Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 LAccepted-AOC 8 HIDARAM BANERJEE LANE KOLKATA 700012 | KOLKATA | KOLKATA | WEST BENGAL | 700012 | ₹1.3 L | L1 | Accepted-AOC AOC |
| 2 | L2₹1.3 L+₹948.67 (0.74%)Rejected-Finance CHOTONILPUR KUCHULPUKUR PAR BURDWAN | ₹1.3 L+₹948.67 (0.74%) | L2 | Rejected-Finance 2nd Lowest bidder |
| 3 | L3₹1.3 L+₹1,673.28 (1.30%)Rejected-Finance BARANIJPUR SAKTIPARA BURDWAN | ₹1.3 L+₹1,673.28 (1.30%) | L3 | Rejected-Finance 3rd Lowest bidder |
| Sl No | Description | Qty | Unit | BEHERA ENTERPRISE L3 | C M ENTERPRISE L2 | JOYGURU ENTERPRISE L1 |
|---|---|---|---|---|---|---|
| 1.00RTC | ||||||
| 1.01 | Cleaning and removing mud upto 2000 ltrs PVC water storage tank. (2000 Ltr. PVC tank -16 Nos.) Each tank 6 time cleaning in a working year i.e once in a 2 month.
Total= 16 nos x 6 time= 96 nos. | 96 | Each | 110 ₹10,560 | 109 ₹10,464 | 108 ₹10,368 Lowest |
| 1.02 | Cleaning and disinfecting upto 2000 ltrs. PVC water storage tank. (2000 Ltr. PVC tank -16 Nos.) Each tank 6 time cleaning in a working year i.e once in a 2 month.
Total= 16 nos x 6 time= 96 nos. | 96 | Each | 160 ₹15,360 | 157 ₹15,072 | 156 ₹14,976 Lowest |
| 1.03 | Clearing the different roof top water tanks surrounding which includes cutting bushes, shrubs and cleaning the dirt from the roof surface respectively. (for such 6 nos operations in a working year i.e once in a 2 month) | 6 | LS | 1,020 ₹6,120 | 1,019 ₹6,114 | 1,018 ₹6,108 Lowest |
| 2.00NTC | ||||||
| 2.01 | Cleaning and removing mud upto 2000 ltrs PVC water storage tank. (2000 Ltr. PVC tank -32 Nos.) Each tank 6 time cleaning in a working year i.e once in a 2 month.
Total= 32 nos x 6 time= 192 nos. | 192 | Each | 110 ₹21,120 | 109 ₹20,928 | 108 ₹20,736 Lowest |
| 2.02 | Cleaning and disinfecting upto 2000 ltrs. PVC water storage tank. 2000 Ltr. PVC tank -32 Nos.) Each tank 6 time cleaning in a working year i.e once in a 2 month.
Total= 32 nos x 6 time= 192 nos. | 192 | Each | 158 ₹30,336 | 157 ₹30,144 | 156 ₹29,952 Lowest |
| 2.03 | Cleaning and removing mud 10000 gallon one no Elevated Reservoir Tank. Elevated Reservoir 2 time cleaning in a working year i.e once in a 6 month.
Total= 1 no x 2 time= 2 nos. | 2 | Each | 2,990 ₹5,980 | 2,987 ₹5,974 | 2,986 ₹5,972 Lowest |
| 2.04 | Cleaning and disinfecting 10000 gallon one no Elevated Reservoir Tank. Elevated Reservoir 2 time cleaning in a working year i.e once in a 6 month.
Total= 1 no x 2 time= 2 nos. | 2 | Each | 3,905 ₹7,810 | 4,000 ₹8,000 | 3,900 ₹7,800 Lowest |
| 2.05 | Clearing the OHR (1nos) and different roof top water tanks surrounding which includes cutting bushes, shrubs and cleaning the dirt from the OHR premises and the roof surface respectively. (for such 6 nos operations in a working year i.e once in a 2 month) | 6 | LS | 1,985 ₹11,910 | 1,982 ₹11,892 | 1,980 ₹11,880 Lowest |
Tender Value
₹1.3 L
EMD Value
₹2,700
Closing Date
30 Jul 2026, 5:30 pmClosed
EXECUTIVE ENGINEER, CENTRAL MECHANICAL DIVISION
EE,CMD,PHED,5TH_FLOOR_PUTHA_BHAVAN,_PURBA_BARDHAMAN
Washing_cleaning_of_PVC_roof_tanks_and_masonary_reservoir_at_different_buildings_of_Dental_College_and_Hospital_(RTC)_and_Nursing_Training_Center_(NTC)_water_supply_scheme_under_CMD_PHE_Dte_Dist_Purba_Bardhaman
2026_PHED_1032964_2
WBPHED/EE/CMD/ENIT-03/2026-27
Open Tender
PLUMBING WORKS M/R
Item Rate
365 days
EE, CMD, PHED, 5TH_FLOOR_PUTHA_BHAVAN
Washing_cleaning_of_PVC_roof_tanks_and_masonary_reservoir_at_different_buildings_of_Dental_College_and_Hospital_(RTC)_and_Nursing_Training_Center_(NTC)_water_supply_scheme_under_CMD_PHE_Dte_Dist_Purba_Bardhaman
5 documents required · 5 mandatory
₹2,700
21 Aug 2026
22 Jul 2026
3 Aug 2026
22 Jul 2026
30 Jul 2026
22 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1RTC | |||||
| 1.01 | Cleaning and removing mud upto 2000 ltrs PVC water storage tank. (2000 Ltr. PVC tank -16 Nos.) Each tank 6 time cleaning in a working year i.e once in a 2 month.
Total= 16 nos x 6 time= 96 nos. | 96 | Each | - | - |
| 1.02 | Cleaning and disinfecting upto 2000 ltrs. PVC water storage tank. (2000 Ltr. PVC tank -16 Nos.) Each tank 6 time cleaning in a working year i.e once in a 2 month.
Total= 16 nos x 6 time= 96 nos. | 96 | Each | - | - |
| 1.03 | Clearing the different roof top water tanks surrounding which includes cutting bushes, shrubs and cleaning the dirt from the roof surface respectively. (for such 6 nos operations in a working year i.e once in a 2 month) | 6 | LS | - | - |
| 2NTC | |||||
| 2.01 | Cleaning and removing mud upto 2000 ltrs PVC water storage tank. (2000 Ltr. PVC tank -32 Nos.) Each tank 6 time cleaning in a working year i.e once in a 2 month.
Total= 32 nos x 6 time= 192 nos. | 192 | Each | - | - |
| 2.02 | Cleaning and disinfecting upto 2000 ltrs. PVC water storage tank. 2000 Ltr. PVC tank -32 Nos.) Each tank 6 time cleaning in a working year i.e once in a 2 month.
Total= 32 nos x 6 time= 192 nos. | 192 | Each | - | - |
| 2.03 | Cleaning and removing mud 10000 gallon one no Elevated Reservoir Tank. Elevated Reservoir 2 time cleaning in a working year i.e once in a 6 month.
Total= 1 no x 2 time= 2 nos. | 2 | Each | - | - |
| 2.04 | Cleaning and disinfecting 10000 gallon one no Elevated Reservoir Tank. Elevated Reservoir 2 time cleaning in a working year i.e once in a 6 month.
Total= 1 no x 2 time= 2 nos. | 2 | Each | - | - |
| 2.05 | Clearing the OHR (1nos) and different roof top water tanks surrounding which includes cutting bushes, shrubs and cleaning the dirt from the OHR premises and the roof surface respectively. (for such 6 nos operations in a working year i.e once in a 2 month) | 6 | LS | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.91 MB
BOQ_2536916.xls
BOQ • 0.39 MB
2911-N-pdf.pdf
Tender Documents • 1.09 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .