas Compressor and Turbine along with all auxilary accessories Item 24 1 Lumpsum 100 Excess(+) Full Conversion INR 0 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
3.05 Nitrogen Blower along with all auxilary accessories Item 25 1 Lumpsum 100 Excess(+) Full Conversion INR 0 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
3.06 Piping, insulation , Ducting including all valves Item 26 1 Lumpsum 100 Excess(+) Full Conversion INR 0 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
3.07 Electrical Items required for complete revamp Item 27 1 Lumpsum 100 Excess(+) Full Conversion INR 0 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
3.08 Instrumentation Items required for complete revamp Item 28 1 Lumpsum 100 Excess(+) Full Conversion INR 0 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
3.09 Transfer lines along with refractory Item 29 1 Lumpsum 100 Excess(+) Full Conversion INR 0 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
3.1 Refractory material Item 30 1 Lumpsum 100 Excess(+) Full Conversion INR 0 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
3.11 Other miscellaneous equipment required for completion of work Item 31 1 Lumpsum 100 Excess(+) Full Conversion INR 0 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
3.12 Civil and Structural Material for Construction Item 32 1 Lumpsum 100 Excess(+) Full Conversion INR 0 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
4 Services for Ammonia Plant Line-II
4.01 Detailed Engineering Item 33 1 Lumpsum 100 Excess(+) Full Conversion INR 0 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
4.02 Installation/ Erection (Pre Shutdown Activity) for FIM (HTER, WHB & SECONDARY REFORMER GUN) and contractor supplied equipment Item 34 1 Lumpsum 100 Excess(+) Full Conversion INR 0 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
4.03 Installation/ Erection (Hook Up Activity in Shutdown) for FIM (HTER, WHB & SECONDARY REFORMER GUN) and contractor supplied equipment Item 35 1 Lumpsum 100 Excess(+) Full Conversion INR 0 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
4.04 Unloading of existing catlayst (2 Lot of Catalyst) Item 36 1 Lumpsum 100 Excess(+) Full Conversion INR 0 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
4.05 Loading of fresh catlayst (3 Lot of Catalyst) Item 37 1 Lumpsum 100 Excess(+) Full Conversion INR 0 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
4.06 Civil work including structural jobs Item 38 1 Lumpsum 100 Excess(+) Full Conversion INR 0 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
4.07 Other miscellaneous services required for completion of work Item 39 1 Lumpsum 100 Excess(+) Full Conversion INR 0 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
5 Common Supply and Services for Ammonia Plant Line-I & Line-II
5.01 Methanol pump Item 40 1 Lumpsum 100 Excess(+) Full Conversion INR 0 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
5.02 Commissioning & PGTR Item 41 1 Lumpsum 100 Excess(+) Full Conversion INR 0 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
Total in Figures 4 Construction of chamber for 100mm sluice plates item5 10 Nos
Quoted Rate in Figures Select
Quoted Rate in Words
Tender Inviting Authority: Rashtriya Chemicals & Fertilizers Limited (RCF)
Name of Work: EPC CONTRACT FOR REVAMP OF AMMONIA PLANT LINE-I AND LINE-II OF RCF THAL FOR REDUCTION IN ENERGY
Tender Reference No.: Proj/Amm Revamp/2025/02
Name of the Bidder/ Bidding Firm / Company :
ANNEXURE-A MONTHLY PAYMENT SCHEDULE
Sl. No. PROPOSED PROJECT SCHEDULE % (In Percentage)
Tender Inviting Authority: Rashtriya Chemicals & Fertilizers Limited (RCF)
Name of Work: EPC CONTRACT FOR REVAMP OF AMMONIA PLANT LINE-I AND LINE-II OF RCF THAL FOR REDUCTION IN ENERGY
Tender Reference No.: Proj/Amm Revamp/2025/02
NOTE: 1. Bidder shall provide itemised Price List for misc items/services if any considerd for completion of project. 2. Prices quoted for Bidder's misc items/services if any considerd shall be considered for bid evaluation purpose.
Sl. No. Item Description Item Name (Wherever necessary) ( PLEASE MENTION THE DESCRIPTION OF REQUIRED 2 year Normal Operation and Maintenance SPARES IN THE SPACE PROVIDED BELOW ) Units Quantity Quoted Currency Unit Price on FOT Site Basis Total Price on FOT Site Basis Transportation Charges (in %)
BoQ1 Sr. No. 1.11 Other miscellaneous equipment required for completion of work for Revamp of Ammonia Plant Line-I.
BoQ1 Sr. No. 2.07 Other miscellaneous services required for completion of work for Revamp of Ammonia Plant Line-I.
BoQ1 Sr. No. 3.11 Other miscellaneous equipment required for completion of work for Revamp of Ammonia Plant Line-II.
BoQ1 Sr. No. 4.07 Other miscellaneous services required for completion of work for Revamp of Ammonia Plant Line-II.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.08 MB
Tendernotice_2.pdf
PDF • 24.65 MB
BOQ_896179.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid