Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.9 LAccepted-AOC | L1 | Accepted-AOC found lowest one bidder L1 | |
| 2 | L2₹10.1 L+₹23,980.10 (2.43%)Rejected-Finance | L2 | Rejected-Finance Quoted high rate as compare to L1 bidder |
Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
16 Sept 2020, 4:00 pmClosed
Executive Engineer
Rural Engineering Wing leh
Const.of community library for liker student education society at solar colony
2020_RDD_627_1
NIT 64 UT LEHREW of 2020-21
Open Tender
Civil Works - Others
Item Rate
60 days
Leh
Please refer Tender documents.
6 documents required · 6 mandatory
₹500
Yes
Executive Engineer
₹20,000
Yes
30 Sept 2020
27 Aug 2020
18 Sept 2020
27 Aug 2020
16 Sept 2020
27 Aug 2020
Amount
Earth work in excavation by manual means over area (Exceeding 30 em and upto 1.5 mtr in depth, 1.5 mtr in width as well as 10 sqm. on plan) including disposal of excavated earth upto 1 mtr from cutting edge, disposed earth to be levelled and neatly dressed in : All kinds of Soil
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering- All work upto plinth level.1:4:8 (1 cement: 4 coarse sand: 8 graded stone aggregate 40mm nominal size) (A) Crushed
Reinforced cement concrete work in walls (anythickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutmen"ts, posts ans sturts, etc. upto floor five level excluding cost of centring, shuttering,fmishing and reinforcement.1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded crushed stone aggregate 20mm nominal size)
Centring and shuttermg including strutting, propping etc.and removal of form for·Columns, Pillars, Piers, Abutments, Posts and Struts
Centring and shuttermg including strutting, propping etc.and removal of form for·Lintels, beams, plinth beams, girders, bressumers and centilevers.
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete.Thermo-Mechanically Treated bars.
Random Rubble masonry with hard stone from nallah in foundation and plinth including levelling up with cement concrete 1 :6:12 ( 1 Cement: 6 coarse sand : 12 graded stone aggregate 20mm nominal size) at plinth level with
Providing and laying damp-proof course 80mm thick with cement concrete 1:2:4 (1 cement : 2 coarse sand 4 graded stone aggregate 20mm nominal size (A) Crushed
Providing and fixing upto floor five level precast cement concrete solid blocks including hoisting and setting in position with cement mortar 1:3 (1 cement : 3 coarse sand), cost of required centring, shuttering and complete. 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size) (A) Crushed
Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length (hold fast lugs or with dash fasteners shall be paid for separately):Seconclass kail wood
Carriage of stone avg.lead 10 KM by M.T
Carriage of sand avg,lead 8 KM by M.T
Carriage of Bajeri avg.lead 10 KM by M.T
M/S RIGZIN SONDUP
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .