Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.2 LRejected-Finance | L1 | Rejected-Finance Less Amount | |
| 2 | L2₹9.8 L+₹60,346.92 (6.54%)Rejected-Finance | L2 | Rejected-Finance Second Less |
| Sl No | Description | Qty | Unit | DOMAS GOPAL L2 | KUMAR TV L1 |
|---|---|---|---|---|---|
| 1.00Providing CC pavement (Wearing Coat) in Bajanai Kovil Street at Adhi Dravidar Colony in Reddivalam Panchayat | |||||
| 2.00 | Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc. | 13.5 | Cum | 5,525 ₹74,588 | 5,520 ₹74,520 Lowest |
| 3.00 | C.C 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all etc.. Complete | 109.5 | Cum | 6,826 ₹7,47,447 | 6,825 ₹7,47,338 Lowest |
| 4.00 | Supplying and erecting of Centering for all PCC items including cost and conveyance labour charges etc complete. | 58.4 | sqm | 182 ₹10,629 | 180 ₹10,512 Lowest |
| 5.00 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}
(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 1,49,879.52 ₹1,49,879.52 | 1,49,826.6 ₹1,49,826.6 Lowest |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
20 Feb 2026, 4:00 pmClosed
The President
The President Panchayat Office Reddivalam
Providing CC pavement (Wearing Coat) in Bajanai Kovil Street at Adhi Dravidar Colony in Reddivalam Panchayat
2026_RDTN_662139_1
A2/4755/2025
Open Tender
Civil Works
Item Rate
Panchayat Office Reddivalam
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹10,000
Yes
7 Mar 2026
20 Feb 2026
20 Feb 2026
20 Feb 2026
20 Feb 2026
20 Feb 2026
Providing CC pavement (Wearing Coat) in Bajanai Kovil Street at Adhi Dravidar Colony in Reddivalam Panchayat
Cement Concrete 1:4:8 mix using 40mm metal including cost and conveyanceof all materials to work site and all labour charges etc.
C.C 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all etc.. Complete
Supplying and erecting of Centering for all PCC items including cost and conveyance labour charges etc complete.
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.94 MB
BOQ_794888.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .