Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.5 LAccepted-AOC 11 SANJIV BAUG SOCIETY NEW SHARDA MANDIR ROAD PALDI AHMEDABAD GUJARAT 380007 | AHMADABAD | GUJARAT | 380007 | L1 | Accepted-AOC L1 Bidder | |
| 2 | L2₹21.7 L+₹1.3 L (6.11%)Rejected-Finance 147 UDHYOG VIHAR PH I GURGOAN HARYANA 122016 | GURUGRAM | HARYANA | 122016 | L2 | Rejected-Finance NOT Being L1 Bidder |
| Sl No | Description | Qty | Unit | OMEGA ELEVATORS L1 | Johnson Lifts Pvt Ltd L2 |
|---|---|---|---|---|---|
| 1.00SH-I : SITC of 8 Passenger Lift | |||||
| 1.01 | Supply, Installation, Testing & Commissioning of Electric Traction type fully automatic Machine Room Less Passenger Lift of 08 passengers, 544 KG Capacity, G+06 Stops, 07 openings and entrance at front side on all the 07 serving floors, automatic centre opening Stainless Steel Hairline finish door, car enclosure provided with Stainless Steel Hairline finish panel on sides and with travel height of 23 mtrs. (Approx.) suitable for operation on 415 V, 3 phase, 50 Hz AC supply, having microprocessor based AC Variable Voltage and Variable Frequency type traction control, minimum speed of 1.50 Mtr/Sec, electromagnetic brake system, simplex mode operations, operating panel with luminous buttons having braily code, overload warning indicator, battery operated alarm bell, LED type emergency light, intercom suitable for hook up to AAI’s EPABX, infrared ray sensing door protection for full height, reverse phase relay on controller, fireman’s switch at ground floor, digital car positions indicator in car and at all floors with UP / DOWN direction, light fixtures, ventilation fan, landing sill, main beam in shaft for machine, pit ladder etc complete with all accessories including Automatic Rescue Device (ARD) and Manual Rescue Device (MRD) in the event of power failure etc., as required. The traction motor of machine room less Lift shall be of gearless type and placed inside the Lift hoist way. Elevators shall be BMS compatible and cost should includes for obtainig necessary Lift Licence from Regulatory Authority and Lift Insurance etc. complete as required. | 1 | Each | 16,05,000 ₹16,05,000 Lowest | 17,03,000 ₹17,03,000 |
| 2.00SH: II -All Inclusive Comprehensive Maintenance Contract (AICMC) of 8 Passenger Lift | |||||
| 2.01All Inclusive Comprehensive Maintenance (AICMC) of 01 No. 8 Passenger Lift as mentioned at Item No. 1 of SH:I installed in alternate MSSR Building including replacement of all Mechanical, Electrical spares and consumables as and when required to keep the system 100% service condition, providing full support during breakdown & trouble shooting, programming, carrying out MONTHLY routine maintenance checks, preventive and breakdown maintenance etc. as required as per good engineering practices, recommendations of the respective Original Equipment Manufacturer (OEM) and as per the instructions of Engineer-In-Charge for maintaining the systems. This includes keeping the system in acceptable functional and serviceable state etc. as specified including cost of all spare parts and submission of monthly maintenance service records and Reporting etc., as required. | |||||
| 2.02 | First Year after Completion of 02 (Two) year DLP (Considered 5% of SITC Cost of item No. 01) | 1 | Annum | 80,250 ₹80,250 Lowest | 85,150 ₹85,150 |
| 2.03 | Second Year after Completion of 02 (Two) year DLP (Considered Yearly 5% cumulative enhancement on 1st year AICMC Rate) | 1 | Annum | 84,263 ₹84,263 Lowest | 89,408 ₹89,408 |
| 2.04 | Third Year after Completion of 02 (Two) year DLP (Considered Yearly 5% cumulative enhancement on 2nd year AICMC Rate) | 1 | Annum | 88,476 ₹88,476 Lowest | 93,878 ₹93,878 |
| 2.05 | Fourth Year after Completion of 02 (Two) year DLP (Considered Yearly 5% cumulative enhancement on 3rd year AICMC Rate) | 1 | Annum | 92,900 ₹92,900 Lowest | 98,572 ₹98,572 |
| 2.06 | Fifth Year after Completion of 02 (Two) year DLP (Considered Yearly 5% cumulative enhancement on 4th year AICMC Rate) | 1 | Annum | 97,545 ₹97,545 Lowest | 1,03,501 ₹1,03,501 |
Tender Value
₹24.4 L
EMD Value
₹73,100
Closing Date
21 May 2025, 3:00 pmClosed
Senior Manager (Engg-Electrical)
Sr. Manager (Engg-Elect), ED-II, AAI, RHQ, Southern Region, Chennai Airport, Chennai-600 016.
Construction of Sub Station and Ancillary Works for New ASR Collocated MSSR at RHQ SR Chennai Airport SH SITC of 8 Passenger Lift including AICMC for 05 Years after 02 Years DLP
2025_AAI_232695_1
AAI/RHQ-SR/ED-II/2025/MSSR /Lift/01
Open Tender
Electrical Works
Works
180 days
MSSR Building, Chennai Airport
As per NIT criteria
19 documents required · 19 mandatory
₹1,180
₹73,100
26 Feb 2026
23 Apr 2025
22 May 2025
24 Apr 2025
21 May 2025
24 Apr 2025
24 Apr 2025 - 9 May 2025
Amount
SH-I : SITC of 8 Passenger Lift
Supply, Installation, Testing & Commissioning of Electric Traction type fully automatic Machine Room Less Passenger Lift of 08 passengers, 544 KG Capacity, G+06 Stops, 07 openings and entrance at front side on all the 07 serving floors, automatic centre opening Stainless Steel Hairline finish door, car enclosure provided with Stainless Steel Hairline finish panel on sides and with travel height of 23 mtrs. (Approx.) suitable for operation on 415 V, 3 phase, 50 Hz AC supply, having microprocessor based AC Variable Voltage and Variable Frequency type traction control, minimum speed of 1.50 Mtr/Sec, electromagnetic brake system, simplex mode operations, operating panel with luminous buttons having braily code, overload warning indicator, battery operated alarm bell, LED type emergency light, intercom suitable for hook up to AAI’s EPABX, infrared ray sensing door protection for full height, reverse phase relay on controller, fireman’s switch at ground floor, digital car positions indicator in car and at all floors with UP / DOWN direction, light fixtures, ventilation fan, landing sill, main beam in shaft for machine, pit ladder etc complete with all accessories including Automatic Rescue Device (ARD) and Manual Rescue Device (MRD) in the event of power failure etc., as required. The traction motor of machine room less Lift shall be of gearless type and placed inside the Lift hoist way. Elevators shall be BMS compatible and cost should includes for obtainig necessary Lift Licence from Regulatory Authority and Lift Insurance etc. complete as required.
SH: II -All Inclusive Comprehensive Maintenance Contract (AICMC) of 8 Passenger Lift
All Inclusive Comprehensive Maintenance (AICMC) of 01 No. 8 Passenger Lift as mentioned at Item No. 1 of SH:I installed in alternate MSSR Building including replacement of all Mechanical, Electrical spares and consumables as and when required to keep the system 100% service condition, providing full support during breakdown & trouble shooting, programming, carrying out MONTHLY routine maintenance checks, preventive and breakdown maintenance etc. as required as per good engineering practices, recommendations of the respective Original Equipment Manufacturer (OEM) and as per the instructions of Engineer-In-Charge for maintaining the systems. This includes keeping the system in acceptable functional and serviceable state etc. as specified including cost of all spare parts and submission of monthly maintenance service records and Reporting etc., as required.
First Year after Completion of 02 (Two) year DLP (Considered 5% of SITC Cost of item No. 01)
Second Year after Completion of 02 (Two) year DLP (Considered Yearly 5% cumulative enhancement on 1st year AICMC Rate)
Third Year after Completion of 02 (Two) year DLP (Considered Yearly 5% cumulative enhancement on 2nd year AICMC Rate)
Fourth Year after Completion of 02 (Two) year DLP (Considered Yearly 5% cumulative enhancement on 3rd year AICMC Rate)
Fifth Year after Completion of 02 (Two) year DLP (Considered Yearly 5% cumulative enhancement on 4th year AICMC Rate)
Johnson Lifts Pvt Ltd (BID ID -852971)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .