| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC A 4 GALI NO 1 ANANDPURI MATHURA | MATHURA | MATHURA | UTTAR PRADESH | ₹1.3 Cr | L1 | Accepted-AOC FIRST LOWEST |
| 2 | L2₹1.3 CrRejected-Finance | ₹1.3 Cr | L2 | Rejected-Finance SECOND LOWEST |
| 3 | L3₹1.4 CrRejected-Finance 1 234 8 | ALIGARH | UTTAR PRADESH | 202001 | ₹1.4 Cr | L3 | Rejected-Finance THIRD LOWEST |
| 4 | L4₹1.4 CrRejected-Finance VILLAGE AND POST PIPRA GAUTAM TEHSIL AND DISTRICT BASTI UTTAR PRADESH | GONDA | UTTAR PRADESH | 271305 | ₹1.4 Cr | L4 | Rejected-Finance FOURTH LOWEST |
| 5 | L5₹1.4 CrRejected-Finance FLAT NO 02 KAPIL VIHAR NEAR BANAVEDI DHANA ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | ₹1.4 Cr | L5 | Rejected-Finance FIFTH LOWEST |
| Sl No | Description | Qty | Unit | JAI LAXMI CONTRACTOR L2 | M/S PRADEEP ASSOCIATES L1 | MA AND SONS L5 | M/S ADITYA CONSTRUCTION COMPANY L4 | M/S Harish Kumar Contractor L3 | VIJAY ASSOCIATES L6 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | E/W IN FOUNDATION IN ORDINARY SOIL INCLUDING LIFT UP TO 1.5M AND LEAD UP TO 30M AND INCLUDING BACK FILLING,WATERING AND RAMMING OF EXCAVATED EARTH & REMOVAL, DISPOSAL OF SURPLUS EARTH AS DIRECTED BY ENGINEER- IN-CHARGE UPTO A DISTANCE OF 30M. I/C ALL COST OF LABOUR, T&P ETC COMPLETE AS DIRECTED BY ENGINEER IN CHARGE | 5,693 | M3 | 65 ₹3,70,045 | 75 ₹4,26,975 | 50 ₹2,84,650 | 70 ₹3,98,510 | 75.35 ₹4,28,967.55 | 60 ₹3,41,580 |
| 2.00 | PROVIDING AND FILLING FINE SAND INCLUDING COST OF ALL MATERIAL, LABOUR, T&P. ETC COMPLETE AS DIRECTED BY ENGINEER IN CHARGE | 140 | M3 | 1,200 ₹1,68,000 | 1,100 ₹1,54,000 | 560 ₹78,400 | 1,100 ₹1,54,000 | 1,129.56 ₹1,58,138.4 | 800 ₹1,12,000 |
| 3.00 | S/L 200 MICRON L.D.P. FILM I/C ALL COST OF MATERIAL ,LABOUR,AND T&P---ETC ALL COMPLETE AS PER DIRECTION OF ENGINEER-IN CHARGE. | 1,400 | M2 | 25 ₹35,000 | 25 ₹35,000 | 20 ₹28,000 | 40 ₹56,000 | 33.15 ₹46,415.6 | 35 ₹49,000 |
| 4.00 | P/L C.C.(1:3:6)(CEMENT,COARSE SAND AND 10 TO 20 MM SIZE STONE AGGREGATE )I/C ALL COST OF MATERIAL,LABOUR,T&P.ETC COMPLETE AS DIRECTED BY ENGINEER IN CHARGE. | 98 | M3 | 5,500 ₹5,39,000 | 4,710 ₹4,61,580 | 5,400 ₹5,29,200 | 6,000 ₹5,88,000 | 4,814.87 ₹4,71,856.77 | 5,400 ₹5,29,200 |
| 5.00 | P/L C.C.(1:2:4)(CEMENT,COARSE SAND AND 10 TO 20 MM SIZE STONE AGGREGATE ) I/C ALL COST OF MATERIAL, LABOUR, T&P.ETC COMPLETE AS DIRECTED BY ENGINEER IN CHARGE. | 144 | M3 | 6,000 ₹8,64,000 | 5,010 ₹7,21,440 | 5,600 ₹8,06,400 | 6,500 ₹9,36,000 | 5,105.72 ₹7,35,223.1 | 5,900 ₹8,49,600 |
| 6.00 | P/L C.C.(1:1:2)(CEMENT,COARSE SAND AND 10 TO 20 MM SIZE STONE AGGREGATE ) I/C ALL COST OF MATERIAL, LABOUR, T&P ETC. COMPLETE AS DIRECTED BY ENGINEER IN CHARGE. | 11 | M3 | 7,000 ₹77,000 | 6,330 ₹69,630 | 8,000 ₹88,000 | 8,000 ₹88,000 | 6,457.5 ₹71,032.45 | 6,900 ₹75,900 |
| 7.00 | P/L R.C.C.(1:1.5:3)(CEMENT,COARSE SAND AND 10 TO 20 MM SIZE STONE AGGREGATE ) I/C ALL COST OF MATERIAL, LABOUR, T&P ETC COMPLETE AS DIRECTED BY ENGINEER IN CHARGE. | 44 | M3 | 7,000 ₹3,08,000 | 6,100 ₹2,68,400 | 8,200 ₹3,60,800 | 8,000 ₹3,52,000 | 6,223.91 ₹2,73,852.04 | 6,900 ₹3,03,600 |
| 8.00 | CENTERING AND SHUTTERING FOR C.C. WORK INNCLUDING STRUTTING,PROPPING TEC. AND REMOVAL OF FORM WORK AS DIRECTED BY ENGINEER IN CHARGE | 276 | M2 | 400 ₹1,10,400 | 410 ₹1,13,160 | 380 ₹1,04,880 | 500 ₹1,38,000 | 433.26 ₹1,19,580.45 | 300 ₹82,800 |
| 9.00 | Centering and shuttering for R.C.C. Work including strutting, propping etc. and removal of form work as directed by Engineer in charge. | 163 | M2 | 500 ₹81,500 | 600 ₹97,800 | 320 ₹52,160 | 700 ₹1,14,100 | 606.57 ₹98,870.5 | 500 ₹81,500 |
| 10.00 | P/L STEEL REINFORCEMENT FOR RCC WORK I/C CUTTING,BENDING,& PLACING IN POSITION I/C ALL COST OF MATERIAL, LABOUR, T& P ETC COMPLETE AS DIRECTED BY ENGINEER IN CHARGE. | 3.5 | MT | 62,000 ₹2,17,000 | 60,000 ₹2,10,000 | 70,000 ₹2,45,000 | 70,000 ₹2,45,000 | 56,512.5 ₹1,97,793.75 | 70,000 ₹2,45,000 |
Tender Value
₹1.8 Cr
EMD Value
₹3.6 L
Closing Date
18 Oct 2025, 3:00 pmClosed
SE IWC MATHURA
SE IWC MATHURA
Restoration work of Girdharpur Dy. and other works.
2025_UPIDC_1081202_1
06/SE/2025-26
Open Tender
Civil Works
180 days
KHURJA
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,744
₹3.6 L
SE IWC MATHURA
28 Jan 2026
10 Oct 2025
18 Oct 2025
10 Oct 2025
18 Oct 2025
10 Oct 2025
10 Oct 2025
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.65 MB
all.pdf
Tender Documents • 6.05 MB
BOQ_1979002.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid