Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L2₹44,936.91Accepted-Finance | ₹44,936.91 | L2 | Accepted-Finance All documents accepted |
| 2 | L3₹47,580.26Accepted-Finance | ₹47,580.26 | L3 | Accepted-Finance All documents accepted |
| 3 | Rejected-Technical | - | - | Rejected-Technical Due to insufficient EMD Amount uploaded only Rs 800 instead of Rs 1060 |
Tender Value
₹53,000
EMD Value
₹1,060
Closing Date
12 Sept 2026, 11:00 amClosed
Executive Engineer PHE Division Awantipora
Executive Engineer PHE Division Awantipora
Installation of New Water Supply Pipeline from HO Showkat Ah Mir to HO Mohd Ashraf Bhat at Nader Panzoo Aripal (Under PRI Grants)
2026_PHE_323619_6
NIT 12/PHE of 2026-27
Open Tender
Civil Works - Water Works
Percentage
15 days
Executive Engineer PHE Division Awantipora
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer PHE Division Awantipora
₹1,060
13 Sept 2026
6 Sept 2026
12 Sept 2026
6 Sept 2026
12 Sept 2026
6 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:1 meter from cutting edge. All kinds of soil : | 43.65 | Cum | 479.3 | ₹20,921.45 |
| 2 | Laying and fitting of G.I. pipes (all classes) complete excluding cost of pipes, fittings and Earth work. 25mm dia.G.I pipes. | 330 | Mtr | 33.7 | ₹11,121 |
| 2.01 | 20mm dia. G.I. pipes | 380 | Mtr | 22.25 | ₹8,455 |
| 3 | Making connection of G.I. distribution branch with G.I. main of following sizes by providing and fixing Tee, including cutting and threading the pipe etc. complete 25 to 40 mm nominal bore | 3 | Each | 730.25 | ₹2,190.75 |
| 4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides offoundations etc. in layers not exceeding 20 cm in depth, consolidating each depositedlayer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 39.28 | Cum | 218.4 | ₹8,578.75 |
| 5 | Carriage of Pipes from divisional store to actual site of work by M/T.including loading ,unloading and stacking complete. | 1 | Trip | 1,600 | ₹1,600 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
BOQ_1089858.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .