Loading…
Loading…
Tender Value
₹93.3 L
EMD Value
₹1.9 L
Closing Date
2 Jul 2026, 11:00 amClosed
Executive Engineer
Executive Engineer, Water Supply and Sanitation, Division No.-1, At Chandigarh
LINING OF KUTCCHA CHANNEL NEAR COMMANDO COMPLEX, PHASE 11, S.A.S. NAGAR AND ALL OTHER WORKS CONTIGENT THERETO.
2026_WSS_170406_1
5747
National Competitive Bid
Civil Works - Others
Percentage
180 days
Mohali
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
₹1.9 L
Mohali
8 Jul 2026
17 Jun 2026
2 Jul 2026
17 Jun 2026
2 Jul 2026
17 Jun 2026
22 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Site clearance Clearing jungle manually including uprooting rank vegetation, grass, woody vegetation up to 30 cm girth measured at height of 1 m above ground level and removal of rubbish up to distance of 50 m outside the periphery of the area cleared | 2,432.8 | Sqm | 8.39 | ₹20,411.19 |
| 2 | Excavation in Soil (any type) using Hydraulic Excavator CK 90 with hydraulic excavator of 0.9 cum bucket capacity including cutting, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, including all lifts and combined lead upto 30m. | 729.54 | Cum | 35.82 | ₹26,132.12 |
| 3 | Excavation in soil (any type) using Hydraulic Excavator CK 90 hydraulic excavator of 0.9 cum bucket capacity including cutting and leading in tippers, trimming bottom and side slopes, in accordance with requirement of lines, grades and cross sections, including all lifts and combined lead up to 30 m. (Rehandling of earth) (20% Less Rate) | 2,625.92 | Cum | 28.66 | ₹75,258.87 |
| 4 | Compaction Extra for laying earth/fly ash as per specifications in 20 cm. Layers and dressing but excluding costof rolling. | 688.34 | Cum | 65.32 | ₹44,962.37 |
| 5 | Compaction Extra for watering the earth/fly ash laid in 20 cm layers as per specifications for compaction. | 688.34 | Cum | 15.8 | ₹10,875.77 |
| 6 | Compaction Extra for rolling to specifications. | 688.34 | Cum | 17.91 | ₹12,328.17 |
| 7 | Earth work for lip cutting for lining of irrigation channels inclusive of all allowances, lead and dressing :- 0 to 1.5 m depth | 103.39 | Cum | 159.2 | ₹16,459.69 |
| 8 | Earth work for lip cutting for lining of irrigation channels inclusive of all allowances, lead and dressing :- depth exceeding 1.5 ms but upto 3.0 ms. | 103.39 | Cum | 166.84 | ₹17,249.59 |
| 9 | Earth work for lip cutting for lining of irrigation channels inclusive of all allowances, lead and dressing :- depth exceeding 3.0 ms but upto 4.5 ms. | 276.09 | Cum | 182.14 | ₹50,287.03 |
| 10 | Dressing of earth work New work or remodeling work.Unit | 2,750.01 | Sqm | 1.3 | ₹3,575.01 |
stage.html
html • 0.02 MB
cancelled_1.PDF
pdf • 0.05 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.07 MB
BOQ_346787.xls
BOQ • 0.31 MB
DNITKuttcchaChannelok.pdf
Tender Documents • 22.16 MB
corrigendum6395date.PDF
PDF • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .