Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹13.6 LAdmitted-Finance | -0.05% | ₹13.6 L | L1 | Admitted-Finance |
| 2 | L2₹13.8 LAdmitted-Finance | +1.00% | ₹13.8 L | L2 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹30,000
Closing Date
25 May 2026, 12:00 pmClosed
E.E.RED OFFICE VIKAS BHAWAN MAINPURI
E.E.RED OFFICE VIKAS BHAWAN MAINPURI
Construction of R.C.C. Ramp and Vedio Confrencing Room at 1st Floor vikas Bhawan Mainpuri
2026_REDUP_1147476_3
250/EE/RED/25-04-2026
Open Tender
Civil Works - Others
120 days
Mainpuri
Please refer Tender documents.
2 documents required · 2 mandatory
₹854
₹30,000
Yes
3 Jun 2026
12 May 2026
25 May 2026
12 May 2026
25 May 2026
12 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | (A) R.C.C. RAMP WORK | - | - | - | - | BI01010001010000000000000515BI0100001112 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. Sl.No.2.8.1 | 49.4 | CUM | 185.46 | ₹9,161.72 | BI01010001010000000000000515BI0100001113 |
| 3 | 1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources). 4.1.8 | 1 | Sqm | 4,853.39 | ₹4,852.9 | BI01010001010000000000000515BI0100001114 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement :1.5 coarse sand :3 graded stone aggregate 20 mm nominal size) as per Sl No.5.1.2 | - | CUM | 6,444.88 | - | BI01010001010000000000000515BI0100001115 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form : Foundation as per Sl no.5.9.1 | 64.01 | Sqm | 279.4 | ₹17,884.39 | BI01010001010000000000000515BI0100001116 |
| 6 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement :1.5 coarse sand (zone-3rd) derived from natural sources :3 graded stone aggregate 20 mm nominal size derived from natural sources) Above Plinth Lvl as Sl No.5.2.2 | 3.61 | CUM | 7,732.47 | ₹27,914.22 | BI01010001010000000000000515BI0100001117 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form : Column as per Sl.no.5.9.6 | 52.38 | Sqm | 684.9 | ₹35,875.06 | BI01010001010000000000000515BI0100001118 |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). as per Sl No.5.3 | 17.27 | CUM | 8,197.4 | ₹1,41,569.1 | BI01010001010000000000000515BI0100001119 |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form : Beam as per Sl.no.5.9.5 | 84.53 | Sqm | 524.67 | ₹44,350.36 | BI01010001010000000000000515BI0100001120 |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form : slab as per Sl.no.5.9.3 | 52.15 | Sqm | 660.65 | ₹34,452.9 | BI01010001010000000000000515BI0100001121 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
sbdd.pdf
Tender Documents • 1.57 MB
BOQ_2147607.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid